20020183.pdf�L(:Lo_ol. FL_
EX.
EK
�4
G>
cl)
w
C/)
m
�tou 5
z
m r
C�
Q,
m
203.5b �r
XISTIN6 GOVEREP P
ma
o
A
0,
CORNER
ELEVATIONS
M
m
Ico
EXISTING
PRIVEWAY
Ir
K
0 -n
TIT M
c)
o
EXISTING
MANHOLE
COVER 0
EX. MEANS EXIST�Tlp NSIOI!�
, E�
SEE FOLLOW, R BLOC.
N
ELE,�ATof*\
>
z
q TH. AVENUE NORTH
z
-z"'. ill-0
Cirf 'C('
0
m
IzT 1091 -�o M. &�r r, 15D rT-,e;r- r-vr
ao. vow Of' 5a cm.
$RECEIVED
FEB - 8 2002
-f",o
115S7 in,,5 014 00, M UBUILDING --DEPT.
T"I, 611,111 A340"ll *0 of 11811111 1. 1. 1#11111AL C"ARACT941STICS Of Tug 301L . won DOES IT
v CU or .4
A. A',
DATA SUPPLIED IT ....... USE .1 PLOT ACK90.1.60GES ACCEPTANCE.
DATE Q"W� LOT
IL
DrTj0t4
RICHA40 R. 691OLC
(OUILOINO wta.6694
V_
tE�Al) N t-, A
FINAL PROJECT APPROVAL FORM
TO:
DATE: —
MEMO TO: PERMIT COORDINATOR, BL71LDING DIVISION
FROM: FIRE DEPARTMENT DATE —
ENGINEERING DIVISION DATE
PLANNING DIVISION DATE,__
PROJECT LZI—IF812,41A_�
srrEADDREss- a4l�, A-1
PERmrr,# AD]3#—_-------PATEINSPECTED--2�(I
DESCRIPTION OF WORK TO BE INSPECTEDF1. t\)J\
A field inspection was conducted to determine final compliance with approved plans. Final approval
denotes, that there are no objections from the above signed Department to the release of
PERFORMANCE BONDS and the granting of:
__��GRANT FINAL PROJECT APPROVAL
GRANT PROJECT APPROVAL WrIH CONDITIONS NOTED
u Copy of CONDITIONS given to owner/contractor by inspector
FAILED FINAL INSPECTION - OUTSTANDING ISSUES
u Copy of CORRECTION NOTICE given to owner/contractor by inspector
2.
3.
RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
Date-_ Sign_
ocaprvi.doc.l:tenip:bldg:fonnsIO/OI
z
C: M
rn 0
0
80
a
M
M z
K) -i
C
Cn
0 -n
-ni
M M
0
0
C CD
Q 0
F
>
z
0
i
0
M
z
RECORD OF INSPECTIONS
INSPECTOR
DATE APPROVED
V'Yl
SETBACKS ....................
FOUNDATION:
--,C-
Footing .....................
wall.1 .......................
Pier/Porch .................
Retaining Wall
Slab Insulation ..........
PLUMBING:
Underground ............
Rough -In ...................
Commercial Final
HEATING:
Gas Test ....................
Gas Piping .................
Equipment .................
Commercial Final
EXTERIOR SHEATHING
V'V)
NAILING .............
FRAMING ....................
FIRST FLOOR FRAMING
INSULATION ..................
Floor Insulation
Wall Insulation ...........
Ceiling Insulation
SHEETROCK NAILING
VVNS
SPECIAL INSPECTION
MISCELLANEOUS ..........
FINAL APPROVAL FOR
Vy-,S'
OCCUPANCY ..................
z
0
M
C
M
80
C
M ITI
to
.n
x
M M
0
0 Fn
C (a
C (j)
Q 0
Z r-
z
-1
z
0
1
0
ITI