Loading...
20000782.pdfFEB-28-2000 13:43 �,-�ITY OF EDMONDS RETURN ADDRESS: City of Edmonds, City Clerk 121 5th Avenue North Edmonds, WA 98020 DECLARATION OF RESTRICTIVE COVENANT NfULTI-FAAMY RESIDENTUL Reference 0: 2_0 0 1 Ll -I- - Grantur(s):(I)M'a"�� �7- 2)— Additional on pg.— Grantee(s)' City of Edmonds Legal Description (abbreviated): Sec 02-1 -Twn-�� �Kg-fL�Qtlr-S-9� OR Lgt­--------j3loUk--------Plat— Assessor's Tax Parcel U)#(s); (1)-,6� --Assessor's Tax Parcel Mo not yet assigned WHEREAS, are the owners of the following described real estateinthe CityofEdmouds,to wit: Property Address: &I Description, r-7- Of 4-7- A-1 V 0 V4� 7D/V Assessor's Tax Parcel ID # (8); 6 /,Y�? - 0 C, 0 0 AUTHORMD FOR RECORDING City of Edmon By: ate page --J— of MICROFILM z .0 0 M I cc) M, C: MCI P. 0 -.4 K 0 M C > 0 -n M M — 0 0 0 Fn C U); ca, Z, I z FEEI-28-2000 13:43 .--�CITY OF EDMONDS 4257710221 P.03/06 WHEREAS, the above named owners are desirous of imposing a restrictive covenant upon said premises In compliance with Section 19.00.040 of the Edmonds Community Development Code. VVFIrNESSETH, that for and in consideration of the promises, the above named owners do hereby declare and grant to the City of Edmonds as Grantee the foilowing restrictive covenant, to -wit: That at the time of the execution of this Covenant the Grantors have agreed to the Ordinance of the City of Edmonds provide that no building for multiple familY housing may be erected on subject property containing more than 3X— ofts. Said Covenant shall be binding upon all present and future owners of said real estate and their heirs, successors and assigns. DATED this dayof GRANTOR d�TOR State of Washington County of 5WHOM 15H I certify that I know or have satisfactory evidence that P001" &MCKA signed this instrument, an oath stated th,�t he/she was authorized to execute the instrumerA aqd acknowledged it as the rkt�bl DCJJT- (title) of -��_IateL CM� W, INX - — (name of party on behalf on whom instrument was executed) to be the free and voluntary act of such party for the usesInd purposes mentions in this instrument. Subscribed and sworn to before me this --2�V day of �P'0�4 - .4T UW z A — A /) — ELF= -11 44 %iNotarY Public in and Mir the State OfWashingtOn. 1E;/V it it ion expires ommiss qjq 10:3 0 AUTijoRMED FOR RECORD]Zqr. ofEdmond, BY! 14 vk' Face of \1' -� MICROFILM L:\TEMFWUMU1NGT0RMB1RESTR1CT 0 0 3: M 0 O-C M rn z > 0 -n -n Z3 rn rn 0 M 9 V) rn Z -71 Z z 0 rn FINA_ PROJECT APPROVAL. I oRM TO:- DATE: - MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE - PI -SE SIGN 0,AA � _Q, (�ze, ENGINEERING DIVISION DATE tflzsslol PLANNING DIVISION DATE-. �PROJEC 2- SITE ADDRESS- (.Z-g (0/ PER -NUT A00 _,ADB#______PATE INSPECTED DESCRIPTION OF WORK TO BE INSPECTE A field inspection was conducted to determine compliance with approved plans. Final approval denotes that there, are no objections from the above signed Department to the granting of: Final approval of the described work L,--GgANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED ______yAlLED FINAL INSPECTION - OUTSTANDING ISSUES I 2. MICROFILM 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL ocaprvi.doc.l:tcmp:bldg:forus6/98 z 9 0 M =1 9n M M 0 --1 0 0 0 C M M Z '0­1 z C') 0 -n M rn 0 Fn 0� OM C CD 9 (n Q Z X z z M FIN" PROJECT APPROVAL j,,)RM TO:- DATE: - MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE- INGINEERING DIVISION DATE PLANNING DIVISION DATE- noO PROJEC -7 9 1 z- 41, -Vq SITE ADDRESS PERMIT _2,22j EQ.-_ADB#-------DATE INSPECTED DESCRIPTION OF WORK TO BE INSPECTED H Fin I al A field inspection was conducted to determine final comP ance with approved plans. a approv e above signed Department to the release of denotes that there are no objections from th PERFO CE BONDS and the granting of: V---�GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITTI CONDITIONS NOTED ci Copy of CONDITIONS given to owner/contractor by inspector FAILED FINAL INSPECTION - OUTSTANDING ISSUES u Copy of CORRECTION NOTICE given to owner/contractor by inspector I 2. MICROFILM 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date_ Sign_ ocaprvl.doc.l:temp:bldg:formslO/01 z 9 0 r9 =i 95 M M 0 --10 00 C -4 C = M M z jo C > 0 -n M M 0 0 0 M C: cf) 9 (n M 0 Z � z -q ch z 0 0 M FM-�L PROJECT APPROVAL rORM TO:— DATE: — MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION LF FROM: IRE DEPARTMENT DATE PLANNING DIVISION DATE— PROJEC S Z SITE ADDRESS PERMIT# ADB#______—DATE INSPECTED < DESCRIPTION OF WORK TO BE INSPECTED A field inspection was conducted to determine final compliance with approved plans. Final approval denotes that, there are no objections from the above signed Department to th e release of PERFORMANCE BONDS and the granting of: GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED u Copy of CONDITIONS given to owner/contractor by inspector 1. FAILED FINAL INSPECTION - OUTSTANDING ISSUES u Copy of CORRECTION NOTICE given to owner/contractor by inspector 1. 2. M�Wl 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date_ Sign_— ocaprvl.doc.l:temp:bldg:fomislO/01 z C M rn 0 __10 00 C X M M z 10­1 C 0 -n n M M a 0 0 M C (n 9 Cn M 0 Z z --i z 0 0 M