162 St City Park_BLD20080182.pdf City of Edmonds TH 121 5 AVENUE NORTH EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Engineering Division Civil Plan Review Comments Application #: BLD20080182 Date: May 29, 2008 Project Name/Address: 162 Street City Park / Intx of 75 Ave W and 162 St SW Contact Person/Address, Fax or E-mail: Jaime Hawkins / Hawkins@ci.edmonds.wa.us Reviewer: Edward Sibrel Division:Engineering During review of the civil drawings for the proposed subdivision it was found that the following information, corrections, or clarifications will need to be addressed. Please resubmit 3 copies of the revised civil drawings and associated documents with a written response to each item to an Engineering Technician. Please contact me at 425-771-0220 or by e-mail at sibrel@ci.edmonds.wa.us if you have specific questions regarding these plan corrections. 1.Grading. Unable to locate any grading / cut / fill calculations or quantities for the project. 2.TESC • Show how / where onsite water will be retained for sediment removal prior to discharge. • Show how offsite water is to be intercepted and routed around site during construction. • Show a method for dealing with groundwater, should it be encountered during construction. • Because of its proximity to water bodies and its location within the Earth Subsidence and Landslide Hazard Area (ESLHA), it’s recommended a Certified Erosion & Sediment Control Lead (CESCL) monitor the TESC during construction. • Per ECDC 19.10.040(C), a statement is required from the engineer who prepared the geotechnical report addressing the adequacy of the civil plans and TESC in meeting the recommendations of the report. • Include the appropriate Edmonds Standard Details with the plan set. 3.Drainage. •ECDC 19.10.030(F)(1) requires the drainage be designed by a licensed engineer, and that design must be accompanied with the submittal of calculations that show the design does indeed limit the peak rate of runoff to the predeveloped condition two-year, 24-hour design storm, while maintaining the predeveloped condition peak runoff rate for the 10-year, 24-hour and 100-year, 24-hour storms. 4.Peer Review. Address the points raised by the peer review of the geotech report: DATE E-MAILED 5/29/08 PAGE(s) 1 of 2 City of Edmonds TH 121 5 AVENUE NORTH EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Engineering Division Civil Plan Review Comments • The possible increase in slope instability caused by the fill behind the retaining wall; • The consistency between the geotech report and the plans regarding the method for supporting the retaining wall; • The lack of geogrid reinforcement behind the retaining wall; • Showing how and where the retaining wall drains; • Addressing the shoring / stability issues relating to excavating the 10’ trench for the slope drain; • The lack of invert information on the slope drain; • No construction details were included for the slope drain itself. DATE E-MAILED 5/29/08 PAGE(s) 2 of 2