Loading...
20020199.pdfI DATE RICIIVEII� � '._3 _ 6 � /V//_yP W) A Z' 1 * [PERMIT EXPIRES CITY OF EDMONDS 111.1HE PERMIT ;2wo C� NUMBER - - C) lcn 611T �PT ci CONSTRUCTION PERMIT APPLICATION ADBRESS SI "E� 71 PLAT NAMEISUBDIVISION NO, LOT NO, LID NO la AILING ADDRESS LID FEE S 0 17 q PUBLIC FIGHT OF — PER F1I.IA1 STREET MAP Se..' Us. P­ As, A CITY or TELEPHONE V EXISTING — PROPOSED Asee's, 0 0 REQUIRED DEDICATION— FT NAME METER SIZE I LINE SIZE I NO. OF FIXTURES PRV REOUIRED YES 0 N 0 A, ADORER$ REMARKS OWNERICONTRACTOR RESPONSIBLE FOR EROSION CONTROLIDRAINAGE TV TILE ONE de ADDRESS ENGINEERING REVIEVED/DATE ej CITY ZIP TEL FIRE REVIEWED BY DATE z IZ 04 7-7 9 STATE LICENSE NUMBER EXPIRATI VARIANCE OR CU SHORELINE OR ADB# INSPECTION D 'D 0 OR/60&7 11 7 D 7— 'L/x� RE IPSO OSTED E3YES t3NO 71 :I PROPE_RTYTMACC0UfF_PAT SEPA REVIEW SIGN AREA COMPLETE EXEMPT ALLOWED PROPOSED ALLOWED HEIGHT PROPOSED ad 00 1�q 000 1 ;7 zi EXP I , 3: REQUIRED a RR C: NEW [3 RESIDENTIAL El PLUMBING MECH GO ERAGE SETBACKS JFT) PROPOSED SETBACK$ (Fr.) LOTGO ALLOWED PROPOSED FRONT SIDE REAR FRONT LIRSIDE REAR 111110 As 0 at ADDITION fa COMMERCIAL COMPLIA CE OR 0 C RANGE OF 0 REMODEL E] APARTMENT USE El siaN PARKING LOT ARIA PLANNING REVIEWED BY DATE REDID PROVIDED C 3: rn REPAIR. E] GRADING C... o F NICE I IM 0 X Fri REMARKS C 0 DEMOLISH TANK 0 OTHER > o GAR CARPOGRET RETAINING WALL RENEWAL DOCKERY. USE, URINE OR ACT PLAIN: CHECKED BY "Y PC ION OCCUPANIff 0 -n n cup -4 2: Ad NUMBER OF NU DA UN SPECIAL INSPECTOR JAREA _GR OCCUPANT rR ITI np- HRED YES LOAD 0 DESCRIBE WORK TO BE DONE 0 REMARKS PROGRESS INSPECTIONS PER USC 1081FINAL INSPECTION REGID C E 0 M7 se X VALUATION $ LU z -4 Description FEE Description FEE 3: 0) P P, lan Check z HEAT SOURCE 11—ING 94 T LOT SLOPE % . I Building 6 C) J Z,17�(_l 1 TZ...ATE Pki Plumbing on G. Men Mechanical 0 PLAN CHECK NO:Cf,, THIS PERMIT AUTHORMES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE — DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCIDON ON THE PUBU 0 C OMAIN (CURBS, SIDEWALKS, DRIVEWAYS MARQUEES, ETC�) WILL Grading Recording Fee :3 REQUIRE t SEPARATEPERMiSSION. 2 Engr. Review City Surcharge PERMIT APPLICATION: INDAYS PERMIT &UNIT I YEAR - PROVIDED WORKISISTARYIED.11.114 180MAYS State Surcharge SEREACK IDK OF PINK PEA!LM FOR MORE INFORMATION 'APPILICANT. ON BEHALF OF HIS OR HER SPOUSE, HEIRS ASSIGNS AND SUCCESORS Traffic Mitigation Plan Chk Deposit IN INTEREST. AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF EDMONDS, SHINGTON, ITS OFFICIALS. EMPLOYEES, AND AGENTS FROM ANY AND Fire Review Receipt III ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY FR M THE ISSUANCE OF THIS PERMIT ISSUANCE OF THIS PERMIT HALL NOT BE DEEMED TO MODIFY, WAIVE OR REDUCE Fire Inspection Total Amount Due 415 ANY REQUIREMENT OF ANY TY ORDINAN E Cl C NOR LIMIT IN ANY WAY THE CITYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION, Landscapetnsp. Receipt # I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION: THAT THE INFORMATION GIVEN IS CORRECT, AND THAT I Am THE OWNER, OR THE DULY AUTHORIZED AGENT OF APPLICATION APPROVAL THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- CALL This application Is net a permit until signed by We TIONi AND IN DOING THE WOR NO PERSON WILL BE EMPLOYED THOR - 'S-E_bF Binding 011clalm hismor Dopmly: And Fees are paid, and IN VIOLATT LABOR" ON OF THE ':�UcGOfo1HETl.iATE WASHINGTON RELATING TO WORKMEN GA C 'S COMPENUNSURA CE AND RCYV 18.27. FOR INSPECTION ANilpt Is acknowledged Inspac, p—lood. C ,n DA� S:ILE";� (425) OFFtCjA ffGNAT O;z 771-0220 ATTENTION EXT 1333 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL 771-0221 A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 ORIGINAL - FILE - YELLOW INSPECTOR 10/01 FAX PINK - OWNER - GOLD � ASSESSOR F I N A L P W0- XE-C T-A-P PRO V A �LF 0 R M TO: DATE: — I I lEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE-.S 3 --C) ENGINEERING DIVISION DATE — PLANNING DIVISION DATE— PROJECT—CA3nffd'�E"' SITEADDRESS—� �7- PERMIT 4,.��.ADB#________pATE INSPECT DESCRIPTION OF WORK TO BE INSPECTED-5E4-L�� A field inspection was conducted to determine final compliance with approved plans. Final approval denotes that there are no objections from the above signed Department to the release of pE RMANCE BONDS and the granting of GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL wrrH CONDITIONS NOTED 0 Copy of CONDITIONS given to owner/contractor by inspector 1 FAILED FINAL INSPECTION - OUTSTANDING ISSUE S 0 copy of CORRECTION NOTICE given to owner/contractor by inspector 2. 3. RE GRANT FINAL PROJECT APPROVAL -INSPECTED OUTSTANDING ISSUES Date--- ocaprvi.doc.l:tenip.,bldg:for-10/01 z C M ma -4 0 0 0 M 0 -n n -4 3: M M 1 0 0 M M 0 z X z :0 , U5 z M .......... wall ................ Pier/Porch ................. z Retaining Wall Slab Insulation .......... PLUMBING: Underground ........... M Rough -in ............. M 0 Commercial Final C HEATING: M Gas Test ............. 10-1 a Gas Piping .; ............... > Equipment ................. f, Commercial Final "n EXTERIOR SHEATHING M M NAILING .......................... FRAMING ............ am (A FIRST FLOOR FRAMING... C) INSULATION .................. Floor Insulation Wall Insulation ........... z Calling Insulation y_a 0) SHEETROCK NAILING z SPECIAL INSPECTION ITI MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY ............... AMP