184th St S.P.compaction.pdfSky Valley Testing, LLC
P.O. Box 835
Monroe, WA 98272
Date: Job #:
04116/18 1814
Day of Week: Time On Site:
Monday 3.0
Job Name & Location:
184th St S.P.
Weather: Drive Time:
Cloudy
1.0
Mileage:
Total Hours:
8710 184th St SW, Edmonds WA
4.0
Observation Category Contractor:
Forman:
The Gordon Company
Scott
Test Point
Number
Test Location
Fill
Depth (ft.)
Elevation
Feet
Moisture
Content
Dry Density
(Pcf)
Max. Dry
Density (pcf)
Compaction
Percentage
1
Side Sewer
S.G.
5.3
123
126.8
97%
2
Side Sewer
S.G.
5.0
122
126.8
96%
3
Side Sewer
S.G.
5.8
124
126.8
98%
4
S. Side 184th St SW
S.G.
5.0
123
126.8
97%
5
Storm
S.G.
6.0
124
126.8
98%
6
S. Side 184th St SW
S.G.
5.1
123
126.8
97%
7
Storm
S.G.
5.2
122
126.8
96%
8
S. Side 184th St SW
S.G.
6.4
124
126.8
98%
NOTES:
Checked compaction in short plat under construction. Access road to plat is on south
side of 184th St SW. Checked compaction on side sewer which runs up middle of road.
Also checked road sub grade and storm in from of site south side of street. These areas
were filled with imported crushed rock.
Geotech in Field:
Jerry Boyd
Skv Vallev Testinq, LLC Soil Consultants/ Geotechs/ Compaction Testinq (206) 949-4938
Moisture Density Relationship Curve
/ 171 4-
Job:— Date:
Job Curve #-. Test By:
Description Material: e4j,�oa-s At�� �-r'k- i,�
A5TM-1)-1,55-7
'Weight Soil-Wet-Tare;=m9mm
M
MMMMM
Weight Soil -Dry -Tare
Weightof Moisture
Moisture-% Dry Weight
mmmmmmmm=
'Average Moisture
Dry Density LB/CU
Maximum Density
0
U-
M
Uj
n
z
U)
z
LLI
n
r)
70
MOISTURE CONTENT - PERCENT OF DRY WEIGHT
0'
184T -ST.,SW -. �—gw
101+00 '40 4
9
c l-3
:11 .76
lg'(E OF T
ol.45'(E SE
— — — — — — —
REBA & CAP
-329- CATCH BASN INLET( Ar
—328- 7.5— ROT CTION UYP) 'I- �2-
,-N CE
37,
CL RING"
LIMITS p
51
HOUS
18610.
STOCKPILE WITH
pLASTIC COVERING
004346000010''
F-
<
F-
"cr. 0. 1 ' Y - - - - - - - - - - - - -
LINE AT
'o PROTECT TREE ACCO!
TO THE PERFORMAN(
STANDARDS FOUND I
ECDC 15.45.05O.H.
�,j
9k
SILT FENCE 2
TYP
004340 10. 0
1000(,)