20010804.pdfD�TERECEIVED
[PERMIT
EXPIRES
L
CITY OF EDMONDS
USE E
ZONE UR T
45 Le, PN "IMBIE R
CONSTRUCTION PERMIT APPLICATION
Ao�BRESS SUITE/APT#
;�i I q Ne 6.
—
PI -AT NAMEISUBDIVIIIO� 10.
LOT NO.,�
L5 �o_ 96
1
LID FEE $
jplNGAD.FESS
Rc 2--714t3
PUBLIC RIGHT OF WAY PER OFFICIAL
STREET MAP
0- .0
L�, 6
= I- R
CITY ZP
qt�)
TELEPHONE
2a, -7) 4-- t, 1,6 9;
EMSTING PROPOSED
REQUIRED DEDICATION de IT 42
hfi�ah NW
METER SIZE
4
111
5
RV SOUR C,
Y x NO 0
S
I
I: ADDRESS AVe
IM1,5 14_7 qI �JF &I loo
R MARKS
OWNERICONTRACTOR RESPONSIBLE FOR EROSION CONTROUDRAll-G.
CITY 11P
_ITELIPIIN
yl I qwl
Lr,-44�5-4-lo
vwRw _9zl alce 9) _li�elf 411�1,- 4*20el
5'. p
ADDRESS
El
Pb BA 12 -1146
FIRE REVIEWED BY DATE
qezlp
TELEPHONE
6
STATE LICENSE NUMBER
Co
A17A CU
[
SH07 OR ADS.
INSPECTION
RE
YESQZN.
BOND
J'NG
MR-Ri-x- alto (2-
Be. REVIEW
S�.N AREA
HEIGHT
PROPXq;o TPAZRC;EL4NO
4FA
A
COMPLETE I 11�71`T
�p
ALL.W,��RGP.SE.
ALLOWED I PRO GEED
[13�. SMENIIAL
E--
LOT COVERAGE
ALLOWED
REQUIRED SETS
PROPOS D SETBACKS (FT)
F11j, Ull&1EA.1
ADDITION
E] COMMERCIAL
ci C MPLIANCE 08
CHANGE OF USE
PROPOSED
6v% -_107"l
FRONT SIDE
go
10,
PARKING E_ T
C] REMODEL
0 APARTMENT
C] SIGN
Fl§�
PROVIDED
JVZIIO.q�
Iq
Iq/
C] REPAIR FT)
C] TANK C] OTHER
E] RETAINING WALL RENEWAL
-w— ROCKERY
EXPLAIN
ECKE.Sl ITYPEOFCONSTAUCTION
'C U
0 C
Can- Fou""p,-,
NUMBER
OF
NUM ER OF
DWELLING
UNITS JA
C"TCA
NREA.
U..Ea
SPECIAL INSPECTOR
RE QUIRED
JAREA OCCUPANT/
LOAD 10
0 STORIES
DESCRIBE WORK TO BE
DONE
0 YES
Ind
EMARKS
PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION REO'D iE
01
(o
4
A
PLAN FEE
L
WNW`
U L
BUILDING
&g"CE
7yZWGlq,q
PLAN CHECK NO: IVESTED DATE
rCHECK
LUM I G
PLUMBING
P�_
In
ME; " L
THIS PERMIT AUTHO DES ONLY THE WORK NOTED, TH:S PERMIT COVERS WORK TO
t: BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC
I
90
2 D OMAIN (CURBS.SIDE LKS, DRIVEWAYS. MARQUEES, ETC.) WILL REQUIRE
OR
GRADING"'Ll.
G""L
:I SEPARATE PERMISSION.
STATE SURCHARGE
�E MIT APPLICATION: 180 DAYS
PERMIT LIMIT. I YEAR - PROVIO D WORK IS STARTED WITHIN 18D DAYS
ENG. REVIEW FEE
SEE BACK OF PINK PERMIT FOR MORE INFORMATION
'A P ICANT. ON BEHALF OF HIS OR HER SPOUSE� HEIRS. ASSIGNS AND SUCCESDRS
P L
ENG. INSPECTION FEE
IN INTEREST, AGREES TO INDEMNIFY. DEFEND AND HOLD HARMLESS THE CITY OF
LANDSCAP NO
2 EDMONDS� ASHINGTON. ITS OFFICIALS. EMPLOYEES, AND AGENTS FROM ANYAND
ALLC�IMS FOR DAMAGES OF WHATEVER NATURE. ARISING DIRECTLY OR IND AECTLY
INSPECTIONFEE
B
11 FROM THE ISSUANCE OF THIS PERMIT, ISSUANCE OF THIS PERMIT SHALL NOT E
DEEMEDTOMDDIFY. WAIVEOR REDUCE ANY REOUIREMENT OF ANY CITY ORDINANCE
PLAN CHECK DEPOSIT
IRECEIPT
15AD
NOR LIMIT INANYWAYTHE CITY'S ABILITYTO ENFORCE ANYORDINANCE PROVISION,'
CEIPT
TOTAL AMOUNT DUE
IF, .60 1
I HEREBY ACKNOWLEDGE THATI HAVE READ THIS APPLICATION. THAT THE INFORMATION
APPLICATION APPROVAL
GIVEN 19 CDR ECT. AND THA I AM THE OWNER. OR THE DULY AUTHORIZED AGENT OF
THE OW ER GREE TO COMP Y WITH CITY AND STATE LAWS REGULATING CONSTRUC
CALL
T IPP1,111,11.1 1 . t �lpld by
TION A IN ING THE WORK AUTHORIZED THEREBY. NO PERSON WILL BE EMP DYED
I N V16 10 OF THE LABOR CODE OF THE STATE OF WASHINGTON RE LAYING TO
I
S�.Ig DIL-I D11 F - , l
FOR INSPECTION
V WORK NS OMF�NSA�IONI INSURANCE AND RCW 18 27,
OFF/�I�LsIlINAIII&, DAY
sl:14.ow DATE S DIED
(425)
7T " " � -/&,ol
771-0220
i a
i 4
I
Wrmv P,04
EXT 1333
PFLCASEDr DATE
IT IS UNLAWFUL TOI
"", 1 -0221
191
/R
A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTI Fl-
ORISINAL 111-0 YELLOW - 1112E�.
CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109
FAX
PINK OWNER GOLD -ASSESSOR
z
0
4 J
0
0 M
M
0
0
M M
10
E:
O"n
n
M M
0
0
In Fn
C 0)
(a
0
z
ca
z
0
M
'NOTIC& I# ITIE 'DOCUMENT INTHIS FRAME
IS EtSCILEWTHAN THIS NOTICE
IT IS DUE TO THE QUALITYOF THE DOCUMENT
pamolle jenaoe
-sag4a > 22.vgz
P 0, v L, XE
AJOD A113 31W11,3LI
apzjBBplq*BAE-SZ9*ZSZ< =VJS-OW�
T;,,;V;03 �O ki:o
3 :7 73 A1,20 Lt -dK'e A lilb -L"141
z5z
7—
'M N
>IVM
o-q
1 1, .,
> z GG,!GZ: �GVIG 1H
i 0-1 -17
Gz:,igz: :,a:Gc;,-jn 0
lo
>
41 <
@ �p
----- -----
lu
N
30
m 00 — — — — — — — — — — — — — — — — — — — — --- — — — —
a Al2-1-1v
H3H10
gals
SNOUJ
:S)lov819s ea xew 8'8L :111:1 WWI
aildea xew BW ano iem
3NOZ S31V:) ONIOV80
NL Q=G u
00*ESZ :3
os zsz :EI
sz*zsz :v
SNOIIVA313 30V8VO
pamolle jen3pe
S719*UZ > 28'siz
pamollv,34 xew - SzV9a
I!Wll *3q sz+
GPeJB BPjq 'BAB -,SZ9'ZSZ =1?/S*VW�
os*�Sz :cj
Sz . zsz ::)
OS'OSZ :8
SZ'OSZ :v
SNOIIVA313 -3snOH
vm "00 LISIWOLIOUS
IdSHV� 201
N011d1SDS3(3 IV031
zzzz :IE201
zos :L13J0d18A1JQ
OZV� :a6p-jeo/asnoH
GBSOdOdd
%C22 TON 101/ea-1V PA03
zzzz :eaiv PAO:)
SeS9 :eaiv 301
SOW) 3OVd3AO:) 101
I,6Z86 VM'4S1w0140US
S6L XOS Od
Ja30A essilaw/moaal alinr
10VIN03
SZL86 VM'8133M
SKLE X08 Od
uol:prL4suo:) joBuejo d:)
�3NMO
F FEB 2 3 2001
E ' 23 21
4
pLANNING DEPT.
DEAN HOUGH & ASSOCIATES
8918 11th St NE RECEIVED
Everett WA 98205-1407 Z 6 001
Phone & Fax: 426-335-0262 FEB 16 2001
EWINEERING DIVISIO,
.......................................... I .................. ............................
JNF611MATION REPORT
TECHNICAL
for City of Edmonds. ShortPlat
tit 91
1 Moie;st
.......... .................................................. ........................................................
For Mr Donald Fiene
Assis . tant City.Engineer
city:Engineering DfiWalon
City of Edmondsi WA
owner. C P Granger construction. Inc.
Prepared by Ho
Dean M Hough, PE
Consulting Engineer
Lr February 23, 2001
FFAMM 4151
1
71
M
C
C�2' J.�
k
0 "
M
.1,16fr6ductio'n to F�eport
47-
This T. 1. FL is submitted along with the three construction plans for the City of
Edmonds 2 lot short plat # S-2000-96 addressed as 911 Maple St for C P
Granger Construction, Inc. and is to comply with City of Edmonds Engineering
Division requirements found in the Citys Planning Planning Division Findings.
Conclusions and Decision dated January 9, 2001. The submittal is also to
comply with the Edmonds Community Development Code(ECDC) and the
D.O.E. Surface Water Design Manual requirements.
Part I The Project Proposal
This short plat will clear all impervious surface - the two e)dsting houses,
a garage and concrete slabs to provide two homes and new sidewalk along'the
Maple St frontage. AJso the alley access at 9th Av S will be widened from 11'
to about 14'to provide better access. A portion of an e)dsting retaining wall on
the north side of the entrance at 9th Av is slightly into the 15'wide right-of-way
which reduces the entrance somewhat.
New water and sewer services will be installed to replace the old
services and the old sewer service line capped. The e)dsting fire hydrant on
the southeast comer of Maple and 9th is at a ma)dmum distance of 250'to the
front of the farthest house and is adequate in distance. A large detention pipe
will be installed on the south side of the site along Maple St to Pickup all
on -site roofs and pavement to prevent concentrated flows from leaving the site
and damaging adjacent properties. These storm flows will be dammed up in
the detention pipe and released at the release rate that occurred before
development. See Part III on the detention system safety factors.
part 11 Offelte Drainage Analysis
A general offs1te analysis was done in the field on February 21, 2001 to
determine the direction of flow from the site and the distance from site to
stream -if it joins a stream.
Each manhole cover was popped from the crossing of 9th Av S at Shell
Creek going south to the site on the basis that flaw comes to the creek and
looking for any diversion from this trajectory. Accoroing to the USGS Quad an
1
C
M
00
C'
'M
?S rn,
C
M_
approximate cover over the creek is 55' to 70' and 9th Av going south rises to
Main St, dips about 4'going south to Dayton and rises another 30'to the site.
At a CB manWe on the southeast comer of Bell St a number of green
painted arrows on the pavement have been set by others to indicate the
direction of storm flow. The removed manhole cover at the southeast comer of
9th and Edmonds shows flow turning to go northwest. Because of this it is
believed that the 18!'CP storm trunk goes northwest and then north through a
backyard to Shell creek. The trunkline is believed to go south from the creek
up to Edmonds, then through this backyard on the west side of 9th into Bell
Street on the east side of 9th Av. From the Bell St right-of-way it turns
southeast to the east side of 9th Av and then due south along the east side of
9th Av to the site and on south.
At Maple St. a dead end CB(typel) picks up all the drainage coming a
block and a half west to this CB and into an 8"CP which joins directly into the
subject storm trunk without a manhole to maintain the junction. There was no
indication of a manhole cover in the pavement at this location. There has been
some rain over the last week, about 0.25" and the drain was filled to about 10%
of capacity. All along the trunk no diversions were found and so to conclude,
all drainage from about the 220th St Snohomish County grid north to the site
and east from 9th Av for about 2 blocks drains into this system, an area of -
about 50 acres. Because a number af intersecting easttwest streets intercept
flows like Maple St, the site is protected from large sheet flows. Approximately
a half acre sheet flows onto the site from the southeast to the northwest comer
at the alley(Maple Way) . No streams or swales are found on site and the site
slopes from southeast comer to the northwest comer at about a 5% slope.
This proposal will provide a storm drain/detention system for the two
now houses and pick up 80% of the sites area and drain into the proposed
detention system before it is released at the existing or less release rate at the
southwest comer of the site at a type 1 CB which goes due west to the above
noted storm trunk and then north to Shell Creek in more than 1200' or a quarter
mile. The maximum onsite concentrated flow of 0.17cfs will be released at the
existing rate of 0.10 ds over a longer period of time. See Appendix A, page 1.
Part III Short plat Detention design Calculations
impervious Area Calculations:
A calculation of the actual impervious surfaces for both existing and
developed conditions to determine the 2, 10 and 100 year -24 hr storm
2
4-
Z'
0
M
M
rl 8�
0 — 0
C-
z
Mi.
z
rn
hydrographs is shown in the Hydrograph Input Table in the Appendix B, pagel.
Existing conditions:
Page 2 of Appendix B shows the City ordinance requirement for the
existing conditions curve number, that is to make all impervious surface for
redevelopment - in this case all impervious surface is to be removed - as
Meadows or Second growth forest Here the pervious area is really more like
meadows; therefore, the Cn is 85 as used. A lot of the impervious areas of the
houses and driveways mere determined by Autocad. Also on this table the
slope and data for time of flow is shown for existing conditions and calculated
by Lotus 1-2-3 spreadsheet. The curve number of Cn of 98 and 85
respectively are for impervious and meadows. After development the Cn rises
to 90 for 50 to 75% grass on this type C soil.
The Appendix B, page I table shows that the difference between the old
imp6rvious surface and the now is only 603 sf. Whereas in the existing
conditions the impervious surface ran off into the existing grass and was most
likely infiltrated; the new requirements requires this detention system to collect
the concentrated water and detain it and release at a lower rate to the storm
drain system; namely at the existing release rate if the sight ms totally
meadows. This creates a safety factor of almost 3 since even a 100 year storm
year storm on the additional impervious surface amounts to 603 SF at 3" of
rain in 24 hours requiring a volume of 150 cu ft. The implied condition of going
meadows to 4946 sf of impervious surface requires a detention volume of 396
cu ft - see page 6 of Appendix A
For the existing condition of meadows the longest route that water
travels on site and the longest time water travels is from the southeast comer
of site to the middle of the west property line which fronts on 9th Av; going as
sheet flow for 142.8 feet at 5.32% slope. The actual flow time as shown on
page 1 of Appendix A is 28 minutes which is reasonable for 143 feet of sheet
flow to cross the site. The Waterworks software determines the various peak
storms on site by creating six hydrographs - See page I of Appendix A. The
Waterworks calculations shows that the maximum peak increase from this site
in storm flow to be about 0.07 ds for the 100 year-24 hour between Basin
B1 00dev and BI 00ex which is not much flow increase.
DeveloDed Conditions.
The minimum standard time of 10 minutes time was used for
concentration of flow from the developed site since the project site will have a
more impervious area and developed flows will be concentrating much faster
3
L-1-11
p
52 M
of,
AM
0
0 rn,
Z
than in the.e)dsting conditions. With the minimum time the hydrograph for the
developed conditions is ma)dmum and will provide the greatest possible
difference and amount of storm flow to be detained. This will protect the
e)dsting downstream structures and steam to a much greater degree.
For the calculation of detention DHA used 30' diameter pipe; therefore,
the I Or of 3011 diameter pipe provides 490 cu. ft. This length is sufficient to
provide the 396 ft required to store the 2, 10 and 100 year storms and is showri
on page 6 of Appendixk
The detention pipe was reduced in length since the manholes create
detention volume which is not calculated in the Waterworks software. The
upstream manhole alone creates J." of vertical storage in the 48" diameter
manholes used. This is approximately T of depth Man both manholes are
used. Asa result 3' of 48" pipe(manhole) is equal to 9' and more of 30" pipe;
so, 91 was taken off 116 lineal feet Of Pipe shown on page 4 of AppendixA to
make the 107' of pipe shown on the construction plan.
4
I.APPENDIQ.ES,
Waterworks Printouts:
A. Detention Design Calculations
B. Hydrograph Input Tables
page 1 -6
page 1, 2
2/20/01 2:2:0 PM Dean Hough & Associates page
CITY OF EDMONDS S/P#�000-62:C P GRANGER
ADDRESS: 911 MAPLE ST
APPENDIX A:DETENTION CALCULATIONS:2-100Y
BASIN SUMMARY
BASIN ID: B100DEV NAME: BASIN B i0o YR-24HR DEV C)OND
SCS METHODOLOGY :t.
TOTAL AREA ....... 0.32 Acres BASEFLOWS: 0 * 00 CES
TYPElA PER�V IMP
RAINFALL TYPE .... A 0.00 Acres
PRECIPITATION .... 3.00 inches APEA..: 0.32 c
TIME INTERVAL .... io.00 min CN ..... 92.87 0.00
TC .... : 10.00 min 0.00 min
ABSTRACTION COEFF: 0.20 0.06 Ac-ft TIME: 500 min
PEAK RATE: 0.17 cfs VOL:
BASIN ID: B100EX NAME: BASIN B 100 YR-24HR EX. COND.
SCS METHODOLOGY
TOTAL AREA ....... 0.32 Acres BASEFLOWS: 0.00 cfs IMP
RAINFALL TYPE .... TYPElA PERV
PRECIPITATION .... 3.00 inches AREA..: 0.32 Acres 0.00 Acres
TIME INTERVAL .... 10.00 min 0; .... 85.00 0-00
TC .... 28.20 min 0.00 min
ABSTRACTION COEFF: 0.20
TcReach - Sheet L: 142.80 ns:0.4000 p2yr: 1.50 s:0.0532
PEAK RATE: 0.io cfs VOL: 0.04 Ac-ft TIME: slo min
- � , 6, DEV COND
BASIN ID: B10DAV NAME: BASIN B 10 YR-24HR
SCS METHODOLOGY
TOTAL AREA ....... 0.32 Acres BASEFLOWS: 0.00 cfs
RAINFALL TYPE .... TYPElA PERV IMP
PRECIPITATION .... 2.00 inches AREA..: 0.32 Acres 0.00 Acres
TIME INTERVAL .... 10.00 min CN .... 92.87 0.00
TC .... io.00 min 0.00 min
ABSTRACTION COEFF: 0.20
PEAK RATE: 0.10 cfs VOL: 0.03 Ac-ft TIME: 500 min
BASIN ID: B10EX NAME: BASIN B 10 YR-24HR EX. COND.
SCS METHODOLOGY
TOTAL AREA ....... 0.32 Acres BASEFLOWS: 0.00 cfs
RAINFALL TYPE .... TYPEIA PERV IMP
PRECIPITATION .... 2.00 inches AREA..: 0.32 Acres 0.00 Acres
TIME INTERVAL .... 10.00 min CN .... 85.00 0.00
TC .... 28.20 min 0.00 min
ABSTRACTION COEFF: 0.20
TcReach - Sheet L: 142.80 ns:0.4000 p2yr: 1.50 s:0.0532
PEAK RATE- 0.04 cfs VOL: 0.02 Ac-ft TIME: 510 min
0/ 6 (0,3
4erej
OK
4-
0
M
-4
0
Z
Fic
0
z/zo/oz z.z.0 pm Dean Hough u Associates n=se z
czrr OF oomomno o/e#2000'62.c e GRANGER
ADm000a. 911 pmpLn or
upeEmozX A:ooromrzom cALcoLATzoaa.2'100Y
` oAorm aommuor
` BASIN zo. B2oEV NAME. BASIN o z Yn'24eo oEV COND
ocy MozHnoouoor... o.sz Acres o�oonu�a. o.o» �ce
TOTAL '---- eEav rmp
RAINFALL TYPE
�. z�eoz�
paucznz�zom��... 1.50 inches AREA..: o.sz Acres 0.00 Acres
' zzmo zmruavu��.... zn.00 n�� cm..... 92.87 0.00
� zc..... 10.00 min o.no min
nBozoArrzom coupn. 0.20
poAo oAro. 0.06 cca VOL: 0.02 oc-ct TIME: suo min
BASIN ID. B2KX NAME. BASIN u nR-u«HR EX. COND. _
' oco mozaonoLoon
TOTAL AuEA........ 0.32 Acres eASoruoWo. 0.00 =c"
RAINFALL rreo..... TYPnIA PEav IMP
pouczmzTATzom..... 1.50 inches AREA... o.»a Acres 0.00 Acres
rz�x zmroov�...�.. �o.00 min cm....as.00 o�oo
.
rc..... 28.20 min 0.00 min
ABSzoAcrzom cooFF. 0.20
' zoaeacu ' Sheet a. 142.80 ns. yso o.0.0532
eo�� aoo�. o.oz cco vn�. 0.01 uc'zt TIME: suo min
. '
`
'
^'
2/;0/01 2:2:0 PM Dean HoUgh & Acsociates page 3
CITY OF EDMONDS S/P#2000-62:C P GRANGER
ADDRESS: 911 MAPLE ST
APPENDIX A:DETENTION CALCULATIONS:2-100Y
HYDROGRAPH SUMMARY
VOLUME ..... .
PEAK TIME
HYD RUNOFF OF OF Contrib
Area
NUM RATE PEAK HYDRO
in. cf\AcFt Acres
cfs
950 cf 0.32
f 0.32
2 0.041 0 1447 C
5 2490 cf 0.32
30
0.097 T,�
3
tm,
gill
0,
2/20/01 2: 2: 0 Pm Dean Hough Associates page 4
CITY OF EDMONDS S/P#2000-62:C P GRANGER
ADDRESS: 911 MAPLE ST
APPENDIX A:DETENTION CALCULATIONS:2-100Y
STORAGE STRUCTURE LIST
UNDERGROUND PIPE ID No. S1
Description: STORAGE UNIT, S1
Diameter: 2.50 ft. Length: 116.00 ft.
Slope... : 0.0000 ft/ft Upstr: dnstr:
2/2o/oi
2:2:1 pm Dean Hough & Associates page 5
CITy OF EDMONDS S/P#2000-62:C P GRANGER
ADDRESS:
911 MAPLE ST
APPENDIX
-LCULATIONS:2-100Y
A:DETENTION CA
DISCHARGE STRUCTURE LIST
MULTIPLE
ORIFICE ID No. 01
Description:
ORIFICE STRUCTURE, 01
Outlet Elev:
247.00
Blev:
245.00 ft Orifice Diameter: 0.8643 in.
Elev:
247.90 ft Orifice 2 Diameter: 1.2627 in.
Elev:
248.20 ft Orifi ce 3 Diameter: 1.3770 in.