1956_001.pdfo!c Forensic Architecture & Engineering I Building Enclosure Consulting
2200 1"'Avenue South, Suite 200, Seattle, WA 98134
206.285.4300 : main 206.285.4371 fax
www.oacsvcs.com
August 6,2019
To: City of Edmonds
RE: Response to Plan Review Comments #L for Plan Check # 2Ot9-0672. ADA Ramp Repair/Replacement
ln response to City of Edmonds review comments, dated 6/13/2019, OAC Services respectfully submit
the following documentation.
L. Geotech report comments from ZipperGeo
2. Critical Areas Notice of Decision for project under a separate building permit (BLD 20181202).
3. ROW Permit Application from applicable subcontractors
Regards,
&J
Jeff Dideon
Sr. Builtling Enclosure Specialist
Þ
clw or Eprvlottlos . 121 5th Avrruu¡ NoRrH . EDMoNDS, wA 98020
PHorrlE: 425.771.0220 r F¡x: 425.77!.A221 . Wea: W!ilw.edmondsw?.gov
DEVELoPMENT Srnvtcrs DEpnRlvEt¡t: PlArultlllrtc r BUILDING
June 13, 2019
Jeff Dideon
jdideon@oacsvcs.com
RE: PLAN REVIEW COMMENTS #1 FOR PLAN CHECK # 2OL9-0672
ADA RAMP REPLACEMENT AT L2L.T25 SUNSET AVE. N
Dear Mr. Dideon,
lhave reviewed the referenced building permit application on behalf of the Planning Division.
Before I can continue with my review, the following information needs to be clarified in a
written response and through submittal of reports and updated plans with changes called out:
{"""t"* r"rt": Update the geotech report in accordance with ECDC 23.80.050 to
describe the proposed project relative to the seismic hazard by addressing the
standards in ECDC 23.80.060.
.4.. Critical area otice to tit le: Per ECDC 23.4O.27O.8, sites with field-verified presence of
,jl^¡ critical areas and/or critical area buffers for which a permit application is submitted( must as a condition of permit issuance, record a notice of the existence of the critical
area and/or critical area buffer against the property with the Snohomish County
Auditor's Office. Attached is a Notice of Presence of Critical Areas. Please sign and
notarize this document. Prior to issuance of the building permit, this form must be
recorded with the Snohomish County Auditor's Office. Options for recording include:
a. Take the covenant to the County and record it for the County's recording fee* of
$gg for one page plus $1" for each additional Pâ8ê, and return a copy of the
recorded notice to the Edmonds Planning Division with the Auditor's recording
sticker on the copy;
OR
b. provide the City processing fee of $tOO plus the County recording fee* of $103
(S9g for first page and $1 for each additional page), for a total of $203, and the
City will record the notice for you.
r County recording fees will be increasing a few dollars on July L and then again on July
28. Refer to the Snohomish County Auditor's fee schedule:
https :/lsnohgmi shcou ntvwa.eovl1972lDocu ment-Recordins.
Codes, handouts, onlíne permits, and the City's GIS are available here:
htto ://www.ed mondswa.gov/ha ndouts. htm I
t