Loading...
1801BFUM.3_ROW_EDM_0188__ROW Application.pdf— of EVAIt-), ROW PERMIT NO.: ENG ISSUE DATE: RIGHT-OF-WAY CONSTRUCTION /kc. I SCJO PERM IT APPLICATION PROJECT NAME : 7500 196TH ST SW (SEATTLE HEIGHTS) CONTACT: ARNALDO BLANCO EDMONDS UG PHASE I CONTRACTOR: MASTEC NORTH AMERICA, INC. Phone #: (787) 349-2960 Mailing Address: 151 STEWART ST SW, BLDG A, PACIFIC, WA, 98047 State License MASTENA991KJ City Business License #: Fax #: Email #: ABLANCO@FG-INC.NET Z Liability Insurance 1X1 Bonded ADDRESS OR INTERSECTION OF CONSTRUCTION: RIGHT-01-WAYS OF (109-111) MAIN ST, (110-232) 2ND AVE N (ALLEY), (107-303) FDMONDS ST & (301-652) 3RD AVE N. I ROW WORK ASSOCIATED WITH THE FOLLOWING TYPE OF PROJECT: F1 Commercial El Subdivision 0 City Project 0 Traffic Control (Only) F-1 Multi -Family D Single Family r_1 Other FX] EUC (PUD, VERIZON, PSE, COMCAST, OVWSD): FRANCHISED UTILITY -MCI METRO ACCESS TRANSMISSION SERVICES, LLC Is this permit part of a blanket permit? F1 Yes FX1 N o � ANY ASSOCIATED PERMITS? 1 4 ENG# I DESCRIPTION OF PROPOSED WORK (Be Specific): INSTALLATION OF 3254 LF 01: 2" HDPE CONDUIT, (8) VAULTS AND PULLING OF FIBER CABLE IN THE RIGHT-OF-WAYS OF MAIN ST. 2ND AVE N (ALLEY), EDMONDS ST & 3RD AVE N. INSTALLATION VIA DIRECTIONAL BORING IN THE RIGH-f,-OF-WAY, TRENCHING ON ONE SIDEWALK PANEL AND MISSILE BORING ACROSS THE ROAD. WAS STREET OVERLAYED WITHIN THE LAST FIVE (5) YEARS? YESE] NO El Ye PAVEMENT CUT: Z Yes El No If yes, indicate size of cut: 5' x 5' (0 BOREPITS) CONCRETE CUT: 0 Yes No If yes, indicate size of cut: 5' X 5' (x8 BOREPITS) RIGHT-OF-WAY AREA CLOSURE TOTAL DURATION (NUMBER OF MONTHS) Sidewalk 48 Hrs + LF Alley 72 Hrs + LF Parking 72 Hrs + LF X LF aA SF I X LF SF X LF SF APPLICANT TO READ AND SIGN *Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by (WAC) 2967155-305 and must have certification verifying completion of the required training in their possession. *Restoration is to be in accordance with City codes and Standards. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday — NO EXCEPTIONS. Indemnity: The Applicant has signed an application which states helshe hold the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including defense costs and attorney fees by reason of granting this permit. I have read the above statements and understand the permit requirements and acknowledge that I must follow all requirements in order 11i th �permit to be valid. SIGNATURE DATE 08/24/2018 Contractor or Agent NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE