Loading...
13-0190 & 0191 Plan Review Comments.pdf^` CITY OF EDMONDS • 121 5" AVENUE NORTH ® EDMONDS, WA 98020 PHONE: 425.771.0220 • FAX: 425.771.0221 •WEB: www.edmondswa.g DEVELOPMENT SERVICES DEPARTMENT: PLANNING • BUILDING March 19, 2013 Jonathan Richards Jonathan_59@hotmail.com RE: PLAN REVIEW COMMENTS FOR PLAN CHECK # 2013-0190 & -0191 NEW SFR AND DETACHED GARAGE AT 17134 TALBOT ROAD Dear Mr. Richards, I have reviewed the above building permit application for the Planning Division. Before I can sign off on the permit, however, the following information needs to be clarified in a written response: 1. Datum point: On Sheet A1.0, the datum point selected ('A') is described as a being a property corner. Is there a pipe or some similar type of monument there? The datum point needs to be a permanent physical object like a pipe, manhole cover, fire hydrant, or similar. Please label as appropriate. 2. Grading: Because a portion of the project site is within 200' of the Ordinary High Water Mark (OHWM) of Puget Sound, the Shoreline Master Program of Chapter 23.10 ECDC applies. The site is designated Suburban Residential II in the code. A single family residence in this area is exempt from a Substantial Development Permit if the unit is owner -built in accordance with WAC 173.27.040(g); however, grading for appurtenances in excess of 250 cubic yards would be subject to permit if it occurs within 200' of the OHWM. Currently, it is unknown how much grading is proposed, whether that grading will be inside or outside the 200' boundary of the OHWM, and if it would be for the main house or appurtenances. As a result, please update the site plan (A1.0) to show the 200' distance from the OHWM. Call out the amount of grading occurring both inside and outside the 200' boundary and describe whether the purpose of the grading is for the house or the garage, driveway, patio, utilities, etc. 3. Structural lot coverage: On the site plan (A1.0), please provide a structural lot coverage calculation for the proposal, breaking out the individual items contained in the calculation. ECDC 21.15.110, "[c]overage means the total ground coverage of all buildings or structures on a site measured from the outside of external walls or supporting members or from a point two and one-half feet in from the outside edge of a cantilevered roof, whichever covers the greatest area." 4. Patio encroachment: The proposed patio off the southwest corner of the house appears to encroach into the south 10' side setback. Please confirm that the patio meets the requirements of ECDC 16.20.040.0 which states: "Uncovered and unenclosed porches, steps, patios, and decks may project into a required setback not more than one-third of the required setback, or four feet, whichever is less; provided, that they are no more than 30 inches above ground level at any point." Revise Sheet A1.0 as appropriate. 5. Geotechnical report: Please have your geotechnical engineer include a statement in his report to the effect that the report complies with the requirements and standards found in ECDC Chapters 23.40 and 23.80. It should be noted that separate buffer and setback distances are required in accordance with ECDC 23.80.070 (buffers) and ECDC 23.40.280 (setbacks), unless otherwise provided. It is assumed that the "35' setback from the top of the slope (per geotech)" is to indicate a reduced 20' buffer and 15' building setback but please update the labeling on Sheet A1.0 as appropriate. All referenced code sections are available at the following website: http://www.mrsc.org/mc/edmonds/`Edmondsnt.html. Please submit three copies of your updated site plan (one being reduced size of 11 x 17 or smaller) and two sets of any updated sheets of the building plans. Please make all submittals to a Permit Coordinator, Monday through Friday, 8:00 am to 4:30 pm. If you have any questions, please contact me at (425) 771-0220. Sincerely, Mike Clugston, AICP Associate Planner