2.pdf01C City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
DATE: June 21, 2006
TO: Dave Cleven.
deckconnection@earthlink.net
FROM: Jenny Readwin, Plans Examin+er'�
RE: Plan Check # 06-248
Project: Ziedalski Deck (yh
ProjectAddress: 159007 AveW.
During re -review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised
plans/documents (affected sheets only) with a written response to each of the above items to a
Permit Coordinator.
1) Engineer of Record to provide a detail showing connection of pier piles to footings (detail
should reflect Geotechnical Engineers report recommendations).
2) On the framing plan specify size of footings under each post shown. Also, show which footings
will require two piles versus one per the Structural Engineers calculations.
3) Revise section detail to reflect actual grade as well as the Geotech and Structural Engineer's
requirements (i.e. -footing dimensions, pin piles, grade is shown over posts, etc.).
4) Special inspections are required for the following. Complete the enclosed special mispection
agreement signed by the owner, the general contractor and the special inspector and submit to
the City for approval prior to issuance.
e Pin pile installation including connection to footings
a Field welding if required
. CITY OF EDMONDS
SPECIAL INSPECTION AND TESTING AGREEMENT
The project at issued under building permit
number requires special inspection and/or testing per IBC Chapter 17. The
complete list of special inspections is attached to this document.
BEFORE A PERNUT CAN BE ISSUED: The owner and contractor and special inspector shall complete
this agreement and the attached structural test(s) and inspections schedule including the required
acknowledgements.
APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building
Official prior to performing any duties or inspections. Each special inspector shall submit Statement of
Qualifications to the Building Official for review. Special inspectors shall display identification When
performing special inspections on site. Special inspection and testing shall meet the minimum requirements
of IBC Chapter 17 and the following:
A. Duties and Responsibilities of the Special Inspector
1. Observe Work
The special inspectgr shall observe the site work for conformance with the approved (stamped) plans
and specifications and applicable workmanship provisions of the IBC. Architect or Engineer
reviewed shop drawings may be used only as an aid to inspection. Special Inspections are to be
performed on a continuous basis —meaning that the special inspector is on site at all times observing
the work requiring special inspection. Periodic inspections, if any, must have prior approval by the
City based on a separate written plan reviewed and approved by the Building Official and the
engineer or architect of record.
2. Report Non -conforming Items
The special inspector shall bring non -conforming items to the immediate attention of the contractor
and note all such items in the daily field report. Any item not resolved in a timely manner shall be
immediate cause of the special inspector to notify the Building Official of the plan deviation, error,
change or omission. It shall also be the duty of the special inspector to promptly notify the engineer
or architect.
3. Complete Daily Reports
Each special inspector shall complete and sign both the specialinspection record 'and the daily report
form for each day's inspection. These records shall remain at the jobsite with the contractor for
review by the City Building Inspector.
4. Furnish Weekly Reports
The special inspector or inspection agency shall furnish the City with weekly reports of tests and
inspections. The project engineer or architect, and others as designated shall also be copied on
reports. Weekly reports must include the following:
Description of daily inspections and tests made with applicable locations
List of all non -conforming items
Report on status of non -conforming items (resolved or unresolved)
Itemized changes authorized by the Architect, Engineer and City if not included in non-
conformance items.
S. Furnish Final Construction Report
The special inspector or inspection agency shall submit a final signed report to the City stating that
all items requiring special inspection and testing were fulfilled and reported. And, to the best of
L:\TEMP\BUILDING�SpeclallnspectionAgreementIBC.doc 7/04
his/her knowledge the project is in conformance with the approved plans and specifications,
approved change orders and the applicable workmanship provisions of the IBC. Items not in
conformance or unresolved items or any discrepancies in inspection coverage, (i.e., missed
inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically
itemized in this report.
B. Contractor Responsibilities
1. Notify the Special Inspector
It is the duty of the contractor to notify the special inspector when work is ready for special
inspection. Note, the items listed on the attached schedule and as noted on the approved plans and
specifications are required to have special inspections. Adequate notice shall be provided by the
contractor so that the special inspector has time to become familiar with the project.
2. Provide Access to Approved Plans
The contractor is responsible for providing the special inspector access to approved plans at.the
jobsite.
3. Retain Special Inspection Records
The contractor is responsible to retain at the jobsite all special inspection records submitted by the
special inspector. These records are to be provided to the City building inspector upon request.
C. City of Edmonds Building Department Responsibilities
1. Approve special inspectors or inspection agencies
The building department shall approve all special inspectors and special inspection requirements.
2. Monitor special inspection and approve weekly reports
Work requiring special inspection and the performance of special inspectors shall be monitored by
the City Building Inspector. ffis/Her approval must be obtained prior to placement of concrete or
other similar activities in addition to that of the special inspector.
3. Issue Certificate of Occupancy
The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports
including the final report have been submitted and accepted.
D. Owner Responsibilities
The project owner or the engineer or architect of record acting as the owner's agent shall fund
special inspection services.
E. Eneineer or Architect of Record Responsibilities
The engineer or architect of record shall include special inspection requirements on the plans and
specifications.
ACKNOWLEDGEMENTS
I have read and agree to comply with the terms and conditions of this agreement.
Owner Date
Special Inspector
Date
General Contractor
Date
City Building Official
Date
L:\TEMP\BUILDINGNSpecia]InspectionAgreementIBC.doe 7/04
SPECIAL INSPECTION AND TESTING SCHEDULE
PROJECT NAME
PROJECT ADDRESS
REINFORCED CONCRETE, GUNITE, GROUT AND MORTAR:
Concrete Gunfte Grout Mortar
Tests
Mix Designs
Reinforcing Placezient
Batch PIaJ;t Inspection
Inspect Placing
Cast Samwes
Tests
PRECASTIPRESTRESSED CONCRETE:
rre- ji em 4-1""
Rei'domrip Tests
Temon Tests
Mix Desigris
Reinforcing Placement
Insert Placement
Concrete 132tChing
concTrit Placement
Itistallation Iwscpction
Cast samr)jes
Pic!,
Tests
MASONRY:
— Special Inspection Stresses Used
— Preliminary Acceptance Tests (Masonry Units. Wall Prisms)
— Subsequent Tests (Moriar. Grou I, Field Wall Prisms)
— Placement Inspenion of Units
ADDITIONAL INSTRUCTIONS OR OTHER TESTS
AND INSPECTIONS:
Form conipleted by-
TOephone No,: —
BIJELDING PERMU tqo,
tt-� IffWINNFECTION' AGENCY or SpEcIAL INSPECTOR
STRUCTURAL STEELtWELDING:
— Sample and Test (rm specific menibm below)
— Shop Material Identification
— Welding haptction oShop 0 RCW
— Ultrasonk inspection 0 Shop 0 FirM
— High-sumgth Bolting
Inspection 0 Shop 0 Field
DA325 DN DX DF
D A490
MeW Deck Welding Inspection
Rcialcircing Stftl Welding Inspection
— Metal Stud Welding Inspeaion
— ConcreAc Insert Welding Inspection
FIREPRWFING.-
- Placement Inspection
— Density Tests
— Thickness Tests
— Inspect 82tching
INSULATING CONCRETE-
- Sample and Tesr
— Macrincrit Inspection
— Unit Weights
FILLMATERIAL:
— Acceptance Tests
— Placeinen, Inspection
— Field Densiiy
STRUCTURAL WOOD:
Sh=W3]1 Nailing Inspection
Inspection ofGhi4ain F2b�
Inspection of Truss Joist Fab.
Sample and Test Components
Title:
Date: