Loading...
17-1040 plan review comments.pdfCITY OF EDMONDS • 121 5" AVENUE NORTH • EDMONDS, WA 98020 PHONE: 425.771.0220 • FAX: 425.771.0221 • WEB: www.edmondswa.gov DEVELOPMENT SERVICES DEPARTMENT: PLANNING • BUILDING September 1, 2017 Scott Delap Scott Delap Construction Company LLC scottdelapconstruction@comcast.net RE: PLAN REVIEW COMMENTS FOR PLAN CHECK # BLD20171040 NEW SINGLE FAMILY RESIDENCE AT 9116 MAIN STREET Dear Mr. Delap, I have reviewed the above building permit application for the Planning Division. Before I can continue with my review, please address the following comments in a cover letter and through the submittal of updated plans and reports, as necessary: 1. Structural lot coverage: Structural lot coverage is calculated against net lot area so the coverage on the Site Plan will need to be recalculated after subtracting out the area of the access easement. This will lead to a maximum structural lot coverage allowed for the site of 2,597 sq. ft. (8,993 gross —1,571 easement = 7,422 net x 0.35 = 2,597). 2. Setbacks: The setbacks shown on the Site Plan are incorrect. A 25' setback is required from the street property line, 7.5' setbacks from the side property lines, and a 15' setback from the rear property line (south) in accordance with the development standards of the RS-8 zone. Because there is an access easement across the parcel, a setback must also be taken from that. In this case, that would a 7.5' side setback. By definition, a'setback' is "the minimum distance that buildings/structures or uses must be set back from a lot line...." 'Lot line' means "any line enclosing the lot area". 'Lot area' means "the total horizontal area within the boundary lines of a lot. Lot area shall normally exclude any street rights -of -way and access easements." Since the lot area here excludes the access easement, a setback from the easement is required. 3. Height calculations: Since repositioning the house to comply with setbacks will alter the height corner locations, please verify the new corner elevations and make any necessary changes to the height calcs on the Site Plan and Elevation sheets. Make all submittals to a Permit Coordinator, Monday through Friday, 8:00 am to 4:30 pm (8:30 am to 12:00 pm on Wednesdays only). If you have any questions, please contact me at (425) 771-0220. Sincerely, Mike Clugston, AICP Associate Planner