14497 Final Soils Letter 9-28-15.pdf[we] g m 0 " Val Ig I bwwn KDW Salas O'Brien 10202 Fifth Avenue Northeast, Suite 300 Seattle, Washington 98125 Attention: Eric Ramsing Subject: Geotechnical Engineering Observations Proposed Starbucks Building 9801 Edmonds Way Edmonds, Washington Dear Mr. Ramsing: 13256 Northeast 20th Street, Suite 16 Bellevue, Washington 98005 (425) 747-5618 1 GEOTECENW.COM September 28, 2015 JN 14497 via email; eric.ramsing@salasobrien.com We provided a geotechnical engineering study for this project dated January 16, 2015 as well as a plan review letter dated April 13, 2015. Most recently, our personnel was onsite during the early earthwork and foundation work for the project. We understand that the City of Edmonds is requesting a final letter regarding our onsite observations. As such, we have prepared this letter. Our personnel were onsite in mid-May 2015 at the start of the installation of pipe piles needed for the foundation of the building. We initially observed at that time excavations of only about a few feet had been made at the flat site in preparation for the installation of the piles. This excavation was quite minor and easily kept within the project boundaries. Our personnel were onsite during the driving of the pile piles needed for the foundation of the building. In total, 61 pipe piles were installed. Four of the pipe piles were 4 inches in diameter, while the other 57 were 3 inches in diameter. The piles were driven with an 1100-foot/pound hammer to a refusal rate of 6 or 10 seconds per inch for the 3 or 4 -inch piles, respectively. The piles were installed to final depths mostly in the range of 20 to 30 feet. In our opinion, the 3 and 4 - inch pipe piles were adequately installed to the design capacity of 6 and 10 tons, respectively. If there are any questions regarding this letter, please contact us. Respectfully submitted, GEOTECH CONSULT D. Robert Ward, P. E. Principal DRW:at