Loading...
20020109.pdfDATE RECEIVE D PERMIT EXPIRES �2 CITY OF EDMONDS us PE T ZONE NElRMM.E-,-;�Lbd - 0 109 JOB 0 q IUITI�ATl ADDRESS CONSTRUCTION PERMIT APPLICATION OVVNEn4�E/NAMEA BUSINESS PLAT NAMEISUBDtVISION NO, LOT NO, LID NO. LID FEE I M MAILiNGADDRESS 10315 2q2KZ PIAC.E S\A/ PUBLIC RIGHT OF WAY PEA OFFICIAL STREET MAP XISTING — PROPOSED REQUIRED DEDICATION— FT � TESCP Ippl—d 13 HW __ ft,­ 0 0 U­X­ CITY ZIP NAME MEIER SIZE I LINE SIZE 1 10. OF MIXTURES YEFFW REQUIRED so No 0 t: ADDRESS REMARKS OWNERICONTRACTOR RESPONSIBLE FOR E80SION CONTROUORAMAGE CITY NAME AAA lm)v �Sm/tce CO,j [Ak ENGINEERING REVIEWEDIDATE ADDRESS 77-j j(H�l(L-iEK)D 40E:A)UC FIRE REVIEWED BY DATE CITY ZIP 9 ITELEPICNE '1-) 801 �03 2- (q4 V%AIAN.E R ED SHORELINE OR ADBO INSPECTION PEO-0 OYES ONO BOND IPOSTED STATE LICENSE NUMBER EXPIRATION RATE _r MA tVfo66 Dw 3/18/021 SERA REVIEW COMPLETE EXEMPT EXP SIGN AREA ALLOWED , PROPOSED HEIGHT ALLOWED , PROPOSED PROPERTY TAX A - 0 NEW RESIDENTIAL 0 PLUMBING MECH I COVERAGE .W ALL LOED PROPOSED RED FBWgffnrjnfA= �r POSED ETBACKS (FT.) ONE L/R SIDE REAR C] ADDITION COMPLIA CE OR COMMERCIAL cl C HANGE OF USE s us'r BE PRE EIPT FO R PARKING OR CAPE REMODEL C] APARTMENT C] SIGN REDD I HACH GEtjNKtthj,P*EMMAtl�D REPAIR C] GRADING ... H 0 PENCE X III HEIVIAHIS 0 DEMOLISH TANK (3 OTHER ,MNIN" WALL 0 RENEWAL 'A 0 OA'�AGAT 'I 0 g (TYPE OF USE, BUSINESS OR ACTIVITY) EXPLAIN: Zt�E 'URNTS CHECHEOSY �VVJ/RUCTION 1 -1 CCU 'ROU PANT 27 1 0 P OF STORIES '__T'AREAS NUI A ING 'LLING ELL 'IS RPNCALr �N:UMBER A 411), �TfRSMARKS E I I — SPECIAR iGSPE I`0R "Ect A ' C EOUI ED YES JAREA PANT DESCRIBE WORK TO BE DONE PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION RED' P .., VALUATION I FEE I HEAT SOURCE ILAIII-4 LOT SLOPE PLAN CHE "K?:__--- STE DATE rPLANCHECKrEE —BING FBI' MECHANICAL THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO L BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC GRADING"il-L DOMAIN JCURBS, SIDEWALKS. DRIVEWAYS MARQUEES, ETC.) WILL REQUIRE F. SEPARATE PEnWIssIoN. IFTATE SURCHARGE "I­ PERMEEAPPLICATI M 18D DAIS PERMIT LIMIT.' I YEAR - PROVIDED WORK IS STARTED WITHIN ISO DAYS END REVIEW FEES SEE BACK OF PINK PERMIT FOR MORE INFORMATION END INSPECTION FEE -APPLICANT ON BEHALF OF HIS OR HER SPOUSE, HEIAS� ASSIGNS AND SUCCESORS I N INTEREST. AGREES TO INDEMNtly, DEFEND AND HOLD HARMLESS THE CITY OF IANDSCAD NO 2 EGMONDS,WASRtNGTQN ITSOFIRCIALS, EMPLOYEES ANDAGIENTS1110. ANY AND ALL CLAIMS FOR D-AGESOF WHATEVER NATURE,ARISING DIR _"' _1­1 ­ INSPECTION FEE _R�GEIPT ED M THE ISSUANCE OF THIS PERM" ISSUANCE or THIS PERMIT'SHALL NOT HE PLAN CHECK DEPOSIT 11 DIEMED TO MODIFY, WAIVE DR REDUCE ANY A QTPREMEN1 OF ANY C fY ORINHANC -q 0 Y 5ABIL;ty TOENFIDACE ANYORDINANCE PROVISION NORLIMI—ANYWAYTHECII _ IOIAI AVOUNI 1111t, RECE7,77f IGEITEBY A­NOWl EDGE THAT I HAVE READ THIS APFIFICAIION. THAT 11IF NF0IFVARON APPLICATION A 0 AL OF 0 GI�EN IS COARECf, AND THAI I A. 'HE OWNER OR THE DULY AUHG 1112ED A 11 F THEOWNEA I AGREE 10 COMPLY WITH CITY AND STATE LAWS REG )LAIIN6CONSTRHI; NO PE -ON WHt DI fN,,,.O,VD CALL z IF F I ION, AND IN DOING THE WORK AU HIR)RIZED THEREBY. THE IA A� STATE OF W HINGTON A , ATING FOR INSPECTION 11, VIOLATION OF �ODE WOR KIVENSCONIFENSA N G :2 RCW 1. 21 OlE�DtAL7$,1NAT A, I, SIO NATO"' 10 A OR I DAII -2 ;n (425) `1� 771-0220 - — ELEASEDCY DkHL. ATfENTION EXT 1333 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL 771-0221 A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- ORIGINAL FILE - YELLOW INSPECTOR CATE OF OCCUPANCY HAS BEEN GRANTED, UBC SECTION 109 FAX PINK. OWNER - GOLD ASSESSOR 519. z m c: m M 0 0 80 c m IT! z ID 0 -n n :r m M 0 V; 0 9 ca M 0 Z .4 3: > z co z 2 1 0 m oweinen 15:37 425-827-1444 AAA TANK SVC INC PACE V AAA TANK SERVICE INC. -4 7ZR Kirldgind Ayonjo Iffriallued, Washington 9M3 (43I)SO"U2, som sAwLE COLLECTION PROJECT Report #0 1 183572B, dated February 21, 20D2 Ropsillirt the PYOPCM Of. - Joseph A, Huma and Tgeren IL Bums Sampte Coillociticts Date; Site Nam: Situsle figerdly E42iderice s Addms 10315 242� place W ids, WA 98020 ite j soil sample(s) collection date; February 13,2002 Z Messoured depth to bottom tank floor: 59 inches below median grade. 0 68 Collection depth ollsoil temple: inches below median grods. Approximate location ofsoil collection: A soil "grob" sample was collected from 9 inches beneath, the — XMjoxLn.%t, ggoa of v�rtly after remoi lonnak The fill has been located in a londscoined M 0 sestruchm. fectessintifthe -40 ;�: 0 0 -4 X M Notes: I) *This residential hearing oil unit was niessured and found to be ofitominally 300 gallons capacity (37.5" dia. by M Z 10--i � I 6W length). 'no unk had contained 21 inches of fluid (approxhiretely 170 gallons) resembling faci oil (hoittins) a— > Z and no water #a determined using 2 wster.rosenive posto test method. A 1/4 inch LD. steel vent pipe for air was found note the tord; loostion along so exterior wall at the northeast corner ofthe house function- 2) Up" removal, the lingivwiR steel und, shell appeared to be basically bract with moderate corrosion, and 110 visible perforation we# observed after the Wk was pounded to retrieve loose sell ad wale for transport. did indicate typical oherocterislics 0fPMI0u-- 0 -n -n 3) Field scrostring ofsolls exposed in the lank cavity not contaminated soils; I.%, discoloration, odor, sheen, lie., all noted by Mr. Toby D. Parker, lFCI Licensed UST Mcommissioning Supervisor, To he slightly dtM sells encountered at the tank Root were Primarily of& hard, ITI M donse, 4syty-sond coruposition. Groundwater well "Or encountered in the Oxfllvdtim� 4) The 14b"oryC*rtiffmcotArAlysispro�ided for asorple 0CTFI-I reported argoultof"Nl)" irdicating that 0 0 then was nothdactionol'tt is compounds tested for above the minimum reporting level of 25 puts per million 0 C (ppm) for ilie"I Mgt and 50 ppin for oil range using this penticulc soullysiS 11101110d� The WIShinStOn State C ca an Ferrell Model ToxiesConim! ALI (MTCA) Method A soil cleartupievel for TPH as diesel oridoil r so um MO Z hydrocarbons i's 2000 ppir. 7bs sample was relinquished to CCI Analytical Laboratories, huc,, wDOS accreditation OC142, under a clitain-of-ciestody record on 2/24/Q2 for analysis Using Ecology method NVTPH.Dx (7PH-Scinivolatflo =1 Range (including thoicl and oil ralops)), Measir too the laboratory CoWflinitte ofAnalysis, and any related 1; discurrumbs, attached. Z LimitillIGUS: AAA Tank service Co., Inc, (AAA) has prepared this Jones, to guounwite pertinent infunnation ropirding Re gamplo(s) collected at this she. nil report has been propered for the exclusive use ofthe person or Z Fortune named above, and their authorized agents. nit report is not intended for use by others, and hufurmation conjahrodhorsh, is not applicable to other sites, or other 10CAC10111111 On this site, not Innited to the disir"te and vpociflt 0 :j soil here "WW*) collected. no available dam do not provide definitive inforourtion in regard to all put uses. or 0 rn operations. or hicidoinsis, at this site, and do not constitute proofas to whether or not contsminsted %od groundwater exists on this prop". This repoin does not include a comprehensive hiveinjostion of the area for all possible substances subject to repletion or potentially detrimental to human health and/or the envirannnent. No worrartY. expressed or Implied, should be understood. Submitted by, Bon F, Decode AAA Took service Co., Inc. PLACf tVl� PIT14 )AYI-Ir.PT -AAEfJr I t'Q m c: mo M, m 1 Nxve4 0, m m C-) Gmg5 PReA co (a rn 0 z Z: m I N z ?I too MICROFILM FINAL PROJECT APPROVAL FORM TO: DATE: iz MEMO TO: PERMIT COORDINAT011, BUILDING DIVISION DEPARTMENT D TE FROM: Z- ENGINEERING DIVISION DATE� z PLANNING DIVISION DATZ_ PROJECT U 7— SCJR--� I SITE ADDRESS Z,� -31 -5- at 7- k" Do M 0 0, PERMrr#9--Q0*2-0/QJ # ATE INSPECTED z M z DESCRIPTION OF WORK TO BE INSPECTED M 1A.1 A field inspection was conducted to determine final compliance with approved plans. Final approval 03 denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDE and the granting of M M 055 0 GRANT FINAL PROJECT APPROVAL 0 M M 0 GRANT PROJECT APPROVAL WITH CONDITIONS NOTED z Copy of CONDITIONS given to owner/contractor by inspector P15�V PI/L/& 50[t- S&%--,0C-1C L z 0 0 M FAILED FINAL INSPECTION - OUTSTANDING ISSUES a Copy of CORRECTION NOTICE given to owner/contractorby inspector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date�__ Sign ocaprvl.doc.l:temp.bidg:fot=10101 FINAL PROJECT APPROVAL FORM TO: DATE: NffiMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTNMNT DATE Z- ---ENGINEERING DIVISION DATE-- YLANNING DIVISION DATE — PROJECT ISU90,- I SITE ADDRESS 14 33 t z- he PERWr #2�2�/Q�.ADB#___-PATE INSPECTED—,,J �4 DESCRIPTION OF WORK TO BE INSPECTEDULT— A field inspection was conducted to determine final compliance with approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PER RM_ANCE BONDS and the granting of: GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED /'k Copy of CONDITIONS given to owner/contractor by inspector 1. pl�,v P//Z/(, 'Sol/ &cprj FAILED FINAL INSPECTION - OUTSTANDING ISSUE S u Copy of CORRECTION NOTICE given to owner/contractor by inspector 2. 3. MICROFILM RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date— Sign_ ocaprvl.doc.l:teinp:bldg:fomisIO/OI z 0 q --ji M M 0 --10 00 a M M z CA o"n M M CM W C C/) M 0 M z --i 2; co z 0 M I"T 17 7 RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... 3 FOUNDATION: Footing ...................... wall .......... z Pier/Porch ................. 0 RetainIng Wall ........... Stab Insulation .......... :4 PLUMBING: 3: a ITI C= Underground ............. IT! 0 —to Rough -In . ................. C Commercial Final m HEATING: c p GasTest .................. Cft Gas P1 IIIng .......... 0 -n -n Equipment ............. M M Commercial Final 0 0 Fn EXTERIOR SHEATHING C 0) NAILING ................... ca 0 FRAMING . ....................... FIRST FLOOR FRAMING... ;0 INSULATION ................... Floor Insulation 4 3: Wall Insulation ........... z Coiling Insulation 9 SHEETROCK NAILING 0 frill SPECIAL INSPECTION MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY ..................