Loading...
20020119.pdfDATE RECEIVED PERMIT EXPIRES CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION USE ZONE 'A`m)RESS SUITEJAPT# M6 &) A/1- OWNER NAMEINAM ;F0 �/1"U1,17%,01", I 'Bener lc,� -Z',,< PLAT NAMEISUBDIVISION NO. I LOT NO, LID NO, LID FEE $ MAILING ADDRESS a-( P BLIC RIGHT OF WAY PER OFFICIAL STREET MAP EXISTING - PROPOSED- REQUIRED DEDICATION- FT -cpAr' " AY R-- ZIP JTEIEIHO I "w-7746�?V-)LS— NAME METE' SIZE I LREMARKS LINE SIZE No. OF "-U... P"' 11OUIRID YES E3 NO E3 A . DDRESS OWNERICONTRACTOR RESPONSIBLE FOR EROSION CONTROUDRAINAGE CITY ZIP ITELEPHONE NAME Fit E REVIEWED BY CDC 19.30.49FJ "'I.ATORVALVE nV) 1 CITY ZIP TELEPHONE STATE LICENSE NUMBER EXPIRATION .,ITS VARIANCE OR'66 SH �LLH0fiEIqjPJMLE THE WATER SHtr ) MiRWON C6rEQG ES [3 NO I PRO D OSTED PROPERTY TAX ACCO PARCEL NO. -7,0 513 iV4 01!tf 06 SEPA REVIEW COMPLETE EXEMPT EXP SIGN AREA ALLOWED PROPOSED HEIGHT PROP D ALLOWED OSE NEW ga�IIESIDENTIAL LUMBING I MECH ADDITION 0 COMMERCIAL o C MPLIANCE OR CHANGE OF USE REMODEL rl APARTMENT SIGN [I REPAIR 0 GRADING cy,,,E F NCE ( _ X FT) 0 DEMOLISH [3 TANK OTHER 0 BAR ET BETAIN114G C AG 13 ROOKERY WALL ARPO RENEWAL LOT COVERAGE ALLOWED PROPOSED REQUIRED SETBACKS (Fr.) FRO14T SIDE REAR PROPOSED SETBACKS (FT) FRONT LIRSIDE REAR PARKING I REO'D I PROVIDED t:!as A LOT Af -! DATE R FEW... SHALL BE INSTALLED ON THE LINEASITENrERSTHUBLI11,15M (TYPE EXPLAIN: 0, USE, BL"""5r—;z CHECKED BY 1�=UCTION nf Go P 1 0 G�UPAW� NUMBER OF STORIES NUMBER .' -T-cRtTjCAL DWELL No U IT., A REAS NUMBER SPECIAL INSPECTOR IA"'A REQUIRED 0 YES I OCCUPANT LOAD DESCRIBE WORK TO BE DONE REMARKS PROGRESS INSPECTIONS PER URIC 108/FINAL INSPECTION REO'D L /& VALUATION $ Plan Check HEAT SOURCE LOT SLOPE % Building PLAN CH ECK NO. V61TID DATE Plumbing Mechanical THIS PERMIT AUTHORIZES ONLY THE WORK NOTEDL THIS PERMIT COVER WORK TO h Be DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC Grading Recording Fee 130AMN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUESS, ETC.) WILL REQUIRE SEPARATEPERUISSION. Engr. Review City Surcharge PE "ITAPPLIGATION: 1NDAYS PERMIT MAIM I YEAR - PROVH) WORK IS STARTED WITHIN 180 DAYS Engr. Inspection State Surcharge SEE SACK OF PINK PERMIT FOR MORE INFORMATION —LICA" ON BEHALF 01 HIS OR HER SPOUSE, IIIIRI, AIIIIINI AND IUCCESOFE Traffic Mitigation Plan Chk Deposit IN INTEREST, AGREES To INDENPRI DEFEND AND HOLD HARMLESS THE CITY OF EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND Fire Review Receipt # ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIt JSSUANC� OF THIS PERMIT SHALL NOT BE DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE Fire Inspection Total Amount Due NORLIMITINANYWAYTHEC 6 ABILITY TO ENFORCE ANY ORDINANCE PROVISION.- Landscapeinsp. Receipt # I HERE ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION: THAT THE INFORMATION APPLICATION APPROVAL GIVEN IS CORRECT. AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF THE OWNE . I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC. CALL ThIv vppft.11-1, �.I by ft TION; AND IN DOING THE WORK AUTHORIZED THEREBY. NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION Oullfto OftIM., hl.lt Dp�y; d F—..P.id, _Ipt 11 1ck1-1.dg.d I..p ... p—id.d. WORKME=SATION INSURANCE AND RCW 18.27. OFFICIALS SIG DATE G AURE S.Y DATE SIGNED (425) 1� -� -/j --0 -) - 771-0220 I -4�11E*A'BEG L) AITENTION EXT 1333 IT IS UNLAWFUL To USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL 771-0221 A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI. ORIGINAL - FILE YELLOW � INSPECT A CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 FAX PINK, OWNER GOLD -ASSESSOR z 0 M TR -400 0 C: -4 K X M 171 z ki _4 0 -n pff M 0 0 0 M DO On IT 0 z 7-1 z :0 z 0 171 If FINAL PROJECT APPROVAL FORM T0461 N A,,L DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIR DEPARTMENT DATE- -ENGINEERING DIVISION DATE A PLANNING DIVISION DATE — PROJECT �41� SITE ADDRESS C/oz PERM[IT e-&q--ADB# INSPECTED DESCRIPTION OF WORK TO BE INSPECTED—&/4Z& A A field inspection was conducted to determine final compliance with approved plans. Final approval denotes that there are no objections from the above signed Department to the release of E BONDS and the granting of: __�_GRANT FINAL PROJECT APPROVAL JUL 2 2002 GRANT PROJECT APPROVAL WITH CONDITIONS NOTED u Copy of CONDITIONS given to owner/contractor by inspector ENGINEERING DIVISION FAILED FINAL INSPECTION - OUTSTANDING ISSUES o Copy of CORRECTION NOTICE -given to owner/contractorby inspector 2. 3. RE-INSpECTED OUTSTANDING ISSUES GRANT FINAL PROJECT APPROVAL Date- Sign_ ocaprvl.doc.l:temp:bldg:fomisIO/OI z 0 0 M rn M a 0 80 C -4 K X M M Z 'o -q C o -n n rn rn a 0 0 M C cn 9 W Q 0 Z > z co z 0 1 0 M i RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ................. 6 wait- .................. Piet/Porch ................. Slab Insulation PLUM SING: .............. MUnderground C IT! 0 Rough -in ................... C commercial Final -j C HEATING: C Gas Tast > Gas Piping ................. 0 -n ................. Commercial Final 1171 pill 0 EXTERIOR SHEATHING NAILING _ ....................... 0 FRAMING ........... C ITI 0 FIRST FLOOR FRAMING Z INSULATION .................... Floor,lnsulation z Wall Insulation ........... Ceiling Insulation z SHEETROCK NAILING SPECIAL INSPECTION pill MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY ................