Loading...
20020169.pdfOATS RECEIVED PERMIT EXPIRES I / CITY OF EDMONDS us' E IT P ZONE URIM M N EIR,4,0,,� - CONSTRUCTION PERMIT APPLICATION JOB SUPTE/APT# ADDRESS OWNER NAMEINAME OF BUSINESS 0 ea PLAT NAME/SUBDIVISION No, LOT NO. L NO. MAILING ADDRESS D FEE $ L�D PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP — P.- A.. CITY ZIP ITELEPHONE EXISTING — PROPOSED— �._­­q_ REQUIRED DEDICATION— FT — NAME METER SIZE LINE SIZE No. 01 FIXTURES 1EOUI1 11 - ---- - --- I I YEPRV SO NO C3 ADDRESS REMARKS OWN R/CONTRACTOR RESPONSIBLE FOR EROSION CONTHOLIDRAINAGE CITY ZIP ITILEIIIIINE HHF_ 10ARS! ft PR�GSNT FQR NAME M�S� b� TANK CAP PLI.. ENGINEERING DIDATE ADD EBB /) (-'/� CITY ZIP TELEPHONE FIRE REVIEWED BY DATE 1714� STATE LICENSE NUMBER EXPIRATION DATE VARIANCE OR CU SHORELINE OR ADO# INsPicTicm- SOD Fitomp- .1 V OYES [3 NO JP.STE� PROPERTY TAX ACCOUNT PARCEL NO. $EPA REVIEW COMPLETE EXEMPT SIGN AREA ALL ED PROPOSED HEIGHT ALLOWED PROPOSED 1/ 3 '/,� L v XP I , I 0 NEW IIESI.�NTIAL LO COVERAGE REQUIRED SET ACKS (Fr.) PROPOSED STBACKS (FT.) 0 PLUMBING I NEON ALLOWED PROPOSED FRONT SIDDE REAR FRONT LISRSIDE REAR ADDITION 0 COMMERCIAL L[O]APAROTEMFIENT C MPLIANCE OR CHANGE OF USE I I • REMODEL 171 SIGN R REQ'o`A IKIPNROOVIDED LOT AREA I I PLANNING REVIEWED BY DATE • REPAIR GRADING CYDS 11 ( ENCE X FT) REMARKS [3 DEMOLISH a--TA.K [3 OTHER o GARAGE RETAINING WALL CARPORT 13 TIOCKERY [3 RENEWAL (TYPE OF USE, BUSINESM _ZPLAIN: ;� / I I - " . " , CH ECKED BY TYP ONSTZGTON V M 1:22CCUPANT& GROUP NUMBER OF CRITICA k I =Ma"' OF 0 ELLING AREAS, P .T.ME. UNITS NUMB R BE DESCRIBE WORK TO BE DONE Plan Check Ian Check ME—ATSOURCE GWING % 1: "IT SLOPE % Building u,"I"'. PLAN CHECK NO: VESTED DATE Plumbing ,._b..g rGrading Mechanical Mechanical THIS PERMIT AUTHORMS ONLY THE ORK NOTED. THIS PERMIT COVERS WORK TO IC BE GONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE BUD VOULAAM (CURBS. SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REG IRE I PU U '. I g SEPARATE PERMISSION. Engr. Review P. BIT APPUCAGO.: I- a — BAR � PROVI ED WORK IS STARTED WITHIN 1 80 DAYS Engr. Inspection SE., BACK OF PINK PERMIT FOR MORE INFORMATION *APP1IC N!, ON BEHALF 01 HIS OR HE" SPOUSE, "EIR1, ASIIGNI AND IUCCE1081 IN INTEREST. AGREES TO INDEMNIFY. DEFEND AND HOLD HARMLESS THE CITY OF Traffic Mitigation EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND ALL CLAWS FOR DAMAGES OF WHATEVER NATURE. ARISING DIRECTLY OR INDIRECTLY Fire Review FROM Till I SUANCI 01 THIS PERMIT ISSUANCE 01 THIS PERMIT SHALL NOT BE nEEMED TO MODIFY. WAIVE OR REDUCE ANY REQUIREM NT OF ANY CITY ORDNANCE Fire Inspection NOR LIMIT IN ANY WAY THE CITYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION. - I HEREBY ACXNOWLED E THAT I HAVE READ THIS APPLICATION; THAT HE INFORMATION GIVE" 18 CORRECT, AND THAT I AM THS OWNER, OR THE OULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC_ TION; AND IN DOING THE WORK AUTHORIZED THEREBY. NO PERSON WILL BE EMPLOYED CALL IN VIOLATION OF T14E LABOR CODE OF THE STAT OF WASHINGTON RELATING TO FOR INSPECTION WORKMEN'S C SUSAN ,qYrW�ISATION IN CE AND ROW IB,27. SIGNATUR�(OWNEFII!Ifk AGENT) _T=ATEs1.NSD (425) 771-0220 ATTENTION EXT 1333 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL 771-0221 A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 FAX 10101 PER UBC 11081FINAL INSPECTION REQ`D FEE Recording Fee City Surcharge State Surcharge Plan Chk Deposit Receipt # Total Amount DUE Receipt # ORIGINAL - FILE YELLOW . INSPECTOR PINK, OWNER GOLD -ASSESSOR z 0 am C: 0 m 0 80 1 ! C: -4 C X m m z 0 ,n m m 055 0 0 Fn C 900, MO z -4 0) z 9 0 m A PORTION OF THE NE 1/4' jF THE SW 1/4 OF SEC. BELL STREEr V=WT xx cat m v m rs� z Or rp 6" MN— K, N ai D snw EX. .51 9"— c 0 0 101 c Im Tm z > cft pm 0 -n n Ly Mot M M, V) r- 0 0 r il M 0 z co-mm AM& -min m S ALLEY RLMR�I�QN & TEMPORARY EROSION SIL-r" Ix ....1 6, Q-RR TENGINEERI 12616 49th AVE. WEST MUKILTEO, WA 98275 M. 10/22101 RKR C-2TESC.UM. 04/23/2002 13:46 2069321007 TANK WISE PAGE 02 TANK WISE LLC FOM VVue Telephone (206� 937-3"5 cwfractot tk;.#TANKW0MG Fox (2D6) 932-1007 44$5 35th Ave. S.W. Soatra, WA. 90126 King April 9, 2002, 0 To Whom It May Concern: M This letter is in regard to the heating oil tank removal at 614 Bell St, Edmonds, WA, Upon removal ofthe heating oil tank a samill amount ofcontaminated soil was created by a mishandling ofthe heating oil tark and a small amount ofground contamination was 0 m found during excavation ofthe tank. Tank Win was called to pump out and pick up tank m 0 0 fbr cleaning and disposal. Tank Wise pulled three soil samples for a profile for the -10 0 C removal ofthe contaminated soils to be deposed at Rinker materials. The samples came -4 X back at 19,000ppm (parts per million) from the stock pile. The second sample came back X M at 14,000ppm and was taken 2 feet fi-om. the west end oftank 5 feet below surface grade —Z� The third sample was pulled from the Same: spot, a the second sample but at six feet below w 'ace grade this Sample raw back at <50 ppm. in 16.44 tons ofcontaminated soil was taken to Rinker for treamaent. Twomoresoil 0 Samples were pulled from excavated area around the tank hole, These san*les were taken at 60 inches and 66 inches below surface grade. The results came back for both samples Vi at<soppnL 0 0 The soil samples results came back at less than 50ppm so no ftirther clean up is required, C Cal 0 The DOE (Dept. of Ecology) recommends a cleanup if it comes back 2000ppin or higher for Hydrocarbons. Since these samples showed <50ppm the ground is considered clean M and no fi&Jm cleanup is necessary. Ifyou have any Auther question please, call (206) 937-3995, z Z. TomWisc m TANK WISE 04/23/2002 13: 46 '2069321007 TANK WISE PAGE 03 FRIEDMAN & BRUYA, INC. V ENvIRONMENTAL CHENSTS Date of Report: 04/16/02 Date Received: 04/09/02 Project: 614 Bell St Date Extracted. 04110/02 Date Analyzed: 04/10/02 RESULTS FROM THE ANALYSIS OF THE SOIL SAMPLES FOR TOTAL PETROLEUM HYDROCARBONS AS DIESEL 0, USING METHOD NWTPH-Dx Extended to include Motor Oil Range Compounds Mi Results Reported on a Dry Weight Basis Results Reported as vglg (Pp-) Surrogate M Do! S..]Dl- 112 Diesel Exten, (% Recov -4 Laboratory ID (CIO -CM) (Limit 45-147) 0 1,f From Propline <50 86 M ff North Wall 66" BSG Z, 204OW-01 16'From Prophne <50 100 0 South Wall 60" BSG I W4065,02 M M; 0 Method Blank <50 97 Z!, ?5 M FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: ___YIRE DEPARTMENT DATE ENGINEERING DIVISION DATE z 0 0 PLANNING DIVISION DATE PROJEC C 6 IVS 7—, 0 X SITE ADDRESS M 80 X M M Z PERMIT # 9_6n�t, 0&7 ADB#_ --DATE INSPECTED DESCRIPTION OF WORK TO BE INSPECTED A field inspection was conducted to determine final compliance with approved plans. Final approval 0 n denotes that there are no objections from the above signed Department to the release of I PERFORMANCE BONDS and the granting of: :0 K � M M 0 U5 GRANT FINAL PROJECT APPROVAL C: M 0 9 co M z 0 X -4 z GRANT PROJECT APPROVAL WITH CONDITIONS NOTED Copy of CONDITIONS given to owner/contractor by inspector z FAILED FINAL INSPECTION - OUTSTANDING ISSUES u Copy of CORRECTION NOTICE given to owner/contractor by inspector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL JECT APPROVAL Date M—q,�-02­ ocaprvl.doc.l:temp:bldg:formsIO/OI FINAL PROJECT APPROVAL -FORM TO: DATE- I�MMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: --- YMDEPART1,IENTDATE ENGINEERING DIVISION DATE — PLANNING DIVISION DATE— PROJEC SrrE ADDRES q PERmrr#AL6 -��ADB#---------PATEINSPECTED�3-,&,-2001z- DESCRIPTION OF WORK TO BE INSPECTED-U12L-SfA:d��.. A rield inspection was conducted to determine final compliance with approved planS. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL ATM CONDITIONS NOTED a , Copy of CONDITIONS given to owner/contractor by inspector FAILED FINAL INSPECTION - OUTSTANDING ISSUES a Copy of CORRECTION NOTICE given to owner/contractor by inspector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date_ Sign_ ocaprvi.doc.l:temp.-bldg:forinsIO/OI z 0 M C a M 0 80 3: M M z ID --I z 0 M M 065 0 0 a CD K co M 0 X z -4 z M FRAMING ........... FIRST FLOOR FRAMING INSULATION ................... Floor Insulation Wall Insulation ........... Ceiling Insulation SHEETROCK NAILING SPECIAL INSPECTION MISCELLANEOUS .......... FINAL APPROVAL FO R OCCUPANCY .................. IT, IT 0 80 c mm IT O'n :r C m m 0 0 0 c c fi) M 0 Z z z 9 0 IT