200 ST SW - 8505_Thatcher SFR_BLD20060992.doc
City of Edmonds
TH
121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221
Website: www.ci.edmonds.wa.us
DEVELOPMENT SERVICES DEPARTMENT
Planning • Building • Engineering
Plan Review Corrections
Plan Check : Date:
# BLD20060992 September 27, 2006
Project Name/Address:
Thatcher SFR / 8505 – 200 St SW
Contact Person/Address/Fax:
SIGVA HELLEREN / ph 206-920-2597 / fax 425-774-3384
Reviewer: Edward SibrelDivision:Engineering
During review of the subject submittal it was found that the following information, corrections, or
clarifications will need to be addressed:
1.Detention / Storm:
Impervious surface measures out at 5300 s.f., not the 4935 s.f. that the current detention design is based on.
with supporting calculations
Please resubmit a detention design , signed and stamped by a licensed engineer,
that reflects the measured impervious surface.
The detention vault is labled ‘side sewer’. This is in error.
on the site plan
Please show how the detention system connects to city storm conveyances .
2.Trees: three trees are proposed to be removed from the site. These trees are within the City right-of-way and
may not be removed without written permission from the city. This permission shall not be be granted prior
to a successful Right-of-Way permit review from both the Public Works Director and the Parks Maintenance
Manager. Be advised that if such permission is not obtained, the trees must remain and the driveway will be
required to be moved. The city policy for tree removal is attached for your review.
3.The water meter is shown on the site plan to be on private property; it is required to be on the city side of the
ROW line.
4.Note: on uncurbed streets, the driveway must be asphalt from the edge of street to the property line or 20’,
whichever is greater.
5.Utilities separation: please show a minimum 10’ separation between water and side sewer lines.
DATE FAXED 9/27/06 2 PAGES
6.Side Sewer:
A cleanout is required a minimum of 24” from the house, as well as at every bend in the sewer line greater
than 45 degrees. Please show on site plan.
A 6” cleanout with cast iron lamphole cover per city standards is required at the property line.
7.TESC: Please show proposed erosion control measures on the site plan
Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please
contact me at 425-771-0220 if you have specific questions regarding these plan corrections.
DATE FAXED 9/27/06 2 PAGES