16.089 Chung - Response Letter Lot 1.pdf
CORPORATE OFFICE
5920 100th St SW, Ste 25
Lakewood, WA 98499
(253) 984-2900
b eylerconsulting.com
Plan. Design. Manage
CIVIL & STRUCTURAL ENGINEERING | LAND SURVEYING | PLANNING
PROJECT MANAGEMENT | FEASIBILITY | PERMIT EXPEDITING
March 20, 2019
JoAnne Zulauf
City of Edmonds
RE: CHUNG – SINGLE FAMILY RESIDENCE
Address: 721 Edmonds Way Lots 1
Application #: BLD20181098
BC Job# 16.089
JoAnne:
The purpose of this letter is to address your review comments dated December 17, 2018 for
the project known as Chung – Single Family Residence Lot 1. To expedite your review and
approval of the subject plans, below are our responses in bold, with your comments included
herein for reference. All other comments can be considered completed as noted.
ITEM
NO. ACTION / COMMENTS RESPONSE
Request For Information Respond in bold
1 Plan submission shall show short plat infrastructure… Updated.
2 Remove section of Lot 1 impervious surface… Removed.
3 Please lighten line for all information for the other two… Updated.
4 Submit Side Sewer Permit Application form Will be provided with
the next submittal.
5 Include a City Division approval block on all plan sheets. Included on lower right
corner of every sheet.
6 Include construction sequence. Included on sheet C2.0
7 Include General Construction Notes. Please change the… Included on sheet C2.1.
Date updated.
8 Add City of Edmonds standard details for all tesc, storm… Details added to sheets
C2.1, C3.1, and C3.2
9 Add Olympic View Water Sewer District standard details
for the water meter and connection.
Water meter and
connection will be
constructed as part of
the short plat
improvements and are
considered existing.
10 A rockery is shown along the access road. The City of
Edmonds does not review or approve rockeries.
N/A, rockery was
removed.
Page 2 of 4
Construction of rockeries is prohibited within the City of
Edmonds under certain circumstances and in certain
situations per Edmonds Community Development Code
18.40.020. Please review the code section to verify this
rockery falls outside of the prohibitions. Top and toe
elevations for the rockery are required at each end of the
wall and at every two feet of change.
11
A Stormwater Covenant is required to be recorded against
the property based on the proposed stormwater facilities for
the project. Please complete the covenant, including
notarization and any required exhibits and submit to the
city. Ensure the stormwater covenant meets Snohomish
County Record Drawing requirements. The document must
be complete, but will not be recorded prior to permit
issuance. Prior to construction, final location of facilities
are to be verified (by field inspection and asbuilt) and then
the covenant will be recorded.
Will be provided with
the next submittal.
12 Show all private easement information for this lot only
within the plan set submittal.
Underground power
easement labeled on
sheet C3.0.
13
Show the short plat proposed frontage improvements as
existing. Remove form the plan everything that is existing
to be removed.
Updated.
14 Show the new location of the power pole.
The location of the
power pole is shown on
the plans. Plotted in
light color as it is part of
the short plat and will
already be constructed.
15
Add a note to the plans stating existing failing, damaged or
non-ADA compliant frontage improvements shall be
removed and replaced as determined by the City
Engineering Inspector.
Included on sheet C3.0.
16 Show driveway entrance. Add standard detail to plans.
Driveway shown.
Driveway approach to
be constructed as part
of short plat and
referenced in short plat
plans.
Page 3 of 4
TESC
ITEM
NO. ACTION / COMMENTS RESPONSE
Request For Information Respond in bold
1 Show filter fence on the plans and incorporate and… Shown on C2.0. Detail
on Sheet C2.1.
2 Show construction entrance on the plans and incorporate… Shown on C2.0. Detail
on Sheet C2.1.
3 Please show and add note to the plans that filter socks… Shown on C2.0. Detail
on Sheet C2.1.
4
Orange protective barrier fencing shall be place at the drip
line of trees to remain and around areas proposed for low
impact development techniques, such as rain gardens,
infiltration systems, etc. to protect the area from
compaction.
Orange fencing to be
provided around
infiltration facility.
5 Please provide the location of the temporary stockpile. Add
a note that the stockpile is to be covered within 24 hours
N/A, rough grading to
be completed as part of
short plat
improvements.
6 Please add a note to the plans that all disturbed soils will be
compost amended per BMP T5.13 Added to sheet C2.0
7 Add Note: Install and maintain all TESC measures … Added to sheet C2.0
SEWER
ITEM
NO. ACTION / COMMENTS RESPONSE
Request For Information Respond in bold
1
Label pipe material and size. The sewer lateral, (from the
main to the edge of easement, shall be 6”. Once line is only
used by Lot 1, it can be reduced to 4”.
Labeled. Line reduced to
4”.
2 A clean out is required at the property line between Lot 3
and Lot 1.
Clean out at property
line of Lot 1 and 3.
3 Provide invert elevations at the main, the cleanout at the
easement line and at the house so that …
Inverts provided, 2%
minimum slope and 2’
minimum cover
proposed. No pipes
exceed 20%.
Page 4 of 4
STORM
ITEM
NO. ACTION / COMMENTS RESPONSE
Request For Information Respond in bold
1 No stormwater system is shown on this plan. Add the… Stormwater information
provided.
2 Show where the footing drains will discharge.
Due to high infiltration
rates footing drains
were not included.
3 Show where the rockery drainage will discharge. N/A, rockery was
removed.
4 Provide invert elevations for all pipes at catch basins and
manholes. Provided.
5 Please add a note to the plans that if the rim to invert… Note added on sheet
C3.0.
Sincerely,
Travest Story, P.E.
Civil Engineering Director
Beyler Consulting, LLC