20000977.pdfJPERMIT
EXPIRES
USEE
PERMIT
CITY OF EDMONDS ZONE
5
NUMBER
CONSTRUCTION PERMIT APPLICATION JOB
ADDRESS
0 Lg
A IN
LOT
�T ;M�JSUMN NO
I
S
-1-MIOLING
ADDRESS
PUBLIC RIGHT OF WAY PE OPFICIAL�JATMAP
EXISTING — PROP.E'01��
0
A
�,_ V 101.
RX""N
==-ir-3 ,
ZIP TELEPHONE
?go2 2,
"IT� S E
NO, OF FIXTURES
UIRID
PFWREQA
f I
_ 0
YES 00 NO 0
ACDRESS
IZ_
II.AAKE
E
OWNEWCONLRACI�01`t RESPONSIBLE 1011 EROSION CONTROIJDRAINAG�E
ENGINEERING .. 7 .......
L"Le ?/z, -
... BE
P, 6, &v,
FIRE REVIEWED By DATE
zi
TELEPHONE
q,
i
VARIANCE OR CU
—
$HOIELIIII OR AD"
INSP
R
0 YE!
—
jfATE LICENSE NUMBER AT�
SERA REVIEW
COMPLETE I EXEMPT
4
SIGN AREA
ALLOWED PROPOSED
'HEIGHT
ALLOWED PROPOSED
/4f*
ROPERTY TAX OUNT PARCEL NO.
'TIAL
NEW
PLUMBtNGiMECH
14
LOT COVERAGE
ALLOWED PROPOSED
REQUIRED SETBACKS (FT.)
FR��NT,
R7
PROPOSED SETBACK$ (FT.]
FRON UR SIDE REAR
0 MPLIANC OR
91
I
-1 /,,,,
0 ADDITION
COMMERCIAL
0
o COHANGE OF USE
PAR
ING
LG AREA
118 DATE
(3 REMODEL
0 APARTMENT
-!ga
0 SIGN
REQ'G
PROVID ED
, -2J -04
REMARKS
CY.E 0 PENCE
C] REPAIR 56 X FT)
r] DEMOLISH
0 TANK
G G'
lARP.AT C] RETAKINING WALL RENEWAL
A , E
(TYPE OF SINESSOR ACTIVITY) EXPLAIN:
11-7 L
A
CHICKEDBY
JTYPEO�C��I�,��,lll Z
DWELLING
UNIT.
DONE
PLA CHE K NO: ov— VESTED DA79)Z
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED, THIS PERMIT COVERS 'OAK To
BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC
DOMAIN (CLASS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE
SEPARATE PERMISSION.
PERMIT APPLICATION: 160 DAYS
PERMIT LIMIT. 1 YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS
SEE BACK OF PINK PERMIT FOR MORE INFORMATION
0 'APPLICANT. ON BEHALF 0 HIS OR HER SPOUSE. HEIRS. ASSIGNS AND SUCCESORS
DEMNIFY. DEFEND AND HOLD HARMLESS THE CITY OF
IN INTEREST. AGREES TO I
M EDMONDS. WASHINGTON, ITS OFFICIALS. EMPLOYEES� AND AGENTS FROM ANY AND
ALLCLAIMS FOR DAMAGESOF WHATEVER NATURE. ARISING DIRECTLYOR INDIRECTLY
x FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE
DEEMED To MODIFY, WAIVE OR REDUCE ANY REQUIREMENTOF ANYCITY ORDINANCE
NOR LIMIT;N ANY WAY THE CITTS ABILITY TO ENFORCE ANY ORDINANCE PROVISION
SPECIAL INSPECTOR AREA
REQUIRED 0 YES lsrm�
OCCUPANT
L(Gt, CAD
IM. 17,0
REMARKS
ROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION REQ'D 3�
TlCcr. clf&I,,FT It 5Eqto
ItenAl
fi-r*j
VALUATION
FEE
PLAN CHECK FEE
BUILDING
PLUMBING
MECHANICAL
GRADINGIFILL
STATE SURCHARGE
ENS, REVIEW FEES
ENG, INSPECTION F E
PLAN CHECK DEPOSIT
ECEIPT
TOTAL AMOUNT DUE
BE IPT
I HERESY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATIUN, THAT THE INFORMATION
GIVEN IS CORRECT; AND THAT I A. THE OWNER, OR T 0 V AUTHORIZED AGENT OF
APPLICATION A �PRO L
IS WHE. IA.FEET....PLY IT ETA LAWS A GUILATING CONSTRUC-
ATYE.0 N WILL BE EMPLOYED
CALL
D -d
E PERSE
T' .IN. THE W. 0
TICIN?AN. IIV I,. AXHG��,;I�Tyl)ATIHEA
OF THE STATE OF WASHINGTON RELATING TO
FOR INSPECTION
�z
_111 wl.
IN VIOLATION OF THE LABOR CODE
WORKMEN'S COMPENSATION INSURANCE AND RCW 16.27
OF DIALS SIGNATU DATE
SIGNA RE _�AG
DATE SIGNO
(425)
1 - - ,
771-0220
E ASEDBY
EXT 333
TTfENTION
UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL
771-0221
IT IS
INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI�
ORIGINAL - FILE - YEL
A FINAL
HAS BEEN GRANTED� UBC SECTION 109
FAX
PINK . OWNER - GOLD ASSESSY
CATE OF OCCUPANCY
5198
z
0
OX
c m
m 0
0
80
a
On T
0-1
c z
co
om
n
m m
o
Ous
o Fn t
M 0
z
z
0
0
m
tow&,
'Jill
May 15 2001
Tricia Bennon
M�-
plans Examiner
city ofEdmonds
RE: Revisions to Permit: #200977
r.W
Project Address: 9203 Park Rd.
Establish Datum Point
01;
"0
Tricia,
This letter is to confirm the datum point for the proi ect at 9203 Park Road.
The datum point has been established atop the electrical transformer that is located 5'6"
from the West property line oftot 5 and 77' from the North property line ofLot 5.
Based on the surveyed topography the datum point elevation has be en calculated
-�MW
to be at 356.4 using a transit instrument from a monument point (#4061) establishbol-'at;
Park Road. The electrical transformer is a permanent structure installed by Snohomisibr.
n
County PUD.
Oj
A
Thwk you,
Bill Lihudis
Lihudis Properties Inc.
BOWDOINWOOD
CITY OF EDMONDS
SNOHOMISH COUNTY, WASHINGTON
S.OLSON
SCALE I I"= 50'
M-LAURENCE
771 1
. ! LJ I HEYDON/ KAPP
Y
N
of,
6
ei
0 9799
0)
T. 27 N
PARK
4 ta
14630
4. 19 O.TRAYLOR
30
n
ul
W, Woo
V3
N'S F—.5 0 4 F—Iw
CL
AM6RT
16434
ZO'
0+00
0
x
C\j
0')
3
6001
10
0
40
Nos-05,2
cl
106.32
ui
.,L 1' 0 ivs
z Z
Boas
2
w
>
e
10
so'. - 00 20'
W (P& —,Qo A:
4r)
o0
P o/ N
tp
1 0
0�
C-SNAi"
Otis
45
DESCRIPTION
IS PLAT IS A REPLAT OF A POR I ION OF LOT 10, BLOCK 5,
ALDER ()QD MANOR NO. 9 DESCRIBED AS FOLLOWS'
BEGINNING AT THE NORTHEAST CORNER OF LOT 10; THENCE SOUTH
0*39'17"WEST A DISTANCE OF 464.46 FEET TO THE SOUTHEAST CORNER OF
LOT 10; THENCE NORTH 73'06' td'WEST A DISTANCE OF 234.66 FE�T; THENCE
NORTH A DISTANCE OF 120.87; THENCE SOUTH 88* 50'3f" EAST A DISTANCE OF
100.00 rEtT; THENCE NORTH A DISTANCE OF 280.00 FEET; THENCE SOUTH
86- 50'31" EAST A DISTANCE OF 129.89 FEET TO THE POINT OF BEGINNING.
COVENANT
OWNERS, AND AL
SUBSEQUENT OW
THE SUCCESSOR',
.PARTIES HAVING
THE CITY OF EDI�
RESPECTS FROM�
FOR INJUNCTIVE,
NOW OR IN THE
mENTS BY REAS�,�
AND MAINTENANI�1,11,
WAIVE AND RELE1.
ALL CLAIMS FGR
SOLELY BY AN A�l�
lIVE RELIEF WH�,;;,,
OR ASSIGNS, MAI�
BY REASON OF T
OPERATION OF S,i:,",
TREASURE�,
I KIRKE SIEVE
WASHINGTON, 00 H
THE WITHIN DESCR
PAID UP TO AND 11
COUNTY TREo
RECORDINC
FILED FOR REC
-_ .--- AT __
0 , 19
PAGES —AND ---.
SNOHOMISH COUNTY AL
I I " to F7. I /,d KI r
Go e 0- REC IVED
post Office Box 2385
KWand, WA 98083 OCT
TeL. 425,827.1084
Fax, 42S.828.9443 PERMIT COUNTER
Lilludis Properties Inc. Job Number 20076
October 6. 2000
P.o. Box 82602
ycnmore, WA 98208
subject: Geotechnical Engineering Report
Lot 6 - Edmonds Short Plat #P-92-147
Dear Mr, I.Ahudis:
We are pleased to present our Geotechnical Engineering Report for yew
proposed new single-family residence to be constructed on the vacant Lot
No 6 short Plat #P-92-147 in Edmonds Washington. The purposes
* of subsurface soil and
of our work were to professionally evaluate
groundwater conditions, recommend general procedures for the grading
and underslab treatment in the building area, and provide foundation
recommendations. The scope of our services included:
1) Logging and sampling one test pit excavated to a depth of six
feet below existing grades.
e with our understanding
2) Preparation of this report in accordanc
Mject requirements and generally recognized local
geotechnical engineering practices, No other warranty is
expressed or implied. Plate 1, attached, provides the guidelines
in the use and application of this report.
ct Under=dings:
7his office was not provided with a complete set of plans for this project,
We
however we were provided with a reduced copy of a Site Plan.
anticipate the new structure will wood frame and have multiple stories,
with a basement. The lower floor for the basement win be about 2 feet
above existing grades.
Maximum cuts on the order of three fact are
anticipated. If the project differs significantly from our understandings,
please contact this office for supplemental recoeunendations.
,a/0612000 13.04 4255289443 11AVE A GIMAT DAY PAGE 03
Job Numb
LOT 6 SHORT PLAT #P-92-147 er20076
October 6, 2000 Page 2
GenerAl Site Condiflons, - Surfage:
The proposed new structure will be constructed on the vacant parcel
known as Lot 6 of Short Plat #P-92-147 in Edmonds, Washington. The
attached Vicinity Map, Plate 2, shows the general vicinity of the site,
0.
At the time of our fieldwork, the proposed building area was covered with
brush and a few trees. The proposed building area had a slight to
moderate slope generally to the north and northeast,
one test pit was excavated with a backhoe to a maximum depth of SiX
feet below existing grades at the approximate location shown on the Site
0:
-4 &
0 C;
'y the undersigned
Plan, Plate 3. The test pit was logged and sampled b
engineer during excavation. The lop are attached to this report. Field
M W''
Z
i
p
density interpretations are summarized on ft test pit log. Although
there miky very well be some variation in the subsurface and/or
> Z!
1
conditions may not be readily apparent from the ground surface, we
Onf
expect the following subsurface interprets tion will be essentially correct*
-Mn
Our field tests revealed a eurficial layer of loose sandy soil over the
M M111
building site. This loose soil was 3.5 feet deep at the test pit
0 ra�
Or-:
location. Underlying the loose surficial soil is a dense gravelly
sand with variable amounts of the sat and cobbles, Standing
CW
groundwater wasnot noted in the test pit during excavation -
The final test log attached to this report present our interpretation of the
field data. The stratification lines on the log represent approximate
Z'
boundaries between soi I types at the exploration location. In actualit3r.
the transition may be gradual. The relative de neities and moisture
descriptions on the log are interpretive descriptions based on observed
M
Z'
conditions during excavation. The Ic g should be reviewed for specific
subsurface information at the location tested.
M
LOT 6 - SHORVPLAT#P-92-147
October 6, 2000
Job Number 20076
Page 3
Conclusions and ReOMMIRMUM
The following general geotechnical conclusions can be drawn from our
field and laboratory test data:
1) The surficial loose soils am not suitable for foundation support,
2) Footings must extend to the den- gravelly sand.
Reinforcementwith a minimum of 1. 5 feet of densely compacted
two to four -inch quam spall r0A may be required. Footings
may be designed for a bearing pressure of-.2,000 pounds per
square foot (pef)
3) The trench for any spalls must extend out beyond the footing
edges a minimum distance of one half the spall depth.
4) we recommend footing drains around all underground -all&
Positive drainage to an appropriate drainage structure is
waterproofing is required for all underground
recommended.
walls. As a minimum, Subalab Plastic sheeting is also
recommended.
5) In our opinion if the site is developed in accordance with this
report, the site will remain stable.
new structure may be supported on conventional
The proposed
continuous and spread footings bearing, on competent dense gravelly
a minimum of 1.5 feet of
sand which may require reinforcement with
All otin
densely compacted quaM spalls placed, stop the native. fo 9%
should bear at a minimum depth of 1.5 feet below e)dsting gmdea.. A
bearing pressure of two thousand (2,000) pof may be assumed for
footings bearing as specified above. The design bearing pressure may be
increased by one-third to accommodate short term wind and seistnic
shear failure, we recommend
loads. To provide -protection against Ixtee
continuous and spread footings have minimum Widths of 6 n (16)
inches and twenty-four (24) inches, respectively.
I
LOT 6 - SHORT PLAT *P-92-147 Job Number 20076
October 6, 2000 Page 4
will settle
We estimate that footings bearing as recommended
approximately one-half (1/2) inch between building corners or for every
fol�y feet of continuous footing distance.
Lateral loads such as wind and seismic forces are accommodated by
friction between the foundation elements and the hearing so"s and by
passive earth pressure against the foundations. However, passive earth
pressure is only available if compacted structural fill is used to backfill
against the foundations, or the foundations we Poured against the
existing soil, The passive resistance of undisturbed native soil and
properly compacted structural fin may be assumed to be an equivalent
fluid pressure of three hundred (300) pounds per cubic foot (PCA.
D_
The Site is classified as Seismic Zone 3 by the Uniform Building Code.
We recommend the designer utilize site soil coefficient SD in their
analysis.
The site should be graded during construction so that surface water is
directed away fro= any excavation. Water should not be allowed to pond
where foundations, pavements, or slabs are to be constructed. Final site
grades adjacent to the building should be sloped away from the structure
for a minimum distance of ten feet. Roof and surface water drains
should discharge to an appropriate facility,
rooting drains are required around basement walls and should consist Of
a slotted four-inch-d . iameter PVC pipe bedded in, and covered with a
minimum of six inches of drain rock. The invert of the pipe should be
placed at the elevation of the footings. A non -woven geotcxdlc fabric
(Mirafi 140N, Supac 4NP, or other equivalent) should be v� rapped around
the outside of the drain rock. The p%rC pipe should be sloped to drain,
and may be connected to the roof and surface water discharge Pipe
down -gradient and away from the structure. The pipes should discharge
to an appropriate discharge facility.
L
10/0612000 13:04 4258299443 PAVE A WID-A I VAY
LOT 6. SHORT PLAT OF-92-247 job Number 20076
Wober 6, 2000 Page 5
_ft,,,WULWA§loRes.
Temporary and permanent excavation and slopes for this project must
meet an applicable government safety regulations. Temporary cuts to &
depth of four feet may be attempted vertical. although thev will most
probably not hold. Excavation slopes greater than four feet in depth
should be cut no steeper than 1:1 (Norizontal:Vertical) for the entire
depth of the excavation. Flatter slopes may be required depending upon
local variations in soils conditions. If there is groundwater present,
flatter slopes should be anticipated, Contractors worldng in excavations
should use caution at all times, sudden caving of the side slope$ is
possible.
permanent cut and J*dJ slopes which are not otherwise reinforced should
not exceed 2-1 (HV). We can provide slope reinforcement desi . gn
guidelines, if necessary.
pquDd �11.taln' �W'
Foundation and retaining walls must be designed to support the lateral
earth pressures which abutting ,oil. win impose. The Mowing
recommendationO are for walls which are less than twelve feet high that
support level bacIXIll'
Active Earth Pressure ......... ............. 35 Pcf
passive Earth Pressure ......... ......... 300 Pcf
Unit Weight of Soil .......................... 125 Pcf
coefficient of Friction ........ I ... I ..... — .... 0.35
The Active Earth pressure recommended above assumes the wall can
deflect at least 0.002 times the well heighL if this assumPtiOr' is
incorrect, OL uniform lateral pressure Of one hundred psf should be added
to the wall pressure given above,
ded above are ultimste valuer
, and should be
The values recommen recommend a
reduced by an appropriate safety factor. As a guideline,,we
5 for overturning and sliding- The
minimum Factor of Safety Of 1-! an
resultant force from the soil (neglecting the Passive Pressure force) c
becalculated by taking moments about the tGe of the wall. The resultant
force should pass through the middle third of the footing-
Z
O�
4'.
0
M
am
C a
M 0
M
'o
C
01n,
n
M M
a
0
0
C:
z
0
M
4268289443 HAVE A UkAl VAY eAl= Of
LOT 6 - SHORT PLAT OP-92-14 7 Job Number 20076
October 6, 2000 Page 6
The above design values do not include hydrostatic pressures behind the
walls and assume that no surcharge slopes or loads (such as traffic) are
placed above, or near the walls, Design values can also be exceeded if
heavy construction equipment is allowed within ten feet of the wall. if
any of these conditions exist, then the above design values should be
augmented be appropriate additional pressures- if walls higher than
twelve feet are required for this project, please contact our office for
additional reconuriendations.
Foundation walls should be heaviLy waterproofed, and then backfilled
with a clean, compacted, free -draining granular soil or an approved
drainage composite. This will prevent 'the buildup of hydrostAtic
pressures. The wall backfill should contain no more than five percent
gilt and clay, no organics, and no cobbles greater than four inches in
diameter, The percentage of sand (from the #4 sieve to the #200 sieve)
should range from 25% to 75%. During compaction of the wan backfill,
cam should be taken to not damage the wall. The top one to two feet Of
wan back0 should consist of a relatively impermeable soil or topsoil.
.site construction should begin by stripping and clearing the Property of
all vegetation. organic -rich topsoil, and any other deleterious Material -
Stripped materials may have to be removed from the site. Groundwater
seepage was not noted during our fieldwork. Nevertheless, the
contractor should anticipate and be prepared to accommodate moderate
to heavy seepage into even shallow excavations.
Structural fill is defined as any rill placed below structure, including
slabs, where the fill soils would need to support loads without
unacceptable deflections or shearing. Structural rill should be placed
above =Yielding native site soils in maximum eight -inch -thick loose lifts
and compacted to a minimum Of 95% of Modified Proctor (ASTM D1557).
soil is typically difficult to place and compar
,t as structural rill if more
than three percent from the optimum moisture content at the time of
compaction. During wet weather or under wet conditions, structural fill
should consist of a granular soil having less than five percent silt or clay
(measured on that portion which passes the %-inch sieve). During dry
weather, water may have to be added to the soil to achieve the required
soil density.
Z
0
0
4 "n
C a,
i 1� R
M
tQ
-40,
0
M
10
C Z
>
C :0
-n
rn ML
0
:z
-4
Z
W
K
0-
4
0
rn�
FAVL A tNXtAl UAY
13:04 4258289443
LOT 6 - SHORT PLAT #P-92-147 job Number 20076
October 6, 2000 Page 7
This site has moderate erosion potential. Typical erosion control
measures such as filter fabric fences, strew on exposed ground, and hey
bales at critical iocations is appropriate for this site.
Net W er Con �cliow-
..VA�
If the site is developed during -tended periods of wet weather or In the
winter, the following are anticipated additional costs and changes which
should be anticipated:
1) Excavated slopes and fill piles will have to be protected with
plastic. ctural
2) The excavated soils will be more difficult to utilize as 8tru
flu.
3) The entire excavation may require some over -excavation (on the
order of one foot), and replacement with crushed rock.
4) Numerous site visits will be required by this office to evaluate
soil conditions, confer with the contractor, and make remedial
recommendations.
5) Costs of maintaining the site and cleaning adjacent
street$/property will increase.
CIO
It is recommended we be retained to review the final plans to verifY site
specific subsurface requirements are met and our recoMMm"liOns have
been accurately interpreted in the plans.
it is also recommended that we be retained to Provide Professional
geotechnical consultation and observation aervice$ during design and
construction, This allows us to: 1) ConfIrm, that design conforms to
specific subsurface requirements; 2) Confirm that subsurface soils
conditions exposed during construction are consistent with those
indicated by this report; 3) Evaluate whether earthwork and foundation
construction activities conform to the intent of the contract specifications
and plans; and, 4) Provide recommendations for design changes in the
event of changed conditions. While on the site during construction, —
will not direct or supervise the contractor or work, now Will we be
responsible for providing on -site safety or dimensional measurements
during construction activities -