Loading...
20020222.pdfDATE PERMIT EXPIRES CITY OF EDMONDS USE PERMIT HE NUIVIBER CONSTRUCTION PERMIT APPLICATION JOB SUITE/APT# OWNER NAMEINAME ADORE," --27- OF BUS FEES Y ZIP TELEPHONE EXISTING V' PROPOSED- 0 METER SIZE LINE SIZE NO-011IXTURES P�ol FE.Ulo��C I I ADDRESS REMARKS OWNERICONTRACTOR RESPONSIBLE FOR EROSION CONTROUDRAINAGE CITY TELEPHONE --4(rlV" NAME 1) ADDRESS FIRE REVIEWED By DATE z TSLEPHON 0 YES ONO )ao mc\ BETA REVIEW SIGN AREA HEIGHT 0 NEW RESIDENTIAL -EIN WEC- ALL.VlEG""'pF.`PGSED FRONT SIDE FEAR FRONT, URSI,�� REAR ADDITION COMMERCIAL OFUER CHANGE E go PARKING LOT AREA I PLANNING REVIEWED BY DATb/ x M lcal� � C GA AGE 8 d 01 N Fl&# - JOCCU LOAD 0 DESCRIBE WORK TO BE DONE c: REMARKS c F'GLIII'mi�- VALUATION FEE PLAN CHECK NG�� -6�- I IV..TEG DATE PLUMBING IRIS PERMIT AUTHO 1111 ONLY THE WORK NOTED, THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLYANY CONSTRUCTION ON TH E PUBLIC GRADINGIFILL DOMAIN JCURBS, SIDEWALKS, DRIVEWAYS , MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. IX PERMIT APPLICATION: 180 DAYS PERMIT LIMIT. 1 YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS SES SACK OF PINK PERMIT FOR MORE INFORMATION 'A PLICANT. ON SEHALrOF HIS OR HER SPOUSE. HEIRS. ASSIGNS AND SUCCESORS ENG, INSPECTION FEE IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF LANDSCAP NO E MONDS, WASHINGTON. ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND INSPECTION FEE A L CLAIMS FOR DAMAGESOF WHATEVER NATURE. ARISING DIRICTLYOR INDIRECTLY x FIT M THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE �,j DEEMED TO MODIFY, WAIVE 08 REDUCE ANY REQUIREMENT OF ANY CITYORDINANCE PLAN CHECK DEPOSIT 'E"'PTI 5 10 0 NOR LIMIT IN ANY WAYTHECIT 'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION,' TOTAL AMOUNT DUE RECEIPT SO I I HERESY ACKNOWLEDGE THAT � HAVE READ THIS APPLICATION, THAT THE INFORMATION GIVEN IS CORRECT, AND THAT AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF APPLICATION APPROVAL THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING C STRUC I CALL HON AND IN DOING THE WORK AUTHORIZED THEREBY, NO PEAS I IN VIOLATION OFP F THE STATE OF WASH] NGTON RE ATING TO FOR INSPECTION '-Pl'-�-Xdp -.p--d, 771-0221 PECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 FAX PINK OWNER . GOLD - ASSESSOR 5198 Tonkin Hoyne Lokan ARCHITECTURE & URBAN DESIGN 204 FIRST AVENUE SOUTH SSATTLE,WASHINOTON9M4 �110N-- FAX; (a0,)0a2_j76b Aker's House Remodel 1047 Bell Street 0­1. a, N11— 1047 Bell St­t Ed—ds. W4�h ��t- Site sk-1 --2127,02 FINAL PROJECT APPROVAL FORM TO: DATE: M[EMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTMENT DATE __�ENGINEERING DIVISION DATE2k4--' PLANNING DIVISION DATE PROJECT�__ N-e-a_-,or) z 0 0 CM SITEADDRESS �7 PERMrr#060-2,- XDB# —DATE INSPECTED�_'? (Tl—> M0 0 -q 0 0 C 3: M DESCRIPTION OF WORK TO 13E INSPECTED ro M z r- -4 A field inspection was conducted to determine final compliance with approved plans. Final approval denotes that there are no objections from the above signed Department to the release of q n PERFORMANCE BONDS and the granting of: n M M GRANT FINAL PROJECT APPROVAL 0 0 0 C Cn 9 cn rn 0 z 7q ;U GRANT PROJECT APPROVAL WITH CONDITIONS NOTED > u Copy ofCONDITTONS given to owner/contractorby inspector z 1. ca z 0 FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 a Copy of CORRECTION NOTICE given to owner/contractor by inspector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Si ocaprvi.doc.l:temp:bldg:fonasIO/OI RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ................. Wall .......................... Pier/Porch ................. Retaining Wall ........... Slab Insulation PLUMBING: Underground ; ............ MS Rough -in ................... Commercial Final HEATING: Gas Test Gas Piping ........... Equipment ................. Commercial Final EXTERIOR SHEATHING NAILING ... ....................... FRAMING ........................ FIRST FLOOR FRAMING INSULATION -4 ................... Floor Insulation Wall Insulation ........... Calling Insulation S­ V SHEETROCK NAILING SPECIAL INSPECTION MISCELLANEOUS .......... FINAL APPROVAL FOR IS, Z OCCUPANCY .................. z 0 M C ITI 0 0 --I ITI Z, O'n n MITI 0 0 Fn C 0) C 0) ITI 0 z �2 55, z 9 0