1482.01_390 Sunset Avenue North_ ZGA DFR 002_08-21-2015.pdf Zipper Geo Associates Daily Field Report ZGA Project Daily Field 002 1482.01 Page: 1 of 2 No.: Report No.: Project: Neuman Residence Location: 390 Sunset Ave North, Edmonds, WA Client: Babbit Neuman Const. Co. Contractor: Babbit Neuman Const. Co. ZGA Field Rep: Nick Millman Permit No.: BLD20150223 Date: 08-21-2015 Arr./Dep. Time: 8:15 am / 8:40 am Equipment Tracked excavator Weather Overcast, 60 Used: We arrived at the request of the client to observe receptor soil conditions for the site infiltration facilities. A summary of our observations and recommendations is presented below. Southeast Infiltration Facility Upon arrival, we observed that the contractor had completed the trench excavation for the SE infiltration facility. The approximate extent of the excavation is shown on the attached site plan. The excavation was about 5 to 5 ½ feet wide and extended about 7 feet below existing grade. The trench excavation was approximately 34 feet long. The bottom and sides of the trench were covered with non-woven filter fabric and the first segment of StormTech structure and crushed rock had been placed at the south end of the trench. The 6 inch layer of low permeability silt had been excavated and removed. The floor of the trench generally consisted of brown fine sand with some silt, which is consistent with the design receptor soils and project plans and is adequate for the infiltration facility subgrade, in our opinion. The contractor informed us that they would be filling the trench with crushed rock today and would then be starting excavation of the NE infiltration facility. Reviewed by: This field report presents the results of our on- The contractor is responsible to complete the project in accordance with the approved plans and specifications regardless of our presence on site and our subcontractors or responsibility for job site safety.