rNil6HT EilGlHtËnlNG co
Re:
July 3,2019
JoAnne Zulauf,Engineering Technician IZ Aq-BF-AÞ^ L.AgT PAe-€
l2l 5th Ave North
Edmonds, WA 98020
(42s) 771-0220
235th SFR -B.LD20190544
IECO No. l8-0969
Dear JoAnne,
The project referenced above is revised in response to the review comments dated May 20,2019.
The review comments are numbered on the letter and have been addressed in italics as follows:
GENERAL
1) Please note that all standard details have been updated and have new reference numbers.
Review the changes on the city website and update plans.
The new details and numbers have been updated.
2) Submit ROW Permit Application form
N/A
3) Submit Side Sewer Permit Application form
N/A
4) General Construction Notes. #19 states the footings will be connected downstream of the
infiltration system but the plans show the footings being routed to the infiltration system.
That general note has been removedfrom the plan set. There is no other placeþr the
.footing drain to go.
5) A Stormwater Covenant is required to be recorded against the property based on the
proposed stormwater facilities for the project. Please complete the covenant, including
notaúzation and any required exhibits and submit to the city. Ensure the stormwater
PO Box 1478 o Everett, WA 98206 o Phone: (425) 303-9363
Fax: (425) 303-9362 I Email:info@insightengineering.net
covenant meets Snohomish County Record Drawing requirements. The document must
be complete, but will not be recorded prior to permit issuance. Prior to construction, final
location of facilities are to be verified (by field inspection and asbuilt) and then the
covenant will be recorded.
The owner is in consultøtion with the city on the drainage easement form.
6) Show and label all private easement information within the plan sets. If AFN's for
existing easements andlor recording documents for proposed easements note as
applicable.
All easements on the site and off the site will be recorded with the short plat. One
drainage easement on lot C is shown in the NE corner of the site.
7) Show all City utilities that arc adjacent to the site
There ore no city utilities adjacent to the site.
SITE PLAN
S) The site plan shall show all utilities with labels stating name of utility or specific line
types. Sewer is not shown to the main. The infiltration trenches on both sides of the
property shall be labeled and noted what run off they are collecting. The driveway and
structures shall be dimensioned.
The driveway and structures are dimensioned. Please see new site plan.
9) The City's Public Works Operations and Maintenance Department provides Fire/Aid
address signs, as required, upon payment of required fees ($75lsign). Two (2) frre aid
address signs will be required with the proposed development and the plans shall reflect a
process that requires the contractorþroperty owner to contact the Engineering Division
by email at engineeringpemits@edmondswa.gov 2-weeks in advance of the requested
sign fabrication. (These may have been purchased during the subdivision process)
Signs have been ordered as part ofthe short plat process
TESC
l) Please correct the current standard detail reference numbers.
The standard details have been updated.
2) Orange protective barrier fencing or orange silt fencing shall be placed at the drip line of
trees to remain and around areas proposed for low impact development techniques, such
as rain gardens, infiltration systems, etc., to protect the area from compaction.
PO Box 1478 o Everett, WA 98206 r Phone: (425) 303-9363
Fax: (425) 303-9362 I Email:info@insightengineering.net
Please seefence.
3) Add a note that the stockpile is to be covered within 24 hours
Please see note 2 on sheet Cl.
4) Add note: Install and maintain all TESC measures according to approved plans, City of
Edmonds standard details, and all other measures that may be required during
construction.
Please see note 3 on sheet CI
WATER
1) As indicated by the Fire Department, a fire sprinkler system is required for this property
Typically if there is an existing water service line from the watermain to the meter, the
water service line/meter will not be the appropriate size and a new tap will be required.
The applicant will be required to pay for the new tap on the main and the new meter.
Please revise plans to inolude the following:
a. Please add a note that a 1" meter is to be installed
Please see note I on sheet C2.
b. Show the water meter located in the right-of-way, such that the back of the meter
is on the property line. The water meter shall not be located within the driveway.
Please see the expanded viewport of C2.
c. Please show a l-112" water service line to be installed from the back of the meter
to the house (as required for a combination frre and domestic service).
See callout in driveway for wøter line size.
d. Please label the pipe material and note tracer wire to be installed on the water
service line.
See callout in driveway for water line size.
2) Show that there is a minimum of 3' of horizontal separation between the water servlce
and dry utilities (i.e. power, phone, gas, cable, etc.). A minimum of 10' of horizont¿l
separation is required between water and sewer lines.
The separation has been shown. It should be noted that the utilities offsite were approved
and constructed as part of the original short plat.
PO Box 1478 o Everett, WA 98206 o Phone: (425)303-9363
Fax: (425) 303-9362 o Email:info@insightengineering.net
3) Utility plan should show the water line to the main and the water meter. Note size of
water meter and line. Refer to #1.
Please see revised viewport on sheet C2.
SEWER
l) The Utility plan should show the entire sewer run from the main line to the house.
Please see revised viewport on sheet C2.
2) Label pipe material, length and size. The sewer lateral (from the main to the property
line/edge of easement shall be 6". Once on private property the sewer may reduce to 4"
The sewer line is shown.
3) Show a 6" cleanout at the property line/edge of easement. Please add a note that the 6"
cleanout at the property line shall have a l2'o cast iron lamphole cover withYz" hexbolts.
The cleanout has been shown.
4) Show a cleanout located within 2' of the house, at any 90o bend, when there is less than
3' between two 45o bends, and when there is more than 100' between cleanouts.
A cleanout has been added next to the house.
5) Provide invert elevations for the cleanout at the property line and at the house so that a
minimum 2%o slope and minimum2' pipe coverage can be verified.
Please see invert elevation shown on C2
DRY UTILITIES
l) Show all dry utilities and required utility separation. Please add a note thataminimum of
3' separation is required between the dry utilities (power, gas, phone, cable, etc.) and
se\iler, water, and storm and 5' from any City main lines.
Please see notes 6 & 7.
STORMWATER
l) A minimum of 2' of cover is required for all pipes located under drivable surfaces, please
revise plans.
Plans have been revised.
PO Box 1478 o Everett, WA 98206 r Phone: (425) 303-9363
Fax: (425) 303-9362 r Email:info@insightengineering.net
2) Please add a note to the plans that if the rim to invert elevation exceeds S-feet then a type
II manhole will be required.
See note 9 on sheet C2.
Comments from Zach Richardson, Stormwater Engineer
June 18,2019
Review Comments:
l. General: It appears that no drainage report or memo was included; included a drainage
report or memo which states how the site specific proposal under this permit meets the
requirement of ECDC 18.30 and/or how it complies with the previously approved plan.
a. Include sizing calculations for the infiltration trench.
Please see drainage report.
2. Cl: Update sheetto address elements #13 (protection of LID facilities) both before and
after installation of the infiltration trench.
a. Prior to installation, the area can be protected with construction fencing or notes
shall be added to over excavated and obtain geotechnical engineer's approval
prior to placing rock for infiltration facility.
The infiltration system has already been constructed. No notes are needed.
b. Add notes to direct contractor to protect infiltration capabilities after installation.
Please see the orange banier fence shown on sheet Cl.
3. C2: Provide details, dimensions, and elevations for the infiltration facility as needed for
construction.
N/A - Infiltration system constructed with short plat.
4. C2: Add & callout an inspection port; add detail as needed for construction.
N/A - Infiltration system constructed with short pløt.
5. C2: Identify the two circular objects near north side of facility (assumed to be cleanouts);
provide detail as needed for construction.
N/A - Infiltration system constructed with short plat.
6. C2: Show setback dimensions from the facility to property lines (5' min).
N/A - Infiltration system constructed with short plat.
PO Box 1478 o Everett, WA 98206 r Phone: (425)303-9363
Fax: (425) 303-9362 r Email:info@insightengineering.net
7. C2: Provide/callout floatable separation at CB #2 (down-turned elbow, vertical tee, etc)
Please see detail l/C2.
8. C2: Adjust rim elevation of CB #l for positive drainage as aruows suggest; currently the
rim elevation is higher than most of the surrounding driveway area.
Okoy, done
Comment from Brad Shipley, Associate Planner
June 18,2019
Lot Coverage: "Coverage" means the total ground coverage of all buildings or structures on a
site measured from the outside of external walls or supporting members or from a point two and
one-half feet in from the outside edge of a cantilevered roof, whichever covers the greatest area.
n Maximum lot coverage is35Yo for the designated zoning. Plans indicate 42.7%olot
coverage; however, the calculation is inaccurate. Please review the above definition and
re-calculate.
Okay, the lot coverage has been recalculated.
Please feel free to contact me with any questions or comments you may have.
Sincerely,
4//t
4-),qr"*
Brian Kalab,P.E