Loading...
1617_001.pdfDATE: June 28,2019 TO: City of Edmonds Building Department FROM: Curt Brodrick, Pilates Edmonds representative RE: Response to plan review comments Plan Check; BLD2019-0630 Project; Tenant buildout for Pilates Edmonds Project Address; 201 Main Street #103 ttæ*dgñ.clE.:. Seannen ['\fTf]gfll] Ë'ta i¿,o +d t# l:-D Jt,L 0 î 2019 EUI LNING NEPAHTïÚIE!\"'- -Ö¡'rY oF [:DMÛri!9)S To whom it may concern; Responses to Sheet 1 comments; La. Revisions to plans showing accurate square footage have been made. Lb. Square footage of office, restroom and rear circulation area have been noted as well as square footage of Pilates area. Please use IBC LOO4.L.Z Exception where as the building official may use an occupant load factor based on whom the occupied space is designed. Please find Suite Equiptment and Use Layout to determine occupant load attached with revised plans sheet 5. Lc. Revisions have been made to sheets 1 and sheet 2 Responses to sheet 2: 2. Bathroom details have been revised to provide more legible details. 3. As per IBC 1010.1.2 Exception 9 ln other than H occupancies, manually operated horizontal sliding doors are permitted in a means of egress from spaces with an occupant load of L0 or less. We meet these requirements. Doors will also comply with L0L0.1.3. 4. Plans revised to reflect all door hardware to comply with IBC 1010.9.1 and be ADA ' compliant. 5. Separate restrooms are not required where the occupant load is 15 or less per IBC 2902.2 Exception S2. 6. Drinking fountains are not required for occupancy loads 30 or less per IBC 29O2.5.L. Responses to Sheet 4 7. Revisions to plans have been made to reflect occupancy sensor switches in office space. Thank you, Curt Brodrick, Brodrick Construction lnc. Pilates Edmonds 206-949-1996 ccbrodrick@smail.com