20000226.pdfCITY OF EDMONDS �
CONSTRUCTION PERMIT APPLICATION
ER NAMENV��E OF BUSINESS
ma
u'p.v)( /&f 7
FIPERMIT EXPIRES
US' PERMIT
ZONE NUMBER
JOB SUITEMPT.
ADDRESS
PLAT NAMEISUBDIVISION NO. I LOT NO, LID NO,
LID FEE E
0
_�Ull IC RIGHT OF WAY PER OFFICIAL STREET MAP P_
EXIS ING — PROPOSED— ---
41 ..... .
REQUIRED DEDICATION— FT —
MPEW����F FIXTURES YEP REQUIRED
S 0 No C3
REM RKS
F FOR EROSION CONTROUDRAINAGE
19 SP1q
a.
V T
I t b 'm au'L �a..Izk �6 , d� kl
6Zj,,t
NA E
ley ig h 0,&oe //V— ENGINEERING REVIEWS.' AI.
I,
ADDRESS
9joo FIRE REVIEWED By DATE
CIT ZIP LE
Wo od _.
-
L, a3l
tj
11 VAR IANCEORCU SHORELINE GO ADB# INSP
R
STATE LICENSE NUMBER EXPIRATION— .—I
oy.
rsatd IV A' Id—J — 0 SEPA REVIEW SIGN AREA HEIGHT
COMPILE PROPOSED ALLOWED PROPOSED
P Fly COUNr RCEL O� TO I EXEMPT
0 "P "A
LOT COVERAGE REQUIRED SETBACKS (FT) PROPOSED SETBAC S (FTJ
0 NEW C] RESIDENTIAL 0 PLUMBING I MECH ALLOWED PROPOSED FRONT SIDE REAR FRONT UR SIDE REAR
n C MPLIANCE OR ALI
0 ADDITION COMMERCIAL CHANGE OF USE Ne-
PARKING LOT AREA PLANNING REVIEWED BY DATE
REMODEL APARTMENT SIGN REGO I PROVIDE
Z5 ZE50*
GH60ING CYGE FENCE
0 REPAIR 0 X FT) ARKS
pi,�
C3 DEMOLISH 0 TANK OTHER
RITAININGWALL RENEWAL
�RAGE F.XERY 0
(TYPE OF USE, BUSINESS OR ACTIVITY) P
CHO Y
CUPA TK
TYIEICF.C:: ISTRUCTION ROUP
NUMBER
0 El I ING
SPECIALIN P GTOK AREA
OCCUPANT
LOAD
F RIES U
0 STO
REOUIAEO YES
DESCRIBE WORK TO BE DONE
REMARKS
PROGRESS INSPECT IONS PER UBC 10811FINAL INSPECTION REO'
�+I
If e k-v-1 dq A-VIA11d AtIbL, R5
r
VALUATION
FEE
PLAN CHECK FEE
HEAT SOURCE GLAIING% LOTSLOPE�
BUILDING
PLAN CHECK NO: IVESTED DATE
PLUMBING
THIS PERMIT AUTHORIZES ONLY 1111 WORK NOTED, THIS PERMIT COVERS IVORK TO
BE ... 0. PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC
2 DOMAIN ICURB , SIDEWALKS, VEWAYS MA GLEES, ETC.) WILL REQUIRE
L IIII. DRI R
DOMAIN 'CURBS' 5""
:1 SEPARATE PERWISSION.
L
MECHANICAL
GRADINGIFILL
STATE SURCHARGE
PERMIT APPLICATION: 180 DAYS
PERMIT UMIT. 1 YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS
I '
ENG. REVIEW FEES
SEE BACK OF.PINK,PERMIT FOR MORE INFORMATION
ICANT. ON BEHALF OF HIS OR HER SPOUSE. HEIRS� ASSIGNS AND SUCCESORS
;APPLI H
'NPINTEREST. AGREES TO INDEMNIFY, DEPEND AND HOLD HARMLESS THE CITY OF
OMONOS, WASHINGTON, ITS OFFICIALS, EMPLOYEES. AND AGENTS FROM ANY AND
S E B
ALLCLAIMSFOADAMAGESOFWHATEVER NATURE, ARISING DIRECTLYOR INDIRECTLY
I FROM THE ISSUANCE OF THIS PERMIT, ISSUANCE OF THIS PERMIT SHALL NOT BE
ESU NC
DEEMED To MODIFY, WAIVE 0 REDUCE ANY REQUIREMENT OF ANYCITYORDINANCE
OR LIMIT IN ANYWAY THE CITY ILITY TO ENFORCE ANY ORDINANCE PROVISION,
IT, NYW Y
0 NOR "M NA A 'SAO
0 N THE'
ENG. INSPECTION FEE
L.
IN
PLAN CHECK DEPOSIT
TOTAL AMOUNT DUE
Zo OT,
REC PTIV
PECEI IT
--T'N
]HERE ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION: THAT THE INFORMATION
GIVEN ly CORRECT. AND THAT I AM THE OWNIFO OR THE DULY AUTHORIZED AGENT OF -
THE OWNER, I AGREE To COMPLYWITH CITY At STATE _AWSREGULkTtNGCONSTRUC
TION; AND IN DOING THE WORK AUTHORIZED THEREBY NO PERSON WILL BE EMPLOYED
IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO
WORKMEN'S COMPENSATION INSURANCE AND FICW 18.27
TURE (OWNER OR AGENT) SIGNED
aT
APPLICATIOITAPPROVAL
Thil pplical,on m C 1.1-11 -MI -1g, �d bY.11-
CALL QPuI,:.,,dF.. id. -�d
FOR INSPECTION
OF, SIG R DATE
(425) OF' "0
771-0220 _y All
RELEAS BY
RELEAS By
A TENTIO -C' EXT 333
IT IS UNLAWFUL TO USE 08 OCCUPY A BUILDING 08 STRUCTURE UNTIL 771-0221
A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI-
CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 FAX
:&
ORIGINAL -FILE - YELLOW - INEPECT.O
PINK -OWNER - GOLD . ASSESSOR
5�8
z
0
m
vi -4
c m
m , f� ,
0
c
m
0 -n
n
m m
a V5
0
0 M
C 0)
C Do
;D
>
z
z
9
0
m
FINAL PROJECT APP VAL FORM
TO:
DATE:
MEMO TO: PERINET COORDINATOR, BUILDING DIVISION
FROM: _FIRE DEPARTNIENT DATE —
ENGINEERING DIVISION DATE-21 —C--1 C)P
PLANNING DIVISION DAT
I MSM
PROJECT---B-tS�Q �1 u�
SITE ADDRESS
PERNUT # ADB#—DATE INSPECTED 6. (an.
PECTED
DESCRIPTION OF WORK TO BE INS
A field mispection was conducted to determine compliance with approved plans. Finatapproval denotes, t bat
there are no objections from the above signed Department to the granting of:
___�_--Final approval ofthe described work
_Performance Bonds associated with the project may be released
—GRANT FINAL PROJECT APPROVAL
-7�
_GRANT FINAL PROJECT APPROVAL WITH CONDITIONS NOTED
I
—FAILED MAL INSPECTION - OUTSTANDING ISSUES
2.
3.
_______AE-INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
ocaprvl.doc.l:tcmp.*bldg:fo-6198
z
C m
ma
0
80
C
M
M Z
'0-4
C: 2
o -n
"n
M m
0,
2
q: M,
M C)
z
z
m
z
0
m
:4 �n
m
m 0
-40
00
c
-4 K
m m
M z
jo-q
c
co
0
mc
m
C3 V5
0,
0 9;
c
&- co
rn 0
z
--i
(1)
z
9
0
m
�V,
6629 217- SW Lywwo4 WA99036 I
Phm�. 425471-6666
F— 425-771-6559
June 21, 2000
01
in
Mr. James Markezinis
—n
W
I I I Third Avenue North 4301
mr
Cc)
i�
Edmonds, WA 98020
in,
in
Subject: Bayview Plan
0 C,
i
Parking Revisions
I 10 Third Avenue North
in
Edmonds, WA
A;"Iii�ArMr Markezinis:
ch
Your u est� and as required by the City ofEdmonds, Edwin F. baker, P.E. of
0
0 -n
. -,req
"I"B'W"'n"j�neers Inc. P.S. made several site visits to the
erE referenced project for the
m in
observing construction progress. In addition to Baker's site visits, Mayes
5"�',"IT64i4 rigineers, inc. inspected the structural steel nst ction on May 12,2000.
co ru
C�W
(Sec� attached) the two welding deficiencies found by Mayes Testing have
10
s . Obs uently been corrected.
Concrete placement and structural steel erection were observed by Baker Engineers,
Inc.P.S. To the best of our knowledge, the construction is in accordance with the
approved plans, details and specifications.
Please call if you have any questions.
ni�
Sincerely, A*
889a
g,�
d n F. Baker P.E.
E wi
President
R,
s 2110
cc. Geston Construction
. . . . . . . . . . . . . . . . . . . . . . .
IN
�RtAyltiv
TESTING
ENGINEERS, INC.
917-134th St. SA - Suite A-1
PH, (425) 742-9360
Everett, WA 98204
Fox (4251745-1737
10029 So' TaCOMO WY, Suite E-2
PH. (253) 584�3720
Tacomo, WA 98499
FAX (253) 584-3707
INSPECTORI/ L
SITE TIME:_
TO:
TRAVEL TIME-._
HOURS
SAMPLES:
.--..v
JOB NUMBER: DATE: -6.) Page_Z-01-L
d
WEATHER:
REAMITI.: ;Z99Z
F-�
PROJECT: f
OWNER:
ARCHITECT:
ENGINEER:
CONTRACTOR:
TYPE OF INSPECTION: 1/7-
0
m
vii
0
A,
4d'l- el 14� -s�� m
C2
(2 7/-
5
m M
7z 101 5i�
rn
It
pp "T
oll 0Q,
NONCONFORMING CONDITIONS/CORRECTIVE ACTION TAKEN:
77",-7
&
NELSON-COUVRETTE &ASSOCIATES INro
FIELD REPORT
ENO—R$, G-1-ISTS
VIRONMENTAL SCIENTISTS
Project- 11761-zll
HeN
17311-135th Avenue NE, A-500
Woodinville, WA 98072
Owner:
D
1669 (426) 337-1669
Re
Location:
Weather:
Page: of
Purp�SF
)f Visit: r,2011 )�,l
By:
7
V;L:
m
C
I sl
A
m
0
.-to
Oc
V"I J C, �4 x
bee- fe,vov,
f le"14 0 C 0�1— D� 0 ZA. <- 0 e k C-4 L I-
m
V- "C"; we e
0 -n
je;— C L111
CK-k 3
M T
6-
e4 -Tz, L,
:00
0
41 C, We r 4,/
)'At
/ , , �-1 7 1717
16v 4
2"
z
z
0
0
"V,
. . ....
I, JAC
41
r cy
I'G 1
-/1—
OL':2--L, If
Attachments:
Signed* x
Distribution:
TESTING N�INEERS, INC.
Zs�
jkl[cravaD
Gestson Construction
MAY 2 2 M
1429 Avenue D
Snohomish, WA 98290
p0mcmm
PROJECT: BAY VIEW PLAZA
Job 4: E0107
Permit Edmonds 200226
I I ,
Owner:
01�
Architect:
Engineer:
Contractor: Gestson Constr.
INSPECTION REPORTS
am
5/12/00
Inspected l't floor framing reinforcement added at Markezinis parking garage. Welds are in
-;4 0;t
0
accordance with approved drawings and AWS D 1 - 1-9 8 except missing welds at west support.
M-
Two places at V%TF stubs between beams at west side s outh of splice.
N:
NONCONFORMING CONDITIONS/CORRECTIVE ACTION TAKE
Missing welds, Informed Rick, Geston Construction. Structural engineer, Ed Baker, said he
ca"
11 verif a ceptable completion.
INSPECTOR: Bill Belleveau
REVIEWED B y
C�
M
E.
m
Ig
j.
917 - 134th St. SM., Suite A-1 Everett, WA 98204 (425) 742-9360 FAX (425) 745-1737
CITY OF EDM b`N'DS GARY HAAKENSON
MAYOR
21 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 FAX (425) 771-0221
DEVELOPMENT SERVICES DEPARTMENT
Planning - Building Engineering
May 23, 2000
Rick Geston
Geston Construction
1429 Avenue D, Suite 507
Snohomish, washington 98290
C
m
RE: Intumescent Fire Protective Paint
110 Yd Avenue North, Permit #200226
A
Dear Rick,
We have reviewed the information submitted on the Cafco inturnescent paint product and
'co
0 n
are unable to approve the use of this paint material as an equivalent to Uniform Building
Building Code Section
Code Section 704 for protection of structural members. Uniform
this
704.6 requires that spray WE Ed fire proofing meet UBC Standard 7-6. In reading
0
standard only fibrous and cementitious fire resistive materials are addressed, not
that
0 hi
intumescent paint. An approved method for fire protection Of structural members
1
meets this code requirement is clearly indicated on the approved plans for this project.
10,
Please also note the requirement forjacketing protection of the fire resistive material.
IfI can be of further assistance please feel free to contact me at 425 -771-0220.
Z!,
Al
Thank you,
(01
0
9
Oi
Jeannine L. Graf
Building Official
Incorporated August 11, 1890
Sister City - Hekinan, Japan