Loading...
184th St S.P.compaction.pdfSky Valley Testing, LLC P.O. Box 835 Monroe, WA 98272 Date: Job #: 04116/18 1814 Day of Week: Time On Site: Monday 3.0 Job Name & Location: 184th St S.P. Weather: Drive Time: Cloudy 1.0 Mileage: Total Hours: 8710 184th St SW, Edmonds WA 4.0 Observation Category Contractor: Forman: The Gordon Company Scott Test Point Number Test Location Fill Depth (ft.) Elevation Feet Moisture Content Dry Density (Pcf) Max. Dry Density (pcf) Compaction Percentage 1 Side Sewer S.G. 5.3 123 126.8 97% 2 Side Sewer S.G. 5.0 122 126.8 96% 3 Side Sewer S.G. 5.8 124 126.8 98% 4 S. Side 184th St SW S.G. 5.0 123 126.8 97% 5 Storm S.G. 6.0 124 126.8 98% 6 S. Side 184th St SW S.G. 5.1 123 126.8 97% 7 Storm S.G. 5.2 122 126.8 96% 8 S. Side 184th St SW S.G. 6.4 124 126.8 98% NOTES: Checked compaction in short plat under construction. Access road to plat is on south side of 184th St SW. Checked compaction on side sewer which runs up middle of road. Also checked road sub grade and storm in from of site south side of street. These areas were filled with imported crushed rock. Geotech in Field: Jerry Boyd Skv Vallev Testinq, LLC Soil Consultants/ Geotechs/ Compaction Testinq (206) 949-4938 Moisture Density Relationship Curve / 171 4- Job:— Date: Job Curve #-. Test By: Description Material: e4j,�oa-s At�� �-r'k- i,� A5TM-1)-1,55-7 'Weight Soil-Wet-Tare;=m9mm M MMMMM Weight Soil -Dry -Tare Weightof Moisture Moisture-% Dry Weight mmmmmmmm= 'Average Moisture Dry Density LB/CU Maximum Density 0 U- M Uj n z U) z LLI n r) 70 MOISTURE CONTENT - PERCENT OF DRY WEIGHT 0' 184T -ST.,SW -. �—gw 101+00 '40 4 9 c l-3 :11 .76 lg'(E OF T ol.45'(E SE — — — — — — — REBA & CAP -329- CATCH BASN INLET( Ar —328- 7.5— ROT CTION UYP) 'I- �2- ,-N CE 37, CL RING" LIMITS p 51 HOUS 18610. STOCKPILE WITH pLASTIC COVERING 004346000010'' F- < F- "cr. 0. 1 ' Y - - - - - - - - - - - - - LINE AT 'o PROTECT TREE ACCO! TO THE PERFORMAN( STANDARDS FOUND I ECDC 15.45.05O.H. �,j 9k SILT FENCE 2 TYP 004340 10. 0 1000(,)