Loading...
14-0300 Plan review comments 3.pdfCITY OF EDMONDS ® 1215" AVENUE NORTH - EDMONDS, WA 98020 PHONE: 425.771.0220 ® FAX: 425.771.0221 ® WEB: www.edmondswa.g DEVELOPMENT SERVICES DEPARTMENT: PLANNING ® BUILDING April 9, 2014 June 16, 2014 July 1, 2014 Designs Northwest Architects dan@designsnw.com RE: PLAN REVIEW COMMENTS #3 FOR PLAN CHECK # 2014-0300 NEW SFR AT 340 SUNSET AVENUE Dear Mr. Nelson, I have again reviewed the above building permit application for the Planning Division. Before can sign off on the permit, the following information needs to be clarified in a cover letter and through submittal of updated plans with changes called out. Comments of July 1 are bold: 1. Seismic hazard geotechnical report: Mr. Lui's report dated May 12, 2014 describes the site as being underlain by Whidbey series soils. According to MRCS data, soils in the vicinity of the site include the Alderwood and Cluster series. Please verify and revise the report as necessary. Also, since it appears that the report is meant to apply to both 336 and 340 Sunset, please include the site plan for 340 Sunset as well. Unaddressed. Please submit the requested geotechnical report addressing the seismic hazard. Because the western portion of the site has been identified as a potential seismic hazard area, please submit a geotechnical report prepared according to the requirements of ECDC 23.40 and 23.80 that describes the proposed project. The report must be prepared in accordance with ECDC 23.40.090 and ECDC 23.80.050 and must specifically address the requirements in ECDC 23.80.050.H and ECDC 23.80.060. 2. Scale: Addressed. The scale on 1 is shown1 but • • be 1 Please verify. 1 3. Datum point: Unaddressed. According to Building Handout B41, you must select a datum point to establish • compute grade elevations designated four corners. The datum point must be a permanent point of reference. Use the top of a manhole cover, fire hydrant, or street monument. Reference the datum point elevation at +100 (or the actual elevation if known). On Sheet A1.0, describe the datum point and show its cw • Unaddressed. Please label the datum point as noted below. Please label the datum point used for height calculations on Sheet A1.0 and indicate whether the point's elevation is actual or assumed. 4. Project Data - Setbacks: Addressed. On Sheet A0.0, the setbacks shown in the Project Data box are incorrect. In the RS -6 zone, the street setback is 20', sides are 5' and rear is 15'. 5. South side setback: Addressed. The south 5' side setback must be taken from the edge of the access easement. Please verify. 6. Setback call out: Addressed. Call out the actual distances proposed from each property line (or access easement) to the closest portion of building or terrace post along that line. 7. Structural lot coverage: Addressed. Applicant has applied for a lot line adjustment (PLN20140025) to increase the size of the underlying parcel rather than decreasing the size of the house. The building permit cannot be issued until the lot line adjustment is complete. Structural lot coverage is calculated against net lot area so the coverage on Sheet A1.0 will need to be recalculated after subtracting out the area of the access easement. This will lead to a maximum structural lot coverage allowed for the site of 3,421 square feet (11,500 —1,725 = 9,775 x 0.35 = 3,421). Also, please verify that the structural lot coverage calculation for the proposal includes the house, covered terraces, and covered porches. ECDC 21.15.110, "[c]overage means the total ground coverage of all buildings or structures on a site measured from the outside of external walls or supporting members or from a point two and one-half feet in from the outside edge of a cantilevered roof, whichever covers the greatest area." 8. - •ht height rectangle was calculations: Partially addressed. It appears the adjust- - calculations are on Sheetlines original grade, proposed elevation heightthe - -- Partially addressed. The height rectangle on Sheet A1.0 was not revised. Please verify and update as necessary. It appears on Sheet A1.0 that the height rectangle corners are set at the outer edge of the roof as opposed to the walls of the building. Please move the rectangle corners in slightly to enclose the building and terrace posts. Make any adjustments necessary to the height calculations on Sheet A1.0 as well as the building plan elevation sheets (A3.1 and A3.2). Also on the elevation sheets, please show the lines of average original grade, proposed elevation of the house, and maximum allowed height for the project. 9. Setback encroachment: Addressed. Partially Addressed. Show the applicable property line setbacks on Sheets A2.1 and S2.1 and verify that all structures other than those allowed exceptions in ECDC 16.20.040(8) and (C) meet the setback requirements for the RS -6 zone. For example, all arbor features (posts, wraps and beams) must meet setback requirements. Update the patio dimensions on Sheet A2.1 as well. It appears that the patio off the northwest corner of the house will not meet code requirements for setbacks. For patios, ECDC 16.20.040.0 states, "Uncovered and unenclosed porches, steps, patios, and decks may project into a required setback not more than one-third of the required setback, or four feet, whichever is less, provided, that they are no more than 30 inches above ground level at any point." The north side setback is 5' so the patio may only encroach into the north setback a maximum of 1.65' rather than the 4' shown on Sheet A1.0. Please verify and revise the site and building plans accordingly. All referenced code sections are available here: http://www.codepublishing.com/wa/edmonds/. Please submit three copies of your updated site plan and two sets of any updated sheets of the building plans. Please make all submittals to a Permit Coordinator, Monday through Friday, 8:00 am to 4:30 pm (8:00 am to 12:00 pm on Wednesdays only). If you have any questions, please contact me at (425) 771-0220. Sincerely, Mike Clugston, AICD Associate Planner