Loading...
20020189.pdfE"XPIRM��� CITY OF EDMONDS us ZONE PERMIT NUMBER CONSTRUCTION PERMIT APPLICATION JOB IUITIIAITI R M N "O"U" BE 0 . MkM_FJNAMEOF BUSIM BE ADDRESS PILAT NAMEISUBDIVISION NO. LOT NO. L�D NO. A No A.DE SS AILING ADDRESS I PUBLIC D FEE $ . _­,,:�.-r L JA RIGHT OF WAY PER OFFICIAL STREET MAP 13 CITY TEL -P;7�� JTW!�� EXISTING - PROPOSED - I Ireq-w ds REQUIRED DEDICATION- F! -7 METER SIZE LINE SIZE NO� OF FIXTURES PAV REQUIRED I YES 0 NO 13 e ENGINEERING REVIEWEDIDATE ADDRESS FIRE REVIEWED BY DATE STATE LICENSE NUMBER EXPIRATION DATE VARIANCE OR CU SHORELINE OR ADS# INSPECTION OSNO Pao RECID TEC ES 0 NO I NY PARCEL NO. SERA REVIEW ,.,I AREA HEIGHT COMPLETE P ED PROPOSED E�ZPT We _00/ _t51 1_)1-_13 E.P t4l , gN 'L NEW 11 RESIDENTIAL 1�r-1 CEC. LOT COVERAGE REQUIRED SETBACKS (FT.) PROPOSED SETBACKS (FTL ALLOWED PROPOSED FRONT SIDE BEAR FRONWT R SIDE BEAR 0 ADDITION /7,' o COMPLIA CE OR 2 COMMERCIAL CHANGE OF USE PARKING �/REMODEL APARTMENT ]ON 0 I LOT AREA DATE REGD.'[=IDE );2;W_ REPAIR 0 1 0 "'No CYDS (INCE X EMAIKI* C OA6V AMD ,Nw IL 0 DEMOLISH TANK WHER (AAI14Gla�� [3 GARAGE CARPORT [3 RETAINING WALL 1, [3 RENEWAL OCKERY Alpfj, _3 aYPE OF USE, BUSINESS OR EXPLJVN: ,ee g 7.iVITY) - - - ..sCKED.1 11112�MJIUCTI.11 0 UPANT GROUP NUMBER OF UMBER OF CRITICAL WELLING AREAS OCCURA: STORIES NITS NUMBER DESCRIBE WORK TO BE DONE JIRROGRESS LOAD -41 REMARKS INSPECTIONS PER UBC 108/FINAL INSPECTION REO'D VALUATION $ 4­'X� FEE PLAN CHECK7:, VESTED DATE Plumbing THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO Mechanical t: BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUSUC Grading Recording Fee M DOMAIN (CURBS, SIDEIVALKS. DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE C SEPARATE PERMISSION. 90eview - — 2 RE MITAPPUCAIION: 180DAY. -50— City Surcharge — _f_� PERMIT UMM, I YEAR -PROVIDED WORK IS STARTED WITHIN 18.... State Surcharge See BACK 01 PINK PERMIT FOR MORE INFORMATION 'APPLI ANT. ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUC ESORS Traffic Mitigation Plan Chk Deposit IN ...EST. AGREES To INDEMNIFY. DEFEND AND HOLD HARMLESS THE CITY OF EDMONDS, WASHINGMTAON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND Fire Review Receipt # ALL CLAIMS FOR DA ES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCEGOF THIS PERMIT ISSUANCE Of THIS PERMIT SHALL NOT HE DEEMED TO MODIFY WAIVE OR REDUCE ANY REQUIREMENT OF NYCITYORDINANCE Fire Inspection Total Amount Due NOR LIMIT IN ANY WAY THE CITY'S ABILITY TO ENFORCE MY ORDINANCE PROVISION.- - Landscapoinsp. Receipt # I HERE ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION GIVEN IS CORRECT. AND THAT I AM THU OWNER, OR THE DULY AUTHORIZED AD NT OF APPLICATION APPROVAL THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC. CALL This sppftati.� i—Is pannit-11 sigred by . TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE Of WASHINGTON RELATING TO FOR INSPECTION Bulifto Meet .1 hIsIhot Deputy: wd Foes are Paid. and .�elpti,,ck,c,l,dg,di,spacep,o,ided. WORKMEN'S COMPENSATI=SURANCE AND RCW 182T III TFIiNA1S ATU :1 SIGNATURE =)E SIGNED (425) 771-0220 ATTENTION—,- TO EXT 1333 NE11ASI!�� DI E JQ 'U IT IS UNLAWFUL USE OR OCCUPY A BUILDING 013 STRUCTURE UNTIL 771-0221 A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI. CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 FAX ORIONAL�FILE YELLOW. INSPECTOR PINK - OWNER GOLD - ASSESSOR 10101 z Cl) m 0 C) 0 C m to E: :� co 0 -n m M 0 0 ri) alt M 0 z 71 z 9 1, 35 m C, of Cbmabo certift"Cate of ettupantp DEPARTMENT OF BUILDINGS PER UNIFORM BUILDING CODE SECTION 109 At, 8020 --_______Building Permit #: #N200 189 Occupancy established by this ceitificate: Dwelling Units: -N/A** No. Stories: I B Type Construction: V-N Basement: No Maximum Occupant Load -49-- _(Per U.B.C. 1002) Room capacity signs, when required, must remain posted at all times. owner of Building: Jacqu Mavo Address: 417 Main S . Edmonds, VIA 98020 THE Cottage Restaurant HAS BEEN INSPECTED AND APPROVED AS COMPLYING WITH THE REQUIREMENTS OF THE 1997 _Thai EDITION OF THE UNIFORM BUILDING CODE AS ADOPTED BY THE CITY FOR THE GROUP AND DIVISION OF OCCUPANCY AND THE USE FOR WHICH THE PROPOSED OCCUPANCY IS CLASSIFIED. Issued this 19th day*f__Ap_r1I, 2002 CHIEF B FFICIAL BY: This cerilkata shall be posted in a c—,0—Ia NMI— and shall not be ro—ad, mutilated � niauved oW Own be rnaintained In Ieglt,[e condilinn Wall 5— Any �hanp Ofo-,P&KY —Onmnd,aa I, bolding pennit am a nm Certf�toof�parmylss�byftOtydEd�dsauticongoifidal. I FINALPROACT APEROVAL FORM TO)A-- DATE: MEMO TO: pERmrr COORDINATOR, BUILDING DIVISION FIRE DEPARTMENT DATE — FROM: ENGINEERING DIVISION DATE- 2n=�:PLANNING DIVISION DATE—.!�--/B-0'Z PROJECT SITE ADDRESS—t PERmrrt2&2 �-/ �ADB#-------PATE INSPECTED DESCRIPTION OF WORK TO BE INSPECTFD--,Y���� A field inspection was conducted to determine final compliance with approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: X GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED Copy of CONDITIONS given to owner/contractor by inspector FAILED FINAL INSPECTION - OUTSTANDING ISSUES u Copy of CORRECTION NOTICE given to owner/contractorby inspector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date. Sigu� ocaprvl.doc.l:tenip:bldg:fonnsIO/OI z 0 C M M0 0 80 C M M z jo -i C Z �3: 0) 0 -n A x 9 M M 0 M a) Cn M0 Z z z M RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ................ FOUNDATION: Footing ...................... wall Pier/Porch ................. -04 Retaining Wall ........... Slab Insulation PLUMBING: Underground ............. M Rough -in 0 .................. -10 Commercial Final HEATING: ITI IT! ID Gas Test .................... Gas P, ping ................ 0 -n Equipment Commercial Final M M EXTERIOR SHEATHING NAILING .......................... 0 FRAMING ..................... Q 0 FIRST FLOOR FRAMING... INSULATION .......... ;13 - -4 Floor Insulation Wall Insulation ........... 3: w Coiling Insulation z 0 SHEETROCK NAILING -I 0 SPECIAL INSPECTION ITI