1286_001.pdfB58
E-APPL,ICAT'ION MEETING
SUBMITTAL REQUIR TS
PERMITTING & DEVELOPMENT
121 5th Avenue N
P: 425.771.0220
OPTION 1
❑ FORMAL PRE -APPLICATION MEETING
(SEE BACK PAGE)
$1,000.00 (1/2 will be applied toward the future
permit submittal)
Staff from the Building, Planning, Engineering and
Fire Departments attend the meeting, provide written
comments and answer questions regarding the
proposed project. This meeting is encouraged for
major projects prior to a formal application submittal
to the City. The goal is to identify MAJOR issues and
discuss processing procedures applicable to the
project.
Submit 1 set of plans with required information per
page 2.
NOTE: PRE-APP Meetings are scheduled forthe next
available date with a minimum of two weeks lead
time & DRC Meetings a minimum of one week.
OPTION 2
❑ DEVELOPMENT REVIEW COMMITTEE MEETING
Complementary, informal meeting
This is an informal opportunity to meet with staff
and discuss your preliminary ideas and concepts
for a project. The intent is to help identify the
major code requirements that will need to be
addressed and any significant site development
issues that may relate to the project. The intent is
for this to occur prior to considerable investment
in plans and/or design work. You may wish to
have your design professional(s) accompany you.
Submit 1 set of the following:
1) Site Plan
2) Vicinity Map
3) This completed form
4) Pertinent background information
5) Floor plans if applicable
6) List of questions regarding your proposed project
COMPLETE ALL REQUESTED INFORMATION
�
Zoning: � Lot Size: Sno County Tax Account Parcel #: �) � y. 5..i 1 X...
Site Address(s):
Existing Use/Occupancy:_e„,
Pre -Submittal for: ❑ Building Permit Only 21 Land Use Approval/ Permit
Revised on 0110412017 Page 1 of 2