Loading...
1956_001.pdfo!c Forensic Architecture & Engineering I Building Enclosure Consulting 2200 1"'Avenue South, Suite 200, Seattle, WA 98134 206.285.4300 : main 206.285.4371 fax www.oacsvcs.com August 6,2019 To: City of Edmonds RE: Response to Plan Review Comments #L for Plan Check # 2Ot9-0672. ADA Ramp Repair/Replacement ln response to City of Edmonds review comments, dated 6/13/2019, OAC Services respectfully submit the following documentation. L. Geotech report comments from ZipperGeo 2. Critical Areas Notice of Decision for project under a separate building permit (BLD 20181202). 3. ROW Permit Application from applicable subcontractors Regards, &J Jeff Dideon Sr. Builtling Enclosure Specialist Þ clw or Eprvlottlos . 121 5th Avrruu¡ NoRrH . EDMoNDS, wA 98020 PHorrlE: 425.771.0220 r F¡x: 425.77!.A221 . Wea: W!ilw.edmondsw?.gov DEVELoPMENT Srnvtcrs DEpnRlvEt¡t: PlArultlllrtc r BUILDING June 13, 2019 Jeff Dideon jdideon@oacsvcs.com RE: PLAN REVIEW COMMENTS #1 FOR PLAN CHECK # 2OL9-0672 ADA RAMP REPLACEMENT AT L2L.T25 SUNSET AVE. N Dear Mr. Dideon, lhave reviewed the referenced building permit application on behalf of the Planning Division. Before I can continue with my review, the following information needs to be clarified in a written response and through submittal of reports and updated plans with changes called out: {"""t"* r"rt": Update the geotech report in accordance with ECDC 23.80.050 to describe the proposed project relative to the seismic hazard by addressing the standards in ECDC 23.80.060. .4.. Critical area otice to tit le: Per ECDC 23.4O.27O.8, sites with field-verified presence of ,jl^¡ critical areas and/or critical area buffers for which a permit application is submitted( must as a condition of permit issuance, record a notice of the existence of the critical area and/or critical area buffer against the property with the Snohomish County Auditor's Office. Attached is a Notice of Presence of Critical Areas. Please sign and notarize this document. Prior to issuance of the building permit, this form must be recorded with the Snohomish County Auditor's Office. Options for recording include: a. Take the covenant to the County and record it for the County's recording fee* of $gg for one page plus $1" for each additional Pâ8ê, and return a copy of the recorded notice to the Edmonds Planning Division with the Auditor's recording sticker on the copy; OR b. provide the City processing fee of $tOO plus the County recording fee* of $103 (S9g for first page and $1 for each additional page), for a total of $203, and the City will record the notice for you. r County recording fees will be increasing a few dollars on July L and then again on July 28. Refer to the Snohomish County Auditor's fee schedule: https :/lsnohgmi shcou ntvwa.eovl1972lDocu ment-Recordins. Codes, handouts, onlíne permits, and the City's GIS are available here: htto ://www.ed mondswa.gov/ha ndouts. htm I t