Loading...
1808_001.pdfSPECIAL INSPECTION AND TESTING AGREEMENT Permit #: , . BLJ.?01?:07P2 , Project: -,, Colvin, 1.0724 228tr StreetSIV Ptìot lo iss4o.nce of a pennit, thß form must be compleled ín ìts entírety and r.etutned fo the Cífi for approval. The completedform must høve sìgnatures of acknowledgment by all pørtles. DUTIES AND RESPONSIBILÍT*' Sneciàl Insneption Ffrm a+d Soecial l4snectors: The Special Inspeotion firm of inspection for the following types of wor\ (separate employed): _ Reinforçed Concrete - Bolting in Concrete _ Prestressed Concrete _ Shotcrete . . Structural Masonry - Struotural Steel/Erection - High Strength Bôlting ¿)will perform specitrl must be submitted if more than one firm is to be ,, Spray applied Fireproofing - Smoke Control Systems . Lateral Wood Structurat Observation by design professional X Grading/soils/Pile Installations .Other All individual inspectors to o'e employed on this project will be tilfABO certified for the type of .work they are to inspect. If inspeciion is for w.ork ltrat is not oovered by thl WnfO.catgeoriesn or the inspector is not WABO ó"ri¡fipd, a detailed resume of the inspector and firm must be submitted. The resume must show that the inspector and the firm are qualified by educaiion and experience to perform the work and testing required by the project design and specificalions. The work shall be inspeoted for conformance with the plans and specifications approved by the City' Rwisions and addenda sheeti will not be used for inspectior¡ unless fhey have been approved by the City, Inspection records shall include: A daily record to be maintained on site, itemizing the inspections performed. Any nonoonforming work shall be brought tp the immediate attention ofthe contractor for resolutìon. A weeffiy report shall be submitted to the City; detaiiingthe inspections and testing performed, listing any nonconformingwork and resolution of nonconforming items. A final report shall be submitted to the building departmenl prior to the Certificate of Occupancy þeing issued. This reportwill indicatê that inspection and testingwas completed in conformance with the approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be detailed in the final report. a a L:\BIJILDING DIVISION FILES\special Inspections\speoial Inspection Rcports\Sl 2019-0792 Sojls, Pile installatíons Colvin.dos?/l2f¿019 Contractor: The contraçtor shall provide the speoial inspegtol or agency adequate notification ofwork requiring inspection. The City appfoved plan and specificaiions must be made available, at the jobsite for the use of the special inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by all parties. The speiial inspection functions arE considered to be in addition to the normal inspections performed by the City and the contractor is resþonsible for contaoting thE City to schedule fegrrlar inspections. No concrete shall be poured or other work covered until approval is giveh by the City inspector. Buildins l)eoartment: The building department shall review any revisions and addenda. The City inspeotor will monitor the special inspection functìons for compliance with the agreement and the approved plans. The Ciry inspector shalt be ' responsible for approvir¡gvarious stages ofconstructionto be covgred and for workto proceed. Desisn Profcssion¡ls: ffiit""tanøorengi¡eerwillclearlyindicateontheplansandspecifìcationsthespecifictypesofspecia1 inspegtion r.equired and shall include a schedule for inspection andtesting. The architect and/or engineer will coırdinate théir revislon and addenda process in such a \4,ay as to ensure that all required City approvals are obtaine{ prior to work shown on the revisions being performed in the field. Owne(î ffrr pro.¡ect owner, or the architect or engineer acting as the owners agent, shall employ the speciat inspector or agency. A failure of the special inspector or firm r" o"oTHflT:JoH*tlln *. requirements of the IBC, the approved plans and this documeqt, may void this agrgement and the Building Officialls apptoval of the special inspector in such a casg a new special inspector and/grf¡rm would need to be proposed for approval. A failure ofthe design and/or consüu¿tidn parties to perform in accordance with this agreement may result in a STOP WORK notice being posted on the proj,ect until nonconforming items havc been resolved. ACKNOIVLEDGMENTS I have read and agr€e to comply with the terms and conditi ent. ,r. owner: 8{¿ve^ T.C^\v,.-.' s Contractor: ignature Date'tlzrsltq...æ Date: 3-4 Åe Dúe. 07/24119Stark Foundations, Daniel Stark Special Insp, Sp-ecial Insp. ACCEPTED THB CITY OF EDMONDS BUILDINC DIVISION f Date: By Date:tlæþo L:\BUILDING DlVlStO¡¡ ptleS\Specíal Inspectiorrs\Special Inspection Reports\Sl 2019.0792 Soils, Pile installations Colvin.doc7ll2l20l9