186578344-1122 Viewland Way.pdfROW PERMIT NO. : ENG___________
ISSUE DATE: ________________
RIGHT-OF-WAY CONSTRUCTION
PERMIT APPLICATION
PROJECT NAME: CONTACT:
CONTRACTOR: Phone #:
Mailing Address: Fax #:
State License #: Email #:
City Business License #: Liability Insurance Bonded
ADDRESS OR INTERSECTION OF CONSTRUCTION:
ROW WORK ASSOCIATED WITH THE FOLLOWING TYPE OF PROJECT:
Commercial Subdivision City Project Traffic Control (Only)
Multi-Family Single Family Other
EUC (PUD, VERIZON, PSE,
COMCAST, OVWSD):
Is this permit part of a blanket permit? Yes No
ANY ASSOCIATED PERMITS? BLD#____________ ENG#____________
DESCRIPTION OF PROPOSED WORK (Be Specific) :
_________________________________________________________________________
WAS STREET OVERLAYED WITHIN THE LAST FIVE (5) YEARS? YES NO Year:
PAVEMENT CUT: Yes No If yes, indicate size of cut: _________x_________
CONCRETE CUT: Yes No If yes, indicate size of cut: _________x_________
RIGHT-OF-WAY
CLOSURE AREA TOTAL DURATION
(NUMBER OF MONTHS)
Sidewalk 48 Hrs + LF X LF SF
Alley 72 Hrs + LF X LF SF
Parking 72 Hrs + LF X LF SF
APPLICANT TO READ AND SIGN
*Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification
verifying completion of the required training in their possession.
*Restoration is to be in accordance with City codes and Standards. All street-cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday – NO EXCEPTIONS.
Indemnity: The Applicant has signed an application which states he/she hold the City of
Edmonds harmless from injuries, damages or claims of any kind or description
whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or
any of its departments or employees, including defense costs and attorney fees by reason
of granting this permit.
I have read the above statements and understand the permit requirements and acknowledge that I must
follow all requirements in order for the permit to be valid.
SIGNATURE DATE
Contractor or Agent
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
EDMONDS
/ VIEWLAND WAY
IFS CREW REPLACED 12FT OF 2" PE TO REPAIR BROKEN MAIN
SHORELINE CONSTRUCTION IS RESPONSIBLE FOR PERMANENT RESTORATION
1111
1111
10
1019
19
VIEWLAND WAY
O
L
Y
M
P
I
C
A
V
E
STOP
FLAGGER
STOP
FLAGGER
STOP
FLAGGER
CROSSWALK
CLOSED R9
-
3
CROSSWALK
CLOSED R9
-
3
ON
E
L
A
N
E
RO
A
D
AH
E
A
D
W20-4
X'X'X'
RO
A
D
WO
R
K
AH
E
A
D
W20-1 W20-7A
ONE LANE
ROAD
AHEAD W2
0
-
4
X'
X'
X'
ROAD
WORK
AHEAD W2
0
-
1
W2
0
-
7
A
ONE LANE
ROAD
AHEADW2
0
-
4
X'
X'
X'
ROAD
WORK
AHEADW2
0
-
1
W2
0
-
7
A
ON
E
L
A
N
E
RO
A
D
AH
E
A
D
W20-4
X'X'X'
RO
A
D
WO
R
K
AH
E
A
D
W20-1W20-7A
STOP
FLAGGER
M6-2
M6
-
2
RESIDENT(S) WILL BE INFORMED
OF POSSIBLE TEMPORARY
DRIVEWAY CLOSURE
USE MAXIMUM AVAILABLE
SPACE FOR SIGNS
1100
N PSE PUGET
SOUND
ENERGY
JOB#186578344
1100 Viewland Way, Edmonds, WA
May 31, 2018
brent.pogson@pse.com
(425) 398-6158
Sheet 1 of 1
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 008997
Card Exp. 08/13/2019
gregory.harwood@pse.com
(425)424-6425
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
MINIMUM TAPER LENGTH = L (feet)
LANE
WIDTHS
POSTED SPEED LIMITS
20 25 30 35 40 45
10
11
12
55 +
60/65
45/55
35/40
30
25
SIGN SPACING
"X"
800
500'
350'
200'
100'
Notes:
1. All signs and spacing to conform to the MUTCD
and City of Edmonds standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and shall
not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m
8. Work area will be 8' SCL of Viewland Way & 32'
ECL of Olympic Ave.
9. If used, place NO-PARK signs 72 hours in
advance of the day that the work is to be done.
BORE PIT
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
ROW ROW
1230
1214
1135
1225
1206
1114 1116
1122
1218
1224
1126
1217
1132
1118
1123
1115
11251020
1225
VIEWLAND WAY
OLYMPIC
AVE
29'S
19'N
33'E
28'E CL PAV
19'E
2" PE IP 2'S-S EDGE PAV 853167
2" MPE IP 19'E
9518125
2" PE IP 18'E CL PAV
853167
1 1/4" MPE IP 7'N 9601174 1 1/4" MPE IP 5'N 9601174
2" PE IP 13'E
902206
2" MPE IP 20'-25'N
186528658-2004
2" PE IP 1'N-N PAV 853167
1 1/4" PE IP 4'S-N PL 883358
249'N
246'N
325'E315'E
28
0
'
W
16
7
'
W
206'N
461'N
309'N
166'N
33'W
49'W
137'E
154'W
23
3
'
E
13
0
'
E
28'S
314'S
15'E
1 1/8" MPE2016-E
5/8" PE1990
5/8" MPE2000
5/8" PE1985
5/8" PE1988
5/8" MPE1999
1 1/8" MPEI2011-E
5/8" PE1993
5/8" PE1992
5/8" PE1988
5/8" M1996
5/8" PE1989
5/8" PE1989
5/8" MPE1996
5/8" MPE1996
1996
5/8"
5/8" PE1994
1 1/8" MPE2009
5/8"
360'N
169'E
17'E
358'E
No electric grid information availableS160062, Q162067
The information on the attached maps is subject to change without notice. Puget Sound Energy makes no warranty, expressed or implied, concerningthe suitability of this information for any purpose. Recipient agrees to not disclose this confidential information to any other person or entity,unless authorized in writing by Puget Sound Energy. This map is not to be used for determining the actual location of any PSE facilities (call 811).“
05-07-2018
Scale 1:800
Lat\Long=47.8197, -122.3615