Loading...
1801BFUM.3_ROW_EDM_0190__ROW Application.pdf-1 0� ECIA4(1. "VC, isgo ROW PERMIT NO.: ENG ISSUE DATE: RIGHT-OF-WAY CONSTRUCTION PERMIT APPLICATION PROJECT NAME: 7500 196TH ST SW (SEATTLE FIEIGFITS) EDMONDS UG PHASE III CONTRACTOR: MASTEC NORTH AMERICA, INC. Mailing Address: I I S'I LW A R] S I S W, B LDG A, PACIFIC, WA, 98047 State License #: MASTENA991 KJ City Business License #: CONTACT: ARNALDO BLANCO Phone#: (787) 349-2960 Fax #: (770) 368-1944 Email #: ABLANCO@FG-INC.NET Z Liability Insurance 1X1 Bonded ADDRESS OR INTERSECTION OF CONSTRUCTION: RIGTIT-OF-WAY OF PUGET DR FROM 835 TO INTERSECTION WITH 88TH AVE W ROW WORK ASSOCIATED WITH THE FOLLOWING TYPE OF PROJECT F-1 Commercial 0 Subdivision [:1 City Project F-1 Traffic Control (Only) F� Multi -Family El Single Family F-1 Other FXI EUC (PUD, VERIZON, PSE, CONICAST, OVWSD): FRANCHISED UTILITY -MCI METRO ACCESS TRANSMISSION SERVICES, LLC Is this permit part of a blanket permit? F� Yes Fx_1 No ANY ASSOCIATED PERMITS? BLD# ENG# DESCRIPTION OF PROPOSED WORK (Be Specific): INSTALI,ATION OF 4058 LF OF 2" HDPE CONDUIT, (7) VAULTS. (2) N4ANHOLES IN THE ROAD AND PULLING FIBER CABLE IN THE RIGHT-OF-WAY OF PUGET DR, INSTALLATION VIA (3622 LF) OF DIRECTIONAL BORING IN THE RIGHT OF WAY, (124 LF) OF MISSILE BORING INTO THE STREET AND (312 LF) OF TRENCHING IN SOFT SOIL, WAS STREET OVERLAYED WITHIN THE LAST FIVE (5) YEARS? YESE] NO 0 Year: PAVEMENT CUT: ED Yes 0 No If yes, indicate size of cut: 5' X 5' (x 14 BOREPITS) CONCRETE CUT: Z Yes El No If yes, indicate size of cut: 5' x _5' (x2 BOREPITS) RIGHT-OF-WAY CLOSURE AREA I TOTAL DURATION (NUMBER OF MONTHS) Sidewalk 48 Hrs + Alley 72 Hrs + LF X LFJ LF SF1 LF JX SF Parking 72 Hirs + LF X LF SF APPLICANT TO READ AND SIGN *Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the required training in their possession. *Restoration is to be in accordance with City codes and Standards. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday — NO EXCEPTIONS. Indemnity. The Applicant has signed an application which states helshe hold the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including defense costs and afforney fees by reason of granting this permit. I have read the above statements and understand the permit requirements and acknowledge that I must follow all requireiiiciiis 11i ordc,�i'or the perilill to be valid. SIGNATURE DATE Contractor or Agent NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE 09/06/2018