Loading...
20020221.pdfDATE PERMIT EXPIRES Dz CITY OF EDMONDS 0 N USE ON Z E ERMIT ZLy)Z 71 — (y NYMBER CONSTRUCTION PERMIT APPLICATION IT A P P L'CATION JOB A ADDRESS 'o, —) F/APT# A �D OWNER NAMEINAME OF BUSINESS ') 1. Cdr-- L FLAT NAMEISUBDIV]SiON NO, LOT 11, 11 NO, M62, 'd'I UD'FEE 5 "0- PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAI CITY TE�Ue I 990z 0 1 - EXISTING — PROPOSED— REQUIRED DEDICATION— FT — NAME METER SIZE LINE I'll NO. 01 FIXTURE' PIV "QUIRED I YESO No 13 I ADDRESS CITY ZIP IATELEPHONE REMARKS NERICON NAME ENGINEERING I ADDRESS FIRE REVIEWED BY CITY ZIP TELEPHONE , a . ON CU STATE INCENSE NUMBER EXPIRATION ATE C�'IEVCKE. BY INA IAR. E VN �0 0 RESIDENTIAL 0 PLUMBING/MECH ALL A.W.ITION 0 IL XO 1,11:1-:1-1:1T COMPLIANCE 0 n I ,nCHANGE OF USE 0 REMO DEL SIGN PARKING [RE 0 REPAIR 0 GRADIN a Cyne FENCE 0 1 X Fn REMARKS 0 DEMOLISH 0 TANK 0 OTHER o GARAGE CARPORT o RETAINING WALL RUCKERT 0 RENEWAL MPE OF USE, 1311� M�fil NUMBER "TIQAL OF 'sAS SPECIAL 1.13PECTCH STORIES IMISsa REQUIRED 0 YES DESCRIBE WORK TO BE DONE Flo..E.....l III DATE SHORELINE OR ADB# IN ON — —MET 7a, 13 NO HEIGHT A !so;; ALILOWED PRO GREG in M REQUIRED SETBACKS (Fr.) PROPOSED SETBACKS (FT.) 0 FRONT SIDE BEAR FRONT URSIDE REAR 0 C DATE M in z AREA P V > to 0 -n -n IT 111� in in 065 OCCU NT 0 LOAD 0 C OD MCI) DNS PER UBC 1108/FINAL INSPECTION REaD M 0 z 0) FEE Description FEE z 0 d 0 1171 AT'O "JA-VT-7 4-r— tl� De*j�i VALUATION $ V A U Description Plaft-G4tack k L ___7EAT -SOURCE OWING % LOT SLOPE % Building B Ild' Rg Plumbing LAN CHECK NO: -Zj VESTED DATE In P f ()2 Mechanical T THIS PERMIT AUTHORIZES ONLY THE WO K NOTED. THIS PERMIT COVERS WORK TO '0 k: HE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC Grading 1 g 2 R U 3 DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) W ILL SQUIBB t: SEPARATE PERMISSION. Engr. Review G PE MITAPPLICATION: INDAYS PERMIT UMPR I YEAR - PROVID D WORK IS STARTED WITHIN 180DAYS Engr. Inspection SEE SACK OF PINK PERMIT FOR MORE INFORMATION T.ff'C ffm.U. 'APPLICANT, ON BEHALF 0 HI OR HER SPOUSE, HE'RSF ASSIGNS AND SUCCESORS Traffic Mitigation FtNDSEMNIFY, IN INTEREST. AGREES TO DEFEND AND HOLD HARMLESS THE CITY OF - 50MOND1, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND Fire Review ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PEAMM ISSUANCE OF THIS PERMIT SHALL NOT 'I* Fire inspection DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY C TY ORDINANCE NOR LIMIT IN ANY WAY THE CITYS ABILITY TO ENFORCE ANY ORDI NANCE PROVISION. - I HERE ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION rINSPECTION GIVEN IS CORRECT, AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMP WITH CITY AND STATE LAWS REGULATING CONSTRUC. CALL TION; AND IN DOING THE WORKAUTHORiZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR WORKMENVE,�D�, RATION INSURANCE AND RCW 1OL27. SIGNED (425) -rE �OLr.'j 771-0220 AT'ttNTION EXT 1333 IT IS UNLAWFUL To USE OR O/CUPY A BUILDING OR STRUCTURE UNTIL 771-0221 A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFt, CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 FAX 10/01 City Surcharge State Surcharge Plan Chk Depo it Total Amount Due Receipt # APPLICATION APPROVAL t_"' 22'&j0z- 16INAL-FILE - YEU_6W,rNSPECTOR PINK -OWNER - GOLD -ASSESSOR FINAL ROJECT APPROVAL FO TO:_ DATE:_ MEMO To: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE— D. (L ja jEj:2Z ENGINEERINGDIVISIONDATE—�4�0 PLANNING DIVISION DATE — PROJECT SITE ADDRESS­L2� PERMIT # 2- - 0'--7 -2-L.. ADB#______--PATE INSPECTEZD 2- DESCRIPTION OF WORK TO BE INSPECTED---�—����� A field inspection was conducted to determine final compliance with approved plans. Final approval denotes that there are noobjections from the above signed Department to the release of P RF­X A W.-T? R an 9 E d the grantin of "GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WrIH CONDITIONS NOTED u Copy of CONDITIONS given to owner/contractor by inspector I FAILED FINAL INSPECTION - OUTSTANDING ISSUES cl Copy of CORRECTION NOTICE -given to owner/contractor by inspector 2, 3. RE_]NSpECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date_ Sign_ ochpivi.doc.l:teri3p:bldg:fomisIO/OI z 0 0 =i �n M M 0 00 C M M z JD C 0 -n n M M 0 V; 0 r- 0 M a 0) 90) Q 0 Z z Cn z M FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIR DEPARTMENTDATE— A ENGINEERING DIVISION DATE- 4&--,d---1�1PLANNING DIVISION DATE. SITE ADDRESS PERMIT# DATEINSPECTED DESCRIPTION OF WORK TO BE INSPECTE D A field inspection was conducted to determine'rinal, compliance with approved plans. Final approval denotes that there are no objections from the� above signed Department to the release of PERFORMANCE BONDS and the granting of: GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED u Copy of CONDITIONS given to owner/contractor by inspector FAILED FINAL INSPECTION - OUTSTANDING ISSUES c3 Copy of CORRECTION NOTICE given to owner/contractor by inspector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Si ocaprvi.doc.l:temp:bldg:fonrisIO/OI z 0 A 0 M ,4:9 V5 -4 D = C M M 0 0 0 C 3: M M z 0 n rn M W 0) 0 r- 0 M C Ca r 0) Q 0 Z r- -4 z Cn z 0 0 rn RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS .................. FOUNDATION: Footing ...................... wall ............... Pier/Porch ................. Retaining �Vall Stab Insulation .......... PLUMBING: Underground ............. Sough -in ................... Commercial Final HEATING: GasTest .................... Gas Piping ................. Equipment Commercial Final EXTERIOR SHEATHING NAILING .......................... FRAMING . ....................... FIRST FLOOR FRAMING INSULATION ............... Floor Insulation Wall Insulation ........... Ceiling Insulation SHEETROCK NAILING SPECIAL INSPECTION MISCELLANEOUS FINAL APPROVAL FOR 07-- OCCUPANCY .................. -FLA,%,Mtl� Z m am C m 0 80 C 3� K !", m m 0 1.4 0 _11 m m 065 ::" 0 0 ca M 0 ;0 z T 0) z m