Loading...
20000226.pdfCITY OF EDMONDS � CONSTRUCTION PERMIT APPLICATION ER NAMENV��E OF BUSINESS ma u'p.v)( /&f 7 FIPERMIT EXPIRES US' PERMIT ZONE NUMBER JOB SUITEMPT. ADDRESS PLAT NAMEISUBDIVISION NO. I LOT NO, LID NO, LID FEE E 0 _�Ull IC RIGHT OF WAY PER OFFICIAL STREET MAP P_ EXIS ING — PROPOSED— --- 41 ..... . REQUIRED DEDICATION— FT — MPEW����F FIXTURES YEP REQUIRED S 0 No C3 REM RKS F FOR EROSION CONTROUDRAINAGE 19 SP1q a. V T I t b 'm au'L �a..Izk �6 , d� kl 6Zj,,t NA E ley ig h 0,&oe //V— ENGINEERING REVIEWS.' AI. I, ADDRESS 9joo FIRE REVIEWED By DATE CIT ZIP LE Wo od _. - L, a3l tj 11 VAR IANCEORCU SHORELINE GO ADB# INSP R STATE LICENSE NUMBER EXPIRATION— .—I oy. rsatd IV A' Id—J — 0 SEPA REVIEW SIGN AREA HEIGHT COMPILE PROPOSED ALLOWED PROPOSED P Fly COUNr RCEL O� TO I EXEMPT 0 "P "A LOT COVERAGE REQUIRED SETBACKS (FT) PROPOSED SETBAC S (FTJ 0 NEW C] RESIDENTIAL 0 PLUMBING I MECH ALLOWED PROPOSED FRONT SIDE REAR FRONT UR SIDE REAR n C MPLIANCE OR ALI 0 ADDITION COMMERCIAL CHANGE OF USE Ne- PARKING LOT AREA PLANNING REVIEWED BY DATE REMODEL APARTMENT SIGN REGO I PROVIDE Z5 ZE50* GH60ING CYGE FENCE 0 REPAIR 0 X FT) ARKS pi,� C3 DEMOLISH 0 TANK OTHER RITAININGWALL RENEWAL �RAGE F.XERY 0 (TYPE OF USE, BUSINESS OR ACTIVITY) P CHO Y CUPA TK TYIEICF.C:: ISTRUCTION ROUP NUMBER 0 El I ING SPECIALIN P GTOK AREA OCCUPANT LOAD F RIES U 0 STO REOUIAEO YES DESCRIBE WORK TO BE DONE REMARKS PROGRESS INSPECT IONS PER UBC 10811FINAL INSPECTION REO' �+I If e k-v-1 dq A-VIA11d AtIbL, R5 r VALUATION FEE PLAN CHECK FEE HEAT SOURCE GLAIING% LOTSLOPE� BUILDING PLAN CHECK NO: IVESTED DATE PLUMBING THIS PERMIT AUTHORIZES ONLY 1111 WORK NOTED, THIS PERMIT COVERS IVORK TO BE ... 0. PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC 2 DOMAIN ICURB , SIDEWALKS, VEWAYS MA GLEES, ETC.) WILL REQUIRE L IIII. DRI R DOMAIN 'CURBS' 5"" :1 SEPARATE PERWISSION. L MECHANICAL GRADINGIFILL STATE SURCHARGE PERMIT APPLICATION: 180 DAYS PERMIT UMIT. 1 YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS I ' ENG. REVIEW FEES SEE BACK OF.PINK,PERMIT FOR MORE INFORMATION ICANT. ON BEHALF OF HIS OR HER SPOUSE. HEIRS� ASSIGNS AND SUCCESORS ;APPLI H 'NPINTEREST. AGREES TO INDEMNIFY, DEPEND AND HOLD HARMLESS THE CITY OF OMONOS, WASHINGTON, ITS OFFICIALS, EMPLOYEES. AND AGENTS FROM ANY AND S E B ALLCLAIMSFOADAMAGESOFWHATEVER NATURE, ARISING DIRECTLYOR INDIRECTLY I FROM THE ISSUANCE OF THIS PERMIT, ISSUANCE OF THIS PERMIT SHALL NOT BE ESU NC DEEMED To MODIFY, WAIVE 0 REDUCE ANY REQUIREMENT OF ANYCITYORDINANCE OR LIMIT IN ANYWAY THE CITY ILITY TO ENFORCE ANY ORDINANCE PROVISION, IT, NYW Y 0 NOR "M NA A 'SAO 0 N THE' ENG. INSPECTION FEE L. IN PLAN CHECK DEPOSIT TOTAL AMOUNT DUE Zo OT, REC PTIV PECEI IT --T'N ]HERE ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION: THAT THE INFORMATION GIVEN ly CORRECT. AND THAT I AM THE OWNIFO OR THE DULY AUTHORIZED AGENT OF - THE OWNER, I AGREE To COMPLYWITH CITY At STATE _AWSREGULkTtNGCONSTRUC TION; AND IN DOING THE WORK AUTHORIZED THEREBY NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND FICW 18.27 TURE (OWNER OR AGENT) SIGNED aT APPLICATIOITAPPROVAL Thil pplical,on m C 1.1-11 -MI -1g, �d bY.11- CALL QPuI,:.,,dF.. id. -�d FOR INSPECTION OF, SIG R DATE (425) OF' "0 771-0220 _y All RELEAS BY RELEAS By A TENTIO -C' EXT 333 IT IS UNLAWFUL TO USE 08 OCCUPY A BUILDING 08 STRUCTURE UNTIL 771-0221 A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 FAX :& ORIGINAL -FILE - YELLOW - INEPECT.O PINK -OWNER - GOLD . ASSESSOR 5�8 z 0 m vi -4 c m m , f� , 0 c m 0 -n n m m a V5 0 0 M C 0) C Do ;D > z z 9 0 m FINAL PROJECT APP VAL FORM TO: DATE: MEMO TO: PERINET COORDINATOR, BUILDING DIVISION FROM: _FIRE DEPARTNIENT DATE — ENGINEERING DIVISION DATE-21 —C--1 C)P PLANNING DIVISION DAT I MSM PROJECT---B-tS�Q �1 u� SITE ADDRESS PERNUT # ADB#—DATE INSPECTED 6. (an. PECTED DESCRIPTION OF WORK TO BE INS A field mispection was conducted to determine compliance with approved plans. Finatapproval denotes, t bat there are no objections from the above signed Department to the granting of: ___�_--Final approval ofthe described work _Performance Bonds associated with the project may be released —GRANT FINAL PROJECT APPROVAL -7� _GRANT FINAL PROJECT APPROVAL WITH CONDITIONS NOTED I —FAILED MAL INSPECTION - OUTSTANDING ISSUES 2. 3. _______AE-INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL ocaprvl.doc.l:tcmp.*bldg:fo-6198 z C m ma 0 80 C M M Z '0-4 C: 2 o -n "n M m 0, 2 q: M, M C) z z m z 0 m :4 �n m m 0 -40 00 c -4 K m m M z jo-q c co 0 mc m C3 V5 0, 0 9; c &- co rn 0 z --i (1) z 9 0 m �V, 6629 217- SW Lywwo4 WA99036 I Phm�. 425471-6666 F— 425-771-6559 June 21, 2000 01 in Mr. James Markezinis —n W I I I Third Avenue North 4301 mr Cc) i� Edmonds, WA 98020 in, in Subject: Bayview Plan 0 C, i Parking Revisions I 10 Third Avenue North in Edmonds, WA A;"Iii�ArMr Markezinis: ch Your u est� and as required by the City ofEdmonds, Edwin F. baker, P.E. of 0 0 -n . -,req "I"B'W"'­n"j�neers Inc. P.S. made several site visits to the erE referenced project for the m in observing construction progress. In addition to Baker's site visits, Mayes 5"�',"IT64i4 rigineers, inc. inspected the structural steel nst ction on May 12,2000. co ru C�W (Sec� attached) the two welding deficiencies found by Mayes Testing have 10 s . Obs uently been corrected. Concrete placement and structural steel erection were observed by Baker Engineers, Inc.P.S. To the best of our knowledge, the construction is in accordance with the approved plans, details and specifications. Please call if you have any questions. ni� Sincerely, A* 889a g,� d n F. Baker P.E. E wi President R, s 2110 cc. Geston Construction . . . . . . . . . . . . . . . . . . . . . . . IN �RtAyltiv TESTING ENGINEERS, INC. 917-134th St. SA - Suite A-1 PH, (425) 742-9360 Everett, WA 98204 Fox (4251745-1737 10029 So' TaCOMO WY, Suite E-2 PH. (253) 584�3720 Tacomo, WA 98499 FAX (253) 584-3707 INSPECTORI/ L SITE TIME:_ TO: TRAVEL TIME-._ HOURS SAMPLES: .--..v JOB NUMBER: DATE: -6.) Page_Z-01-L d WEATHER: REAMITI.: ;Z99Z F-� PROJECT: f OWNER: ARCHITECT: ENGINEER: CONTRACTOR: TYPE OF INSPECTION: 1/7- 0 m vii 0 A, 4d'l- el 14� -s�� m C2 (2 7/- 5 m M 7z 101 5i� rn It pp "T oll 0Q, NONCONFORMING CONDITIONS/CORRECTIVE ACTION TAKEN: 77",-7 & NELSON-COUVRETTE &ASSOCIATES INro FIELD REPORT ENO—R$, G-1-ISTS VIRONMENTAL SCIENTISTS Project- 11761-zll HeN 17311-135th Avenue NE, A-500 Woodinville, WA 98072 Owner: D 1669 (426) 337-1669 Re Location: Weather: Page: of Purp�SF )f Visit: r,2011 )�,l By: 7 V;L: m C I sl A m 0 .-to Oc V"I J C, �4 x bee- fe,vov, f le"14 0 C 0�1— D� 0 ZA. <- 0 e k C-4 L I- m V- "C"; we e 0 -n je;— C L111 CK-k 3 M T 6- e4 -Tz, L, :00 0 41 C, We r 4,/ )'At / , , �-1 7 1717 16v 4 2" z z 0 0 "V, . . .... I, JAC 41 r cy I'G 1 -/1— OL':2--L, If Attachments: Signed* x Distribution: TESTING N�INEERS, INC. Zs� jkl[cravaD Gestson Construction MAY 2 2 M 1429 Avenue D Snohomish, WA 98290 p0mcmm PROJECT: BAY VIEW PLAZA Job 4: E0107 Permit Edmonds 200226 I I , Owner: 01� Architect: Engineer: Contractor: Gestson Constr. INSPECTION REPORTS am 5/12/00 Inspected l't floor framing reinforcement added at Markezinis parking garage. Welds are in -;4 0;t 0 accordance with approved drawings and AWS D 1 - 1-9 8 except missing welds at west support. M- Two places at V%TF stubs between beams at west side s outh of splice. N: NONCONFORMING CONDITIONS/CORRECTIVE ACTION TAKE Missing welds, Informed Rick, Geston Construction. Structural engineer, Ed Baker, said he ca" 11 verif a ceptable completion. INSPECTOR: Bill Belleveau REVIEWED B y C� M E. m Ig j. 917 - 134th St. SM., Suite A-1 Everett, WA 98204 (425) 742-9360 FAX (425) 745-1737 CITY OF EDM b`N'DS GARY HAAKENSON MAYOR 21 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 FAX (425) 771-0221 DEVELOPMENT SERVICES DEPARTMENT Planning - Building Engineering May 23, 2000 Rick Geston Geston Construction 1429 Avenue D, Suite 507 Snohomish, washington 98290 C m RE: Intumescent Fire Protective Paint 110 Yd Avenue North, Permit #200226 A Dear Rick, We have reviewed the information submitted on the Cafco inturnescent paint product and 'co 0 n are unable to approve the use of this paint material as an equivalent to Uniform Building Building Code Section Code Section 704 for protection of structural members. Uniform this 704.6 requires that spray WE Ed fire proofing meet UBC Standard 7-6. In reading 0 standard only fibrous and cementitious fire resistive materials are addressed, not that 0 hi intumescent paint. An approved method for fire protection Of structural members 1 meets this code requirement is clearly indicated on the approved plans for this project. 10, Please also note the requirement forjacketing protection of the fire resistive material. IfI can be of further assistance please feel free to contact me at 425 -771-0220. Z!, Al Thank you, (01 0 9 Oi Jeannine L. Graf Building Official Incorporated August 11, 1890 Sister City - Hekinan, Japan