Loading...
20020091.pdf04*4 02_ PERMIT EXPIRES= CITY OF USE PERM T EDMONDS NUMBER CONSTRUCTION PERMIT APPLICATION JOB ADDRESS SU APT# -C.-f 7?� PLAT NAMEISUBDIVISION No. I LOT NO. L 0. —Leal —RIFD L�D D FEE S '7 PUBLIC RIGHT OF WAY PER OFFIC AL STREET MAP Appra— aw P­ R CITY EXISTING — PROPOSED— "a in—ne. Pan " 13 n­1 ol 13 ITELEPHONE OL,C� REQUIRED DE.ICATI.aI_ FT — U-"—' NAME MOCR size LINE SIZE NO. 01 FI1TU111 RV REQUIRED 0 I I a E3 No 13 3 —ZO—DRESS A MARKS WNERICONTRACTOR RESPONSIBLE FOR EROSION CONTROLIDRAiNAGE CITY ZIP JTILEIHOIII NAME ENGINEERING REVIEWED/DATE -1 z TELEPHONE FIRE REVIEWED BY DATE IQC) (' f, , 0 STATE LICENSE NUMBER EXPIRATION D VARIANCE OR CU SHORELINE OR ADM# INSPEC!ION R ED. 11.1TED. 1,10 Mmm DYES [3NO 'n $EPA REVIEW SIGN AREA HEIGHT PROPERTY TAX ACCOUNT DEL NO. COMPLETE EXEMPT ALLOWED PROPOSED ALLOWED PROPOSED X _19� I 1 (0, , XP , I Q:' C RESIDENTIAL LOT COVERAGE REQUIRED SETBACKS FMP PROPOSED SETS Ks (FF. AD 0 0 NEW ECH ALLOWED PROPOSED FRONT SIDE REAR FRONT URSIDE BEAR c) C: ADDITION COMMERCIAL isca""" OR 0 CHANGE "OF USE In E3 REMODEL 0 APARTMENT 0 SIGN PARKING REGO I PROVIDED LOT AREA PLANNING REVIEWED BY DATE m z REPAIR [3 GRADING Was [3 F NCE Fn ( FT) REMARKS _X_ [3 DEMOLISH 0 TANK OTHER 0 CAR BY ci RETAINING WALL [3 11 AGE ARPO ROOKERY 0 RENEWAL, o In (TYPE OF USE. BUSIN91�; m 9 da M=LAIN: CHECKED BY ION OCCUPANT GROUP hill m ta;�; 0 OF NUM.ffR .1 DWELL NO CRITICAL AREAS PECIALEINSPECTOR OCCUPANT STORIES UNITS' NUMBER JARIA a BOL I IN [] YES LOAD 0 C: 0) DESCRIBE WORK TO BE DONE REMARKS &RID �7_ go, PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION REaO z X klu 22A IoLQ z i n C .4a=e, VALUATION $ c) t1A Description FEE Description FEE z 9 y Plan Check --WEAT SOURCE GLAZING LOT SLOPE % Building 0 m PLAN CHECK NO: VESTED DATE Plumbing Mechanical THIS PERMIT AUTHORUES ONLY THE WORK NOTED. THIS PERMIT COVERS WORKTO t: BEDONEOMPIRWATEP OPEFM ONLY. AW CONSTRUCTION ONTHE PUBUC Grading Recording Fee DONUIRII (CLIFISS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC�) WILL REQUIRE SFPARAFE PERMISSION. Engr. Review City Surcharge PERMITAPPUCATION: INDAYS PERMIT LAMM, I YEAR -PROVIDED WORK IS STARTED WITHIN ISG DAYS SEE BACK OF PINK PERMIT MR MORE INFORMATION Engr. inspection State Surcharge —IC . ON BEHALF 01 HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS Traffic Mitigation Plan Chk Deposit IN INTEREST. AGIIES TO INIEMNIFY, D111110 AND HOLD HARMLESS THE CITY OF Receipt # EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES. AND AGENTS MOM ANY AND ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY Fire Review FROM THE ISSUANCE OF THIS PERNIK ISSUANCE OF THIS PERMIT SHALL NOT BE 9 DEEMED TO MODIFY, WAIVE Oil REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE Fire Inspection Total Aniotint Due 0 NOR LIMIT IN ANY WAY THE CITYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION.- andscape Inspi. Receipt # I HERESY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION APPLICATION APPROVAL GIVEN IS CORRECT., AND THAT I AM THE OWNER OR THE DULY AUTHORIZED AGENT OF THE OWNE . I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC CALL n -aliI.Ignedby9n, lan—PaInk TIORi AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL SE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION BanThf-ppliorel. ding Official or hisiber Barney: add F000 ate paid, and —.1p, I—k—ledg.al I -Poe. p­id.d. WORKMENIS COMPENS 1 1 �27. ea OFFICI IS; RE (OWNER G DATE SIGNED (425) 7 71 -0220 EIVOSE. BY 'DAnf TTENTION M 1333 IT IS UNLAWFUL To USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL 771-0221 A FINAL. INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- ORIGINAL - FILE - YELLOW - INSPECTOR CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 FAX PINK - OWNER - GOLD ASSESSOR .7 "A RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ............ FOUNDATION: Footing...................... wall .......................... Pier/Porch ................. z Retaining Will 25 Slab Insulation PLUMBING: Underground M C. Rough -in ............ 0 0, Commercial Final HEATING: IT ITI Gas Test ................ > z Gas Piping ................. 03 Equipment ............ 0, Commercial Final 3: r EXTERIOR SHEATHING IT! M a 0 NAILING .......................... 0 FRAMING ........................ C K IT 0 FIRST FLOOR FRAMING z INSULATION ................... Floor Insulation —4 z Wall Insulation ........... Ceiling Insulation SHEETROCK NAILING z 0 SPECIAL INSPECTION ITI MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. iWOROFILM