Loading...
1-Design Review Cover Letter.pdfC'e. 2CC6 J DEVELOPMENT SE NIURS HOUSING 0 FlIVERED August 26, 2014 Re: Cover Letter for Design Review Application Property Location: 7208 & 7220 2 101h St SW, Edmonds, WA City of Edmonds, This letter is to serve as the cover letter for our Design Review submittal and describe how the proposal satisfies the applicable requirements and standards of the Comprehensive Plan and Edmonds Community Development Code. Our company has developed multiple Seniors Housing projects in 7 states across the central and western United States, in response to the overwhelming amount of seniors being diagnosed with Alzheimer's disease and other forms of Dementia. Our company has concentrated on developing a building with a "community" feel for those suffering from Alzheimer's disease and other forms of Dementia; a homelike feel and not a sterile, hospital like environment. In researching the Edmonds market, we have found that there is a large unmet need for the elderly suffering from forms of Dementia. In Edmonds, in order to serve the need in the community in an urban setting with limited land opportunities, we propose to develop a three story building, with the first level being parking, offices, laundry and kitchen facilities, and the additional 2 floors being comprised of resident rooms. Page 12 of the City of Edmonds Comprehensive Plan confirms that "The city has a higher percentage of retired persons and senior citizens than its neighboring cities and Snohomish County as a whole", which aligns with our research as well. Our Memory Care use is a high need, low impact use for the City of Edmonds. As the residents of our communities do not drive due to dementia, the traffic impact is greatly reduced. Additionally, the building will be staffed with a 24 hour onsite Nurse to respond quickly to resident issues and greatly reduces the need for 911 assistance. The proposed building will be located close to Highway 99 which will reduce the traffic impact on the arterial streets. The project will be in the Highway 99 Corridor Overlay and we will meet all of the overlay design requirements. Bus stops and a proposed loading zone are located nearby on the public sidewalks for staff to use which will further reduce the impact of traffic on the city. This is in support of the sustainability goal B from the City Comprehensive plan. in the event that hospitalization or 911 assistance is needed, the proposed location is less than .5 miles from Swedish Hospital, and approximately 1.5 miles driving distance from Fire Station 16. RJ Development 401 Central St SE — Olympia, WA 98501 (360-528-3343) — www.ridevelopmentservices.com Additionally, due to the nature of our project and the low impact to traffic, we have received approval from JoAnne Zulauf to submit a traffic impact analysis with the submission of the building permit application instead of with this Design Review submittal. We anticipate using the Assisted Living Land Use Category (ITE Land Use 254) identified in the ITE Trip Generation Manual and will complete an independent study to determine the impact fee ($ per dwelling) for this category (currently not identified in the City of Edmonds Traffic Impact Fee Rates Table). In accordance with Sustainability goal G.2 within the Comprehensive Code, our Memory Care use will allow residents to remain in the community of Edmonds and lessen the need to move elsewhere as their health needs change. The building will contain interior courtyards with plants, common areas and walking corridors along with many windows that will allow more natural light in the building than typical buildings; we feel this will contribute to the health and wellbeing of the residents. The design of the building will incorporate architectural aspects seen in Edmonds and other communities in the Seattle area, designed to give a fresh look to the Northwest architecture and appeal that makes Edmonds unique. We feel this will help to upgrade the architectural and landscape design qualities as referenced from the Edmonds Community Development Plan. In addition to adhering to the Edmonds Community Development Plan and the Comprehensive Code, we are also developing our business and building to conform to the standards of the Washington State Department of Social and Human Services (DSHS) and the Department of Health to be licensed as an Assisted Living facility. We have worked with the State to obtain licensure in multiple cities in Washington and there are no foreseeable roadblocks for licensure in Edmonds. in fact, we have already completed a preliminary concept review meeting with the Department of Health and received positive feedback on the preliminary project design. With the unmet need for Memory Care in Edmonds, demographic trends indicating a growing need in the future, we are confident that our building and business will align with the goals and requirements of the Edmonds Community Development Plan and the Comprehensive Code and be a positive addition to the City of Edmonds. We look forward to being a part of the Edmonds community. If you have any questions about our proposal, please don't hesitate to contact us immediately. Sincerely, Jeff Yates Partner and Vice President RJ Development 360-528-3343 office 360-918-6037 mobile ieff@rodevelopmentservices.com RJ Development 401 Central St SE — Olympia, WA 98501 (360-528-3343) — www.r*developmentservices.com