1860_001.pdfCONTRACTOR'S MATERIAL TEST CERTIFICATEABOVEGROUND PIPING VIKING AUTOMATIC SPRINKLER 3434 FIRST AVENUE SOUTH SEATTLE, WA 98134 PROCEDURE Upon completion of work. Inspection and tests shall be made by the contractor's representative and witnessed by an owner's representative. All deferAs shall be corrected and system left in service before contractors personnel finally leave the job A certificate shall be filled out by and signed by both representatIves Copies shall be prepared for approving authorities, owners and contractor. It is understood the ownes representative's signature in no way prejudices any claim contractor for faulty material, poor workmanship, or failure to comply with approving authority's requirements or local ordinances. EDMOND RECOVERY CENTER 7416 212TH ST SW, EDMONDS, WA 98026 PLANS ACCEPTED BY APPROVING AUTHORITIES (NAMES) CITY OF EDMONDS ADMESS 121 STH AVE N. EDMONDS, WA 98020 INSTALLATION CONFORMS TO ACCEPTED PLANS EQUIPMENT USED IS APPROVED IF NO EXPLAIN DEVICES no YES F-INO EYES F-1 NO INSTRUCTIONS HAS PERSON IN CHARGE OF FIRE EQUIPMENT BEEN INSTRUCTED AS TO LOCATION OF CONTROL VALVES AND CARE AND MAINTENANCE OF THIS NEW EQUIPMENT? IF NO, EXPLAIN EYES 7 NO LOCATION OF SYSTEM ENTIRE BUILDING SPRINKLERS MAKE MODEL YEAR OF MANUFACTURER ORIFICE SIZE QUANTITY TEMPERATURE RATING VIKING QR SSP 2018 112" 160 155'F VIKING OR HSW 2019 1/2" 1 286*F VIKING QR DRY SSP 2018 11. 2 155*F TYCO DS-1 HSW 2018 11. 27 155'F VIKING QR SSU 2018 112" 1 286*F PIPE AND FITTINGS Type of Pipe SCH-10, SCHAO BLACK STEEL PIPE Type of Fittings DUCTILE IRON 300#. BLACK CAST IRON 125# ALARM VALVE OR FLOW INDICATOR ALARM DEVICE MAXIMUM TIME TO OPERATE THROUGH TEST CONNECTION TYPE MAKE -MOCEL MIN SEC, FLOW SWITCH POTTER VSR-F DRY PIPE OPERATING TEST NOT APPL DRYVALVE MAKE MODEL SERIAL NO MAKE MODEL SERIAL NO TIME TO TRIP THRU TEST CONNECTION WATER PRE85URE AIR PRESSURE TRIP POINT AIR PRESSURE TIME WATER REACHED TEST OUTLET ALARM OPERATED PROPERLY WITHOUT Q O.D, MIN SEC PSI PSI PSI MIN. SEC YES NO WITH QOD IF NO, EXPLAIN 'MEASURED FROM TIME INSPECTOR'S TEST CONNECTION 19 OPENED OPERATION 12 PNEUMATIC 10 ELECTRIC 171 HYDRAULIC PIPING SUPERVISED 0 YES 0 NO DETECTING MEDIA SUPERVISED YES [:]NO DELUGE & DOES VALVE OPERATE FROM THE MANUAL TRIP ANDIOR REMOTE CONTROL STATUS YES [::]NO PREACTION IS THERE AN ACCESSIBLE FACILITY IN EACH CIRCUIT FOR TESTING JFNO,EXPLAIN VALVES 0 YES LI NO I DOES EACH CIRCUIT OPERATE DOES EACH CIRCUIT MAXIMUM TIME TO NOT APPLY MAKE MODEL SUPERVISION LOSS ALARM OPERATE VALVE RELEASE OPERATE RELEASE HYDROSTATIC: Hydrostatic test shall be at not less than 200 psi (13 6 bars) for two hours or 50 psi (3.4 bars) above static pressure in excess of 150 psi (10.2 bars) for hvo hours. Different dry -pipe valve clappers shall be left open during test to prevent damage All aboveground piping TEST leakage shall be stopped DESCRIPTION PNEUMATIC Establish 40 psi (2 7 bars) air pressure and measure drop which shall not exceed 1-1/2 psi (0.1 bare) In 24 hours Test pressure tanks at normal water level and air pressure drop which shall not exceed 1-112 psi (0.1 bars) in 24 hours. ALL PIPING HYDROSTATICALLY TEST AT 200 PSI FOR2HRS. IF NO, STATE REASON DRY PIPING PNEUMATICALLY TESTED 13 YES 0 NO EQUIPMENT OPERATES PROPERLY Im YES 13 NO 30 YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT ADDITIVES AND CORROSIVE CHEMICALS, SODIUM SILICATE OR TESTS DERIVATIVES OF SODIUM SILICATE. BRINE OR OTHER CORROSIVE CHEMICALS WERE NOT USED FOR TESTING SYSTEMS OR STOPPING LEAKS? EM YES Cl NO DRAIN READING OF GAGE LOCATED NEAR WATER TRESIDUAL ISUPPLY PRESSURE WITH VALVE IN TEST TEST TEST CONNECTION 23 CO CONNECTION OPEN NDE :5s ERGROUND MAINS AND LEAD IN CONNECTIONS TO SYSTEM RISERS FLUSHED BEFORE CONNECTION MADE TO SPRINKLER PIPING VERIFIED BY COPY OF THE U FORM NO 656 1@ YES 12 NO OTHER EXPLAIN FLUSHED BY INSTALLER OF UNDERGROUND SPRINKLER PIPING IZ YES LJ NO BLANK TESTING NUMBER USED I LOCATIONS NUMBER REMOVED GASKETS None WELDEDPIPING 0 YES 0 NO IF YES_ 00 YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING PROCEDURES COMP�y NTH THE REQUIREMENTS OF AT LEAST AWS D10.9, LEVEL AR-3 SYES F—INO WELDING DO YOU CERTIFY THAT THE WELDING WAS PERFORMED BY WELDERS QUALIFIED IN DYES ONO COMPLIANCE WITH THE REQUIREMENTS OF AT LEAST AWS D10.9, LEVEL AR-3 DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A DOCUMENTED QUALITY CONTROL PROCEDURE TO INSURE THAT ALL DISCS ARE RETRIEVED. THAT OPENING.S IN PIPING ARE SMOOTH. THAT SLAG AND OTHER WELDING RESIDUE ARE REMOVED. AND THAT THE INTERNAL DIAMETERS OF PIPING ARE NOT PENETRATED MYES El No CUTOUTS DO YOU CERTIFY THAT YOU HAVE A CONTROL FEATURE TO ENSURE THAT ALL CUTOUTS (DISCS) (DISCS) ARE RETRIEVEDI MYES El N�O HYDRAULIC NAME PLATE PROVIDED _�XPLAIN DATA ]IF NAMEPLATE 0 YES 0 NO DATE LEFT IN SERVICE WITH ALL CONTROL VALVES OPEN: REMARKS 15�hl h�q 4 __4 NAME OF SPRINKLER CONTRACTOR Viking Automatic SprFinkler Co. Lic.# VIKINAS373 Nr 3434 FIRST AVENUE S. SFEATTLE, WA TEST WITNESSED BY SIGNATURES FOR PROPERTY OWN I AGENT (SIGNED) TITLE DATE FOR SP I L T R (SIGNED) TITLE & DATE JFQ�R ATHORIKTY25L, TION (SIGNED) T'O TITLE DATE CERTIFICATION This is to certify that this automatic sprinkler sygtern has been installed in accordance with the standards adopted by the Washington State Frie Marshal and N.F.P.A. Standard 13. Name of Firm: Viking Automatic Sprinkler Co. Mailing Address: 3434 FIRST AVE. S. SEATTLE, WA Name: LUCIA FUNG Title DESIGNER Date: WHEN ALL APPLICABLE ITEMS THROUGH 15 HAVE BEEN COMPLETED THIS ORIGINAL FORM SHALL BE RETURNED TO TO THE STATE FIRE MARSHAL'S OFF 16 CONFIRMATION OF SPRINKLER SYSTEM INSTALLATION Name: Title: Date: Acceptable: E]YES ONO 17 COMMENTS. - ADDITIONAL EXPLANATION AND NOTES