Loading...
1576_001.pdfa8;ÍG June 6, 2019 To: Mr. Leif Bjorback Building Official Development Services Department .^r FtÈ ^121 ün Avenue North 1çarlnect - \ l -, -l'; ì) JUr',! 2 i 2üiE iai {:1 q'å.) 4- È'i' "nR r.é c. " I I { .,¡ r il tJþ L:Úir¡¡r¡, t1"'" ; Re Plan Check: BLD2019-0397 Kahlo's Cantina Addition/Remodel at 102 Main Street Mr. Bjorback, I am providing the following information in response to the plan check comment letter from your department dated May 20, 2019 for the above referenced project. General 1. Please provide a copy of the plan review letter from Snohomish Health District. Response: A copy of the plan review letter will be provided to the City when the project receives approval from Snohomish Health District. 2. According to the City's adopted Flood lnsurance Rate Map (FIRM), a portion of the properly lies within the boundary of Flood Zone AEl2. ln order to establish that the building is not within the flood zone, a survey is required by a professional land surveyor prior to completion of the Building Division review of this permit. Response: Designations on the current "effective" FIRM map available through the FEMA Flood Map Service Genter website indicate the site is not located in a flood zone. 3. Special inspections have been identified for the project. Please complete and return the attached special inspection agreement form at any time prior to issuance of the permit. Response: Noted. Sheet 41.1 4. Add 2015 lnternational Existing Building Code (IEBC) to the codes listed on this sheef. Response: The above referenced code has been added. 5. Reference Site Plan Note 16 which says "New masonry or concrete retaining wall to replace rockery." Please clarify the overall height of the referenced wall as well as clarify the height of unopposed grade. Provide construction details for this wall. Response: The current rockery will remain and will not be replaced with a retaining wall. 2812 Colby Avenue P (425)252-2153 Everett WA 9820'l wv,¡w.281 2arch itecture. com a84G Plan Review Comments for Plan Check # 2019-0397 Project Name: Kahlo's Cantina June 6, 2019 6. Reference Site Plan Nofes I and 10 regarding sidewalks with a max¡mum slope of 8%. Watkways exceed¡ng 5% slope are considered ramps, and will need to meet the requ¡rements of IBC 1012 for ramps and IBC 1014 for handrails. Show on the plans design and details sufficient to verify compliance with these requirements. Update the Site Plan Notes accordingly. Response: Notes 9 and 10 have been amended to state a maximum slope o15%. 7. Provide a tanding outside of both gates with a minimum run of 5 feet (as for ramp landings, IBC 1012.6.3) and a maximum s/ope of 2%. IBC 1010.1.5 and 1010.2 Response: A landing has been added outside of both gates. Please see corresponding detail 71A.1.3. 8. The tanding outside of each gafe rs required to extend 18 inches in width beyond the latch side of the gate to provide an accessible approach. See ICC A117.1 section 404.2.3. Response: See response to comment 7. 9. Provide an illuminated exit sign at both exterior gates. IBC 1013 Response: Per IBC lO13.1exception 2, in an emergency it is expected patio occupants will exit away from the structure through the provided patio gates and sidewalks to the public way as this is the most obvious and identifiable way to exit the patio away from the structure. Sheet 41.2 10. tn the ptan set provided, there are two 'A1 .2'sheefs. Please correct the one also labeled "Site Details" in order to agree with the Drawing lndex on sheet A1.1. Response: Drawing numbers have been corrected. Sheet 42.0 1 1. Occupant Load. a. As previously discussed, the seating calculations for the Bar area should be based on an occupant load factor of 1 person per 7 square feet. This reviewer's calculations result in a Bar seating (not Bar prep area) OL of 12 based on approximately 81 square feet. Please revise the Bar seating OL on the plans and adjust the Dining area OL accordingly. Response: Occupant loads have been revised. b. The resulting occupant load for the building is approximately 102, which is beyond the threshold of 100 at which fire sprinklers are required. lf you so choose, you may propose a maximum occupant load of 99 in order to avoid this requirement. The maximum occupant load must be posted near the main entrance as per IBC 1004.3. lndicate this on the plans. Response: A note requiring the maximum occupant load posted and location has been added. 2812 Colby Avenue P (425)252-2153 Everett WA 98201 www.281 2arch itectu re. com a84G Plan Review Comments for Plan Check # 2019-0397 Project Name: Kahlo's Cantina June 6, 2019 Sheet 42.1 12. The Demolition Ptan indicates the demolition of a substantial portion of the existing structure. Please be aware that structures that are demolished to the level that meets or exceeds 75% of the replacement cast af the structure will not be allovved by city code to be rebuilt except to fttll- on standards for new construction. Reference Edmonds Community Development Code section 17.40.020(F). ln order to verify that your project does not meet this threshold, the following must be provided to the city: a. A cost breakdown showing the demolition is /ess than 75% of the replacement cost of the building. b. The permit drawings must demonstrate coordination with the cost breakdown. Please contact me if you need furfher clarification on this issue. Response: The guidelines of ECDC 17.40.020(F) apply to nonconforming buildings that are damaged or destroyed in an amount equal to75% or more its replacement cost at the time of destruction. The purpose of the portion of building shell proposed to be removed is not due to damage or destruction but rather to offer improved design for both an interior and exterior experience. A portion of the interior demolition, specifically for finishes and fixtures, was done under a previously issued demolition permit for which no similar comment was issued by the City recognizing this section of code. ln terms of square footage, the remaining demolition work described on this plan, accounts for roughly less than 35% of the existing building shell and slab. Approximately 65% of the existing building shell and slab will remain intact. Proposed building elements and exterior finishes conform to Gity design standards and structural improvements bring the building up to current code standards. Sheet 42.2 13. Reference wood framed wall "8" at the norfh end of the Type t hood. Wood framing is not allowed within 18 inches of the Type t hood. Please revise the plans accordingly. IMC 507.2.6 Response: The wall type has been changed to reference the appropriate type for this condition. 1 4. Reference the sfee/ sfud watl at gridline 2. Provide a minimum separation of 18 inches from the Type t hood to the existing columns within the wall. Coordinate any structural changes made with the structural drawings as needed. Response: The existing columns are beyond the minimum 3" clearance requirement from combustibles per item 9 (c) in the Gommercial Kitchen Hood & Hood Fire Suppression System Requirements Gity handout when protected with a l-HR fire resistive material. Note 10 has been revised to reference the City handout and an additional note has been added to the wall type general notes for a fire-rated gypsum wall board. 15. Please verify that all wood framing rs af /easf 18 inches from the Type t hood. Response: See response to comment 14. 2812 Colby Avenue P (425)252-2153 Everett WA 98201 v'¡v'rw.2B1 2architecture.com a84G Plan Review Comments for Plan Check # 2019-0397 Project Name; Kahlo's Cantina June 6,2019 16. Clarify the designation of walltype 'X'that occurs near the back door. Response: Walltype has been labeled. 17. Clarify the designation of window type 'X' at the Private dining room. Response: Window type has been labeled. 18. Provide the design and specifications for the relocated walk-in cooler sufficient to show compliance with WSEC section C410.2 if not site built, or C410.2.1 if site built. WSEC C503.1 Response: The existing walk-in cooler will remain in its current location and will not be relocated. An additionalwalk-in cooler is proposed in the bar area. Please see attached man ufactu rer specifications. Sheet 42.3 19. Please remove the callout for detail '6' at the canopies as that detail does not relate to the canopies. Response: The correct callout and note have been provided. 20. ln the Ceiling Plan Legend, show the wattage for each light fixture in order to facilitate proper installation and inspection. Response: Light fixture wattage is located in the lighting schedule on drawing lD3 of the interior design drawings included with this set of corrected drawings. The WSEG lighting compliance forms have been revised to include the updated lighting layout. Sheet 44.4 21. Reference Secfion 1 showing the slab perimeter insulation under the slab. This detail needs to be revised to show the rigid insulation on the exterior of the concrete slab/footing in order to meet the intent of the energy code. WSEC C402.1.3 Response: Sections have been revised to show the rigid insulation on the exterior of the footing. Detail 2lA4.1has been added. Sheet 52.1 22. Please provide a connection detail for the column to beam connections at gridline B-3. Response: Detail 9/54.0 has been added. Sincerely, Jeff rt ieff @281 2a rch ite ctu re. com 2812 Colby Avenue P (425)252-2153 Everett WA 98201 www .28 1 2ar ch itectu re. co m