20000767.pdf[PERMIT
EXPIRES
................
CITY OF EDMONDS Z
PERMIT A&,747
HE rM NUMBER
o4e� -z---r SUITVAPTN
CONSTRUCTION PERMIT APPLICATION
OWNER NAMjAj:E,,OF BUSHE.SS
-n V�F,
PI -AT NAMFISUBDIVIStON NO�
10T No
N
LID FEE $
MAILINGADDRESS
IT-4
PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAI
EXISTING &`;' PROPOSED
R QUIRES) DEDICATION i'J2 FT
E
METE VIZE LlNg SIZE NO OF FIXTURES
�d
,,= A 1-.
..� d
PRV REQUIRED
YES 0
CITY ZIP TELEPHONE
NAME
ADDRESS
H'W`NE`R'lCONlAACTOA RESPONSIBLE FOR EROSION CONTROUDRAINAGE
CITY
09
TELEPHONE
WA at(k, 920,14 'its
NAME
p9p!��NA41645--r
j&)sr Wb - 31 -1"& 0
i
ENGINEERING ATE qt.1-4/
ADDRESS
7— TJ 4 r: >T.
IE ED
2.
'CITY ZIP
Z�
PHONE
1 PTELEPHONE
; -) 5 4
-
V U
MORELINE OR ADBN
INSPIO�IONT
SON
-44.
FIE C)
-1YP. NO
ONO
P STEE
PC
OS
STATE LICENSE NUMBER
IDF,e k�i CA Ic) I "ZOO I
601nio-
SEPA 111111
EXEMPT
EXP
SIGN AREA
ALLOWS PROPOIED
HEIGHT
ALLOWED , PR POSED
P P80PERW TAX ACCOUNT ADEL MD.
ROPERTY TAX ACCOUNT
In
NEW 0 RESIDENTIAL PLUMBINGIMECH
C MPLIANCEOR
[3 ADDITION C3 COMMERCIAL 0 CHOANGE OF USE
LOT COVERAGE
ALLOWED PROPOSED
4tr
AEOUIRE 11TBACKS (FT.)
FA REAR
ONTO SIDE
PROPOSED SETBACKS (FT.
FRONT A SIDE REAR
PA KING
LOT AREA
I PLANNING REVIEWED BY
0 REMODEL APARTMENT 0 SIGN
E
0 REPAIR N'm CY.S ;K " ZL X FTJ
PROVOED
I
.... ;ft. jWtEW
0 DEMOLISH 0 TANK n OTHER
lHpbe�p
R
-AAA-E AMrWALL 0 RENEWAL
g CARPORT
(TYPE OF USE, BUSINESS 08 ACTIVITY) EXPLAIN:
CHECKED BY
g7u.7mN
C OCCUPA
GROUP
NUMBER
OF
0 STORIES
NUMBER a F
-
DWELLINOF 4�
CRITICAL
AREAS
NUMBER
SPECIFIED YES
REOU BL "Z 0
d6,-,)w 7zb
DESCRIBE WORK TO BE DONE
REMARKS
OGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION RED
Fyj -_I— -m
-45M L Ovy 6- Q1
O;Ar�5wW AeAMIT
lb&A
VALUATION
PLAN CHECK FEE
HEAT SOURCE LO� BUILDING
�ESTED DATE PLUMBING
L PLAN CHECK NO: MECHANICAL
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED, THIS PERMIT COVERS WORK TO
VATE PROPERTY ONLY. ANY CONSTRUCTIOC.)OWN EP BLIC
ON PAI N
GRADING/lILL
BE DONE IT
DOMAIN S. SIDEWALKS, DRIVEWAYS, MAROUEES, ET LH IEGUUIRE
(CURB
SEPARATE PERMISSION.
STATE SURCHARGE
PE RMIT APPLICATION, 180 DAYS
W A
PERMIT LIMIT, I YEAR . PROVIDED OAK IS STA TED WITHIN 180 DAYS
G. BEVIS FE S
EN REV]
SEE BACK OF PINK PERMIT FOR MORE INFORMATION
CTIO FEE
EN I SP C
A' A NIE ALFOlHI HEIAS� A SIGNS AND SUCCESORS
A,",NIFY� I'S F.N. X11. . ARMLESS THE CITY 0;
;P C N`Fio To, S .. ...... USE ""SLD
NLTEAES
A BE
N . A EH IMTSIROM ANY AND
.. Al"IN'T" TS OFFICIALS. EMPLOYEES NIIAG
'OM , A RECTLY
L' XYG.,A�. LY
...A W NATUAE'AA ,,A
ALL�11. F AOE�D HATEVER
SHIND
THIS PERMIT, ISSUANCEOFTHIS PERMIT ALL NOT BE
IF ANYCJTY ORDINANCE
PROVISION,'
,ADINANCE
'H'R"y 'AT: HAVE READ THIS APPLICATION: THAT THE INF FWATK)N
AUTHORIZED AGENT OF
.,,BN B=LTEDNG�ETT.'
�A AT AM THE OWNER. OR THE DULY
THEOWNER [AGRE PLY WITH CITY AND STATE LAWS REGULATING CEMISLTORYIIC�
'TOCOM
CALE
TION: AND IN DOING THE WORK AU HORIZED THEREBY. N 0 PERSON WILL BE Mf
RELATING TO
FOR INSP CTION
IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON
WORKMEN'S COMPEN5AA0N INSURANCE AND RCW 18.21.
DATE SIGNED
(42!
0
Z -7 . !�
771-0220
EXT/333
A-ffENTION
IT 1�,uNCAWFLJL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL
771-0221
FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI-
A
CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109
FAX
519.
�33 i �k Q�D/,'km,
T", .... .. 0"'
�_.Wg. Pao p-dod
DATE
1_4
luil wag Z)
ORIGM-FILE YELLOW,INBP-1 Cm
PINK -OWNER GOLD - ASSESSOR i
z
0
TI MY T M AM) Y-d" -(IN
,AIAA
Of cbmonbg
YQT
BUSILD"
N.,
At: A Bulldlmq4t!r": 12011767
Occupancy established by this t.,:
Dw*lllng,Units:
No. Stories: 2
RIIUI
Type rponstructlon: V-N Sprink 1.
Basermant: Yes
Max —01orp.B.C. 1002)
in
knu I.=I
otR 401
Omw af Building lower"" �" a. -:-2, . WA 98026
THEI Norlh� EQUIREMENTS OF T14E In?
ma4urItCondoo
EDnmm OF TH Fol;tllllllll OU E D CCUPANCY AND THE USE FOR
WMCH THE PROPOSED OCCUP= 11�8211
M
issued this
CH IAL
BY:
os
Zoot. d0—,wKy ".d bY MY d Elk-* ft"MMW-
A
n pwtiWrelmcfi�02101
GARY HAAKENSON
CITY OF EDMONDS MAYOR
v,
1215TH AVENUE NORTH - EDMONDS,WA9M- (425I771-02M- FAX(425)771-Ml
WebSite: ~.d.edmOnds.m.us
rn,
DEVELOPMENT SERVICES DEPARTMENT
Planning Building Engineering
October 24, 2001
0
5,
1
Frontier Bank
Attn: Mike Petty
—n
PO Box 70
Edmonds, WA 98020
m:
C
i
m 0.
Re: Maintenance Bond Project- S & I Properties, LILC @ 645 Bell Street, Edmonds
0
A
>
>, q
Dear Sir or Madame,
The City of Edmonds hereby authorizes the partial release of the above referenc, ad
'011
-n
Performance Frozen Fund account in the amount of $16,235. All interested City Divisions have
inspected the required public improvements and landscaping and have granted fund release.
m FIR
ra:
The remaining funds of $2,865 m Ely be used as the required Maintenan ce Frozen Fund account
'0 ,
OR
1� I
which is required to be held for a period of two years to ensure that the site improvements and
landscaping are maintained. Prior to the expiration of this account the City shall conduct a site
01,
inspection to determine whether or not corrections or repairs are needed. As with the
performance frozen fund account, only written City authorization may release Maintenance
Frozen Funds.
Please be advised, the owner may replace these funds at any time with a bonding company
Z!
bond. If there are any questions, please call feel free to contact our office at 425-771-0220.
Q).
Sincerely,
&Wirrlson
Z
U
0
M
Permit Coordinator
Cc: Appficant
File'
Chron File
L-,fMN[P/DST/Pe& bond Partial releasefrozenIO/00
IncorporGted August 11, 1890
L
SM JOROVEMENT BOND RELEA&ORM
TO- PERMIT COORDINATOR, BUILDING DIVISION
ENGINEERING INSPECTOR DATE:
FROM:
�CK— PLANNING DIVISION
DATE SENT TO: DUE BACK /t2/jj_RFCEIVED:_
PROM
SITE ADDRESS_10, OWNER:<�rv`�
TYPE OF BOND TO BE RELEASED---tp�'-� $ ZZ
BOND DATE POSTED------------Y�OND EXPIRES —
Please field inspect at your earliest convenience for the release of the subject bond. If there
are outstanding requirements, please note in the space provided. Failure to respond by the
noted bond expiration date constitutes Department approval and automatic release of the
I
bond. it is each Department's responsibility to contact the developerlowner when outstand ng
issues prevent the release of the bond. Please copy the Permit Coordinator on all City
correspondence sent regarding this bond.
-L-M/4f4C'9 136t��
BOND IS APPROVED FOR RELEASE AF�4,L�PO PlAt M T
IS NOT APPROVED - OUTSTANDING REQUIREMENTS NOTED
2.
3.
WORK TO BE COMPLETED WITIEN -----PAYS SUSPENSE To
TO FILE
COPY TO DEvELOPER/CoNTRAGrOR
LternP-b1dg;fbnns-,bondre1 9/00
0:
M,
a M
C
"Mal
01
-10
0
M M�
Z1
0
C-
>Z�
0
M M
a
00
C
C Co
M o�
4
Z11
0,
M,
FINAL PROJECT APPROVAL.
TO:
DATE:
COORDINATOR, BUILDING DIVISION
MEMO TO: PERMIT
FROM: --------- FIRE DEPARTMENT DATE—
��EN DIVISION DATE I "'1 46
GINEERING
PLANNING DIVISION DATE—
PROJECT� 1E-WtrJ
SITE ADDRESS Wr W . .......
-7 & 7 ADB# .................... �ATE INSPECTED
PERMIT # 20520 f
DESCRIPTION OF WORK TO BE INSPECTED_QLf-4----�
A field inspection was conducted to determine compliance with approved plans. Final approval denotes that
the granting of
there are no objections from the above signed Department to
Final approval of the described work
::�GRA� FINAL PROJECT APPROVAL
CONDITIONS NOTED
GRANT PROJECT APPROVAL WITH
___—YAILED FINAL INSPECTION - OUTSTANDING ISSUES `10,4�,
2.
3.
RE-INSpECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
ocaprv1.doc.l:temp-bIdg:fb-6/98
2
FINAL PROJECT APPROVAL 10ORM
TO:
DATE:
MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION
FROM: �FIRE DEPARTMENT DATE�—
ENGINEERING DIVISION DATE�—
O�
PLANNING DIVISIONDATE
K
PROJEC
SITE ADDRESS� 6�6 AW
'C&
m
K
PERMIT 4/�6' 2 (0-72-- ADB#_-------PATE INSPECTED— C
DESCRIPTION OF WORK TO BE INSPECTED
Z,
4
Held inspection was conducted to determine compliance with approved plans. Final approval denotes that
�hiere are no objections from the above signed Department to the granting of: "0
Final approval of the described work
3:
M
GRANT FINAL PROJECT APPROVAL
0
AM
0,
GRANT PROJECT APPROVAL WITH CONDITIONS NOTED
____YAILED FINAL INSPECTION - OUTSTANDING ISSUES
Z,
2,
3.
—RE-INSpECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
41 ocaprvl.doc.l:temp:bldg:forms6t98
NMMO TO: pERNHT COORDINATOR, BUILDING DIVISION
FROM: (--_____---YIRE DEPARTMENT DATE_T—
ENGINEERING DIVISION DATE-
-PLANNING DIVISION DATE—
PROJECT__96L&2i�
SITE ADDRESS 5� 7-
-o -7 �- INSPEC
PERMIT _9�-v 7 �ADB#
DESCRIPTION OF WORK To BE INSPECTED 0(-26 F"t'4L
ance with approved P lans. Final approval de-tes that
A field inspection was conducted to determine comPli the granting of
there are no objections from the above signed Department to
___)C_Final approval of the described work
FINAL PROJECT APPROVAL
..... ..........
GRANT PROJECT APPROVAL WrM CONDITIONS NOTED
I C7,
___YAILED FINAL INSPECTION - OUTSTANDING ISSUES SC
'1 2
4110
;4 P0(4,
2.
3.
RE-INSpECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
ocaprvl.doc.l:temp*.bldg:forms6/98
FIALTROJ CT APPROVAL
TO:
DATE- IP,
MEMO TO: PERWT COORDINATOR, BUILDING DMSION
FIRE DEPARTMENT DATEJ-.��Z--
FROM:
i6l,
R
0�
DIVISION DATE
DIVISION DATE —
PROJECT Vil,
1 M 00�
7— --1 A
SITE ADDRESS 0 0,�
T In
INSPECTED
PERMIT # .,-----ADB#____—_-PATE
t
DESCRIPTION OF WORK TO BE INSPECTED-4ZI---ia—"����
A fleld inspection was conducted to determine compliance with approved plans. Final approval denotes that 0,
there are no objections from the above signed Department to the granting of I
In M;
00
Final approval of the described work
0
CO!
3-C
'%GRANT FINAL PROJECT APPROVAL 0
GRANT PROJECT APPROVAL WITH CONDITIONS NOTED
6i:
zi
— FAILED FINAL INSPECTION - OUTSTANDING ISSUES SEP 2 5,,(1
m
C;T, C.,p
2. U1,
3.
RE-JNSpECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
ocaprvl.doc.l:tmM-.bldg:forms6/98
FIAL PROJECT APPROVAL
---------
- ----
TO:
DATE:
MEMO TO: PERmrr COORDINATOR, BUILDING DIVISION
DATE---TL�:-
FROM: DEPARTNIENT
ENGINEERING DIVISION DATE—
01
ff
DATE-
0
1p;
PLANNING DIVISION
9�
ail,
a
!
PROJEC
Ms.
SITE ADDRESS 7-
0 C'
20/
-PATE INSPECTED—ILIL-
DESCRIPTION OF WORK TO BE INSPECTED—EhLL_�.�—I-�(—Ax
A field inspection was conducted to determine compliance with approved plans. Final approval denotes that
0
-n
there are no objections from the above signed Department to the granting of:
Final approval ofthe described work
I
fo�
M —
0 won
C
GRANT FINAL PROJECT APPROVAL
P,
Mo!
PROJECT APPROVAL WITH CONDITIONS NOTED
__.GRANT
Z'-i
FAILED FINAL INSPECTION - OUTSTANDING TVS
01
0
m
SC
'0 DE110
2.
3.
RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
ocaprvl.doc.l:tmW*.bldg:forms6/98
ICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEARTHAN THIS NOTICE
NOT
IT IS DUE TO THE QUALITY OF THE DOCUMENT.
1
60
in v H.
tA-
0%0% Ir lrlro%
COM ED BASEMENT FL6-oWAR"tAS 9 SQ.FT.
2,579 SQ.FT.
r
FIRST FLOOR LEVEL:
UNITS 101 & 102 COMBINDED, AREAS 2,540 SQFT-
STAIRS/ELEV/VEST 210 SO.FT.
COMBINED FIRST FLOOR AREAS 2,750 SQ.FT.
2,750 SQ.FT.
SECOND FLOOR LEVEL:
UNITS 201 & 202 COMBINDED AREA 2,540 SQ.FT.
STAIRSIELEV/VEST 210 SQFT.
EXTERIOR DECKS
COMBINED SECOND FLOOR AREAS 2,966 SQ.FT.
2,976 SQ.FT.
(BUILDING FOOTPRINT)
COMBINED AREAS - ALL FLOORS
8,305 SQ.FT.
LOT COVERAGE (45% MAX)
UNIT AREA/FLOOR 2,540 SQ.FT.
-4 -n'
DECK AREA/FLOOR 210 SQ-FT-
v;
COMMON USE AREA 715,5SO,
m:
2,965.5 SQFT.
TOTAL FOOTPRINT AREA 2,965.5 SQ-FT-
MAX. LOT COVERAGE (4596) = 2,970 SQ-FT-
ACTUAL LOT COVERAGE = 44.9%
jo
BUILDING HEIGHT CALCULATIONS:
65-
min!
E
AVERAGE EXISTING GRADE 101.77'
M M,
[97.6 + 100.25 + 105.0 +104.01 4 101.77
ra:
ALLOW. BLDG PEAK HEIGHT = 30,00'
ALLOW PEAK HEIGHT FROM GRADE - 131 77'
:0
; 0 Fi
co,
ACTUAL PEAK HEIG14T FROM GRADE = 131.37'
rm
NOTE: 4:12 OR GREATER ROOF SLOPE HEIGHT ALLOWANCE
CUTTING AND FILLING SUMMARY
MAX FILLING ON ENTIRE LOT 496.4 CUBIC YARDS
Ile
LIMIT OF FILL ESTIMATED AT 71 CUBIC YARDS
j 0�
-4
a
NORTH VISTA CONDOMINIUM
645 BELL STREET
EDMONDS, WASHINGTON 98020 TAX ACCOUNT NO. 4'
i L