Loading...
17-0398 & 0399 plan review comments.pdfApril 25, 2017 Lawrence Houston lawrencehouston@comcast.net RE: PLAN REVIEW COMMENTS FOR PLAN CHECK # BLD20170398 & BLD20170399 NEW SINGLE FAMILY RESIDENCE AND DEMO AT 20902 HILLCREST PLACE Dear Mr. Houston, I have reviewed the above building permit applications for the Planning Division. Before I can continue with my review, please address the following comments in a cover letter and through the submittal of updated reports and plans with changes called out: 1. Datum point: On the Site Plan, please label the datum point used as the basis for the height calculations along with its elevation, whether actual or assumed. The fire hydrant or water meter east of the lot would be solid points of reference (see Handout B41 for guidance). 2. Lot coverage: On the Site Plan, please verify the calculated structural lot coverage and update as appropriate. 3. Geotechnical report: Please have Mr. Isaacs update his January 20, 2017 report to address the proposed demolition and construction in accordance with Chapter ECDC 23.80. The report must be prepared in accordance with ECDC 23.80.050 and specifically address the development standards in ECDC 23.80.060 & .070. The determined setback and/or buffer needs to be shown on the Site Plan as well as the TESC and Stormwater plan sheets (A.02 & A.03). 4. Notice to title: Pursuant to ECDC 23.40.270.13, sites with field -verified presence of critical areas and/or critical area buffers for which a permit application is submitted must record a notice of the existence of the critical area and/or critical area buffer against the property with the Snohomish County Auditor's Office as a condition of permit issuance. Attached is a Notice of Presence of Critical Areas for the subject lot; please have it signed and notarized. Prior to issuance of the building permits, this form must be recorded with the Snohomish County Auditor's Office. Options for recording include: a. Provide the City processing fee of $100 plus the County recording fee of $76 for each lot ($73 for first page and $1 for each additional page), for a total of $176, and the City will record the notice for you; M CITY OF EDMONDS * 1215" AVENUE NORTH * EDMONDS, WA 98020 PHONE: 425.771.0220 •FAX: 425.771.0221 0 WEB:+v± r. dr ro tdv�ov DEVELOPMENT SERVICES DEPARTMENT: PLANNING * BUILDING April 25, 2017 Lawrence Houston lawrencehouston@comcast.net RE: PLAN REVIEW COMMENTS FOR PLAN CHECK # BLD20170398 & BLD20170399 NEW SINGLE FAMILY RESIDENCE AND DEMO AT 20902 HILLCREST PLACE Dear Mr. Houston, I have reviewed the above building permit applications for the Planning Division. Before I can continue with my review, please address the following comments in a cover letter and through the submittal of updated reports and plans with changes called out: 1. Datum point: On the Site Plan, please label the datum point used as the basis for the height calculations along with its elevation, whether actual or assumed. The fire hydrant or water meter east of the lot would be solid points of reference (see Handout B41 for guidance). 2. Lot coverage: On the Site Plan, please verify the calculated structural lot coverage and update as appropriate. 3. Geotechnical report: Please have Mr. Isaacs update his January 20, 2017 report to address the proposed demolition and construction in accordance with Chapter ECDC 23.80. The report must be prepared in accordance with ECDC 23.80.050 and specifically address the development standards in ECDC 23.80.060 & .070. The determined setback and/or buffer needs to be shown on the Site Plan as well as the TESC and Stormwater plan sheets (A.02 & A.03). 4. Notice to title: Pursuant to ECDC 23.40.270.13, sites with field -verified presence of critical areas and/or critical area buffers for which a permit application is submitted must record a notice of the existence of the critical area and/or critical area buffer against the property with the Snohomish County Auditor's Office as a condition of permit issuance. Attached is a Notice of Presence of Critical Areas for the subject lot; please have it signed and notarized. Prior to issuance of the building permits, this form must be recorded with the Snohomish County Auditor's Office. Options for recording include: a. Provide the City processing fee of $100 plus the County recording fee of $76 for each lot ($73 for first page and $1 for each additional page), for a total of $176, and the City will record the notice for you; M Take the covenant to the County and record it for the County's recording fee of $73 for one page plus $1 for each additional page, and return a copy of the recorded notice to the Edmonds Planning Division with the Auditor's recording sticker on the copy. All referenced code sections are available here: htt : v�rvrv«r.code ublishin om wa edmonds . Please submit two copies of any updated plan sheets and reports. Make all submittals to a Permit Coordinator, Monday through Friday, 8:00 am to 4:30 pm (8:30 am to 12:00 pm on Wednesdays only). If you have any questions, please contact me at (425) 771-0220. Sincerely, Mike Clugston, AICP Associate Planner