Loading...
20020049.pdfA'­k DATE RECEIVED 1h PERMIT EXPIRES CITY OF EDMONDS us ZO'NF PERMIT NUMBER CC CONSTRUCTION PERMIT APPLICATION ION FOWN_ JOB'E U SlIT111,11" _07NER Mass.— — ADD I N"�,M7�ME OF BUSINESS r PLAT NAME/SUBDIVISION NO. LOT NO,/ 111) NO. _A 'AILING ADDRESS LID FEE $ PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP ma 1A,__ aW P­" """ CITY ZIP FLEPHON� sum, U. Ps­�d EXISTING — PROPOSED - — I.- a Ilse — s'd 61 14jil RMIJI.E. E.I.ATI.N— =� I — 'u"'d NAME METER SIZE LINE SIZE NO. OF FIXTURES REQUIR 0 I YEPTIV a 0 NO C3 I ADDRESS REMARKS OWNERICONTRACTOR RESPONSIBLE FOR EROSION CONTROLIDRAINAGE f �'f T r-f U I I , _L_r it ENGINEERING REVIEWEDIDATE se ADDRESS J -7 r. - -a _ TELEPHONE FIRE NEVI.WED.Y DATE Ir V IM. ') STATE LICMSE NUMBER TUIN RANGE OR CU SHORELINEORADD# INSPECTION I BOND REQ'D POSTED a_C' / -7;1 knD_' C3VES E3 .0 1 2kkal Q Pllfl��Al I SERA REVIEW SIGN AREA HEIGHT COMPLETE EXEMPT ALLOWED PROPOSED ALLOWED PROPOSED 7C , , I EXP NEW rl RESIDENTIAL 13 PLUML.N., Ec. LOT COVERAGE REQUIRED SETBACKS IFT) PROPOSED SETBACKS (FT.) ADDITION COMMERCIAL A C MPLIANCE OR ALLOWED PROPOSED FRONT SIDE REAR FRONT LIASIDE REAR I [3 REMODEL 0 APARTMENT CHANGE OF USE n SIGN — — PARKING I LOT AREA j PLANNING REVWil) BY DATE REQD I PROVIDED 0 REPAIR GRADING CYDS Ei F NCE X FT) REMARKS [3 DEMOLISH E] TANK GARAGE CARPORT RETAINING WALL ROOKERY INESS OR ACTIVITY) EXPLAIN: _ GROUP Cf, OCCUPANH CHECKED BY JTYXZ:�r NUMBER OF NUMBER OF DWELLING CRITICAL AREAS _ �:;CTION SPECIAL INSPECTOR OCCUPANT STORIES UNITS NUMBER EQUIRED JAREA R YES LOAD DESCRIBE WORK TO BE DONE REMARKS us PROGRESS INSPECTIONS PER USC 1001FINAL INSPECTION RFO`D, Description FEE Description FEE Plan Check HEAT SOURCE OWING LOT SLOPE I Building PLAN CHFCK NO: "STE. 1111 — go, — ..KNOTISIXTIN.-RIAITCOVEN.WO.KTO 2 DEDWONEONPHIVATEP OPERTY ONLY. AM CONSTRUCTION ON THE PUBLIC ...... Gradinn Recording Fee DOMAIN JCURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, M.) WILL REQUIRE SEPARATE PERMISSION. 2 15 PER TrAPPLICATION: 184DAYS . Review City Surcharge A. PERMIT UMM. I YEAR - PROVIDED WORK IS STARTED WITHIN 10 DAYS gi; inspection PPA In, State Surcharge SEE BACK OF PINK PERMIT MR MORE INFORMATION 4ANDFire 'APPLICANII. ON BEHALF OF HIS OR HER SPOUSE, HEIRS. ASSIGNS AND SUCCESORS Traffic Mitigation 'Y Plan Chk Deposit IN INTEREST, AGREES To INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY Review Receipt # FROM THE I SUANCE OF THIS PEAMff. ISSUANCE F THIS PERMIT SHALL NOT HE F D SAVED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF MY CITY ORDINANCE Fire Inspection TotalAmountDue 21 N6R LIMIT IN ANY WAY THE CITY$ ABILITY 10 ENFORCE ANY ORDINANCE PROVISION.- Landscapelnsp., Receipt # I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION: THAT THE INFORMATION GIVEN IS CORRECT, AND TRATi Am THE OWNER. OR THE DULY AUTHORIZED AGENT OF APPLICATION APPROVAL THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAW REGULArING CONSTRUC. CALL T TION.'AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING 70 FOR INSPECTION a,, ding 01fillat or hisihar Deputy: ald Fees am paid, sed mc.111 is,elnoadadged In space p(mided. WORKMEN'S COMPENSATIOtjpikRANCE AND RCW 1&27� OF C ONATURE DATE SIG (OWNER ADEN DATE SIGNED (425) 4RE 771 "0220 glk9 2 RELEIV-D BY DATE -ATTENTION EXT 1333 IT IS UNLAWFUL TO USE '.1-- IPYA­j_ DING OR STRUCTURE UNTIL 771-0221 A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIF(- ORIGINAL - FILE YELLOW -INSPECTOR CATE OF OCCUPANCY HAS BEEN GRANTED, UBC SECTION 109 FAX PINK - OWNER GOLD - ASSESSOR 10/01 >� z 0 0 RI C 171 0 80 C M M z 0 -n IT 1111 In 0 0 Fn C (1) K, ED M 0 ;U 5 z z 0 q 0 IT1 FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: IRE DEPARTMENTDATE-�— ENGINEERING DIVISION DATE PLANNING DIVISION DATE PROJECT Z HE20,9 YLJ-2 �e�Zc SITE ADDRESS PERMIT # ---ADB# DATE INSPECTED 2--d —If �-—d �2- DESCRIPTION OF, WORK TO BE INSPECTED-4:f �C- �C A field inspection -was conducted to determine final compliance with approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED a Copy of CONDITIONS given to owner/contractor by inspector FAILED FINAL INSPECTION - OUTSTANDING ISSUES u Copy of CORRECTION NOTICE given to owner/contractorby inspector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Si ocaprvl.doc.l:teup:bldg:foz=10/01 MICROFILM z 0 M :4 9n a :� 0 M C M 0 80 C -4 r, M C 0 "n -4 M M 055 0 r- 0 M C 0) C co Q 0 z -4 2: z 0 =j 0 M 0 I , FINAL PROJ FORM XT APPROVAL TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: �FIRE DEPARTMENT DATE/2�-/ qfel ENGINEERING DIVISION DATE-__ — PLANNING DIVISION DATE.— PROJECT��Oe�ft/ S SITE ADDRES PERMIT # ADB#_____PATE INSPECTED-/ DESCRIPTION OF WORK TO BE INSPECTED A field Inspection was conducted to determine final compliance with approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of —GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED a Copy of CONDITIONS given to owner/contractor by inspector I FAILED FINAL INSPECTION - OUTSTANDING ISSUES XCopy of CORRECTION NOTICE given to owner/contractorby inspector SCtf D f W71 3. pC4_14-117 A(�"'T RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Si ocaprvl,doc.l:temp:bldg:formsIO/OI z Om a M 0 MM M Z 0 -n M M 0 V; 0'_ M 0 C/) Q 0 Z 4 X z co z M P/ RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Foi...................... no wait........................ Pier/Porch ................ Retaining Wall Slab InsulatloW .......... PLUMBING: Underground ............. Rough -In ................... Commercial Final HEATING: Gas Test Gas Piping Equipment Commercial Final EXTERIOR SHEATHING NAILING .......................... FRAMING .................. FIRST FLOOR FRAMING INSULATION ................. . Floor Insulation Wall Insulation Ceiling Insulation SHEETROCK NAILING SPECIAL INSPECTION MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. Aft z =P15 65 ;1 0 M C: M 0 0 M M .0 C M M 65 0 0 Fn ITIO z z 0, 0 ITI RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION.., - Footing ...................... wall .......... Pier/Porch ................. Retaining Wall ........... z Stab Insulation PLUMBING: Underground ............. Rough -in ................... Commercial Final HEATING: C) 0 C Gas Test ................. M: M M z Gas Piping ................. Equipment ........... f- -4 Commercial Final 0 -n EXTERIOR SHEATHING -n4 NAILING ...................... x IT! M FRAMING ........................ 0 Fn FIRST FLOOR FRAMING C M INSULATION ................... M C), Floor Insulation Wall Insulation ........... Ceiling Insulation z SHEETROCK NAILING SPECIAL INSPECTION 171 MISCELLANEOUS .......... FINAL APPROVAL FOR... OCCUPANCY