Loading...
20020249.pdf--I DATE RECEIVED CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION E�NAUEINAME OF BUSII ESS f. 6i IN ADDRESS �C)'7 J�Ljt LJ S A 0 3 3 E ZIP PERMITEXPIRES 51 ONE PE M T UR N NIVR�/W-- -11V %SUITEJAPT# ODRESS 61, ?p -7 PUT NAMEISUBDIVISION NO. LOT 110, Ll No I LID FEE $ PUDLIC RIGHT OF WAY PER OFFICIAL STREET MAP ""' —15, 8 EXISTING — PROPOSED— al -I do. —.1 road, 11-ead owned 13 lor-e—eak a REQUIRED DEDICATION— FT — METER SIZE LINE SIZE NO. OF 1DTG.ES PFIV REQUIRED I I ES 0 NO 0 1 )WNERICONTRACTOR RESPONSIBLE FOR EROSION CONTROLID NAGE I i,, M1 1pj Bp I�RESENT F:('- REVIEWEkPTE ADDRESS ENGINEER"UK FILL, REI A' -�-o- 1`755-3 0A), Fl E REVIEWED By DATE CITY ZIP I TELEPHONE Out STATE LICENSE NUMBER 'N DAT EXPIRATION DATE CHEC1111 BY SPECTION IPSOND VAR11 NCE OR C SHORELINE OR ADS# IN RE16 OSTEE 13 " Ac-,e-+ rD H L-2- - 144 0a, MW r3YES -HEQHT PROP7 TAeA:�.U�E IN 0 SEPA REVIEW SIGN AREA COMPLETE 1) ALLOWED PROPOSED 5 EXP , 7PT 0 NEW E?`RE6IDi 0 PLUM-BING' I MECHH LOT COVERAGE REQUIRED SETBACKS (FT.) PROPOSED SETBACK$ (Fr. ALLOWED PROPOSED FRONT SIDE BEAR FRONT LIFIIUE FEW C MPLIANCE OR ADDITION COMMERCIAL o CHANGE OF USE REMODEL APARTMENT 0 SIGN PARKING I LOT AREA A�EVI D RIEDD I F..Vl.tD 0 REPAIR 0 F NCE 0 GRADING LYDS X Fn REM-1- 0 DEMOLISH 0`TANK - OTHER GARAGE CARPORT RETAININ WALL El ROCKERYG [:1 RENEWAL (ME OF USE, BUSINESS OR ACTIVITY) EXPLAIN: L& S -T IZE_V'Ab VC� I CHECKED BY ITY COURAN; =N IC!2 1. Up NUMBER OF NUMBER 11 DWELLING IIEITAICIL AR a SPECIAL INSPECTOR 3CCUPANT 0' STORIES UNITS NUMSEd-02-- JAREA REQUIRED [-] YES LOAD DESCRIBE WORK TO BE DONE yo 6A I REMARKS PROGRESS INSPECTIONS PER USC 108/FINAL INSPECTION REOD S 'T '14 Vv�ov,:A U Description FEE Description FEE Plan Check HEAT SOURCE GLAZING % LOT SLOPE % Building L Plumbing Mechanical THIS PERMIT AUTHORIZES ONLY THE ORK NOTED. THIS PERMIT COVERS WORK TO t: HE COME ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC 2 Grading Recording Fee M 011i (CURBS, SIDEWALKS, DRIVEWAYS ETC.) WILL REQUIRE 0 SEPARATE PERMiSMARW ,QQUEaS, Engr. Review City Surcharge PE MITAPPLICATION: INDAYS PERMIT UMM. I YEAR -PROVID 0 WORK ISSTAPTEDWITHIM 100DAYS Engr. Inspection State Surcharge SEE BACK OF PINK PERMIT MR MORE INFORMATION ON BEHALF (11 HIS OR HER SPOUSE. HEIIII, ASIIGNI AND eUCCEsORS Traffic Mitigation Plan Chk Deposit .REST. AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF IN INTE EDMONDS, WASHINGTON, ITS OFFICIALS. EMPLOYEES, AND AGENTS FROM ANY AND ALL CLAIMS FOR DAMAGES 0 WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY Fire Review Receipt III FROM THE ISSUANCE OF THIS PERMIT ISSUANCE OF THIS PERMIT SHALL NOT BE Fire Inspection Total Amount Due DEEMED TO MODIF)� WAIVE OR REDUCE ANY REQUIREMENT OF MY CITY ORDINANCE NOR LIMIT IN ANY WAY THE CRYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION,' Landscapolnsp.1 Receipt # IHERESY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION� THAT HE INFORMATION APPLICATION APPROVAL GIVEN IS CORRECT. AND THAT I AM THE OWNER, OR THE OULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTHUC� CALL are., a Parnalt.untila.go.cil by the TION; AND IN a DING THE WORK AUTHORIZED THEREBY. NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR ODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION B'111hisappli DP,,Y. a ding Galicia] a, hicM., are paid, and receipt is acknowledged In space provided. WORKMEN$ COMPENSATION INSURANCE AND RCW 18.27. OF I DATE SIGNJUR� (OW�ER OR( DATE SIGNED (424) w i �tul, 7 -0220 71 RELEASED 1Y' DATEf ATTENTION EX`r 1333 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL 771-0221 I A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- ORIGINAL - FILE - YELLOW - INSPECTOR CATE OF OCCUPANCY HAS BEEN GRANTED. USC SECTION 109 FAX PINK - OWNER - GOLD - ASSESSOR 10101 —likN IIIIIIIIIIIIIIIII01 z 0 M C M0 0 0 C IT, IT z jO--I Cf) o -n M M y 0) 0 o Fn C ca C ED M 0 z z 6 IT Aug 13 02 10:21a Budget Tanks 2OS3069061 F.1 BUDGET ENVIRONMENTAL SERVICES (A D"Jon of Baftet Timk Itowmi & Envirsut�ftl Senk9% In&) 5W — 14'b Avenue N.W. Seattle, Washington 98107 206-789-5500; 800-545 -9228 - Fax: 206-306-9091 June 24,2002 Annie Carney z 9307 - 230 Street S.W. M Seattle, Washington 98020 =i RE: CONTAMINATED SOIL/WATER REMEDIATION REPORT AND SITE ASSESSMENT FOR: PROJECT SITE: 9307 - 23,ff STREET S.W., EDMONDS, WA M M a Dear Ms. Carney: 0 C Budget Environmental Services (Budget) is a licensed, bonded and insured environmental m rn construction and consulting firm, specializing m environmental issues surrounding sod and > water contantination caused by leaking underground storage tanks (USTs). Budget r- -4 contracted dimctly with Annie Carney to perform professional services on the above referenced Project Site. Budget's services regarding the Site included a preliminary 0 -n contaminated site assessment, pumping petroleum contraninated ground water from the excavat ion, excavating the area ofconturninated soil, taking soil and water samples in several m M t " different locations ofthe excavation, having the soil and water samples analyzed for backfill 065 0 contamination, backming the excavation with rock and/or other clean material and 0 compacting the backfill material. C C Q) Excavation activities were directed at removing soil which contained concentrations oftotal petroleum hydrocarbons MM exceeding the Model Toxics Control Act's (MTCA) soil cleanup level of2,000 milligrams per kilogram (mg1k&) or parts per million, ppm. z Backaround Idonnation: On April 10, 2002, Budget removed a 300 gallon UST that previously contained heating oil z (diesel ofl) from the Project Site. Budget determined that the 300 gallon UST had leaked diesel oil Into the soil and the ground water underneath the UST, The determination that In 20630GS061 P.2 Ms. Carney June 24, 2002 Page 2 the oil tardt had leaked was visually obvious due to the bluish -gray discoloration of the soil in YWOUS area ofthe excavation. Upon kspection, Budget observed several holes in the UST. In addition, when the tank was removed, a diesel oil sheen could be seen on top of the water within the excavation. Moreover, a haW grab of the sod underneath the tank smelled heavily of diesel oil. Through field observations and experience, the heavy small of diesel oil in the soil was presumed to exceed NICTA's 2,M ppm, cleanup leveL Following the tank removaL Budget pumped all the ground water from the excavation. Budget allowed the excavation to remak open so that it could collect ground water for water sampling purposes. On April 11, 2002, Budget collected a ground water sample from the excavation and labeled it asH.I. See SoillWater Sample Site Map attached hereto as Schedule A. Thewatersample was preserved and transported according to standard chain of custody procedures. The sample was talmn to Friedman & Bruya, Inc. which is a Washington State Certified Testing Laboratory qualified to perform a Northvvesl Total Petroleum Hydrocarbon - Diesel Extended (NWTPH-DX) analysis. The water sample indicated a TPH concentration of 3,300 parts per billion or 3.3 ppm. See Schedule B. Soil and Water Sample Analysis attached hereto. U rider Washington's Model Toxic Control Act, TPH concentrations cannot exceed .5 plan in the ground water According to Washington law, the ground water is the property of the State of Washington, Because the ground water was negatively impacted with TPH concentrations above the .5 ppin threshold, an environmental cleanup was required to get the TPH concentraflons to levels below.5 ppm Budget had also extracted a soil sample and labeled it as B-1. The soil sample was preserved and transported to Friedman & Bruya, Inc. to be analyzed for TPH concentrations. The Soil sainple indicated a TPH concentration of4,100 ppm. See Schedule B, Soil and Water Sample Analysis. Removal Of -ContaminaW Soil and C -11round Wat From June 6, 2002 through June 7, 2002, Budget removed 5 t.32 tow ofpettokum contaminated soil (.PCS) containing diesel oil was excavated from fite Site and transported to Rabanco, Recycling Company in Seattle, Washington. Robanco tramported and disposed of the PCS at their Roosevelt Regional Landfill Center located in Roosevelt, Washington. Rabanco Recycling Company is a Washington State licensed and registered waste disposal Z 3: Om C MO 0 80 C m To F i;' 0 4 O,n ME mm 0 0 0 C 0' m 0 Z Z -4 CD Z 0 0 m Aug �3 02 10:22a But at Tanks 20030GSOBI p.3 Ms. Carney June 24, 2002 Page 3 After excavating the Site ofPCS, it was determined that all ofthe contaminated sod at :p 21 actionable levels under the MTCA standards was removed frozatbe excavation. See Schedule Z: A and B. Throughout the excavatioI36 the soils encountered consisted ofsmall gravels, fine to 9� course sand and clay 0 m V4. After the excavation recharged with water, a water sample was extracted and labeled as 2- =4 'Honppbor.250ppmof H2o water sample 2-H20 revealed that less than 250 parts per bd 5 TPH was in the sample. See Schedule B. Accordingly, under the MTCVs cleanup threshold 0 M and under the standards established by the Washington State Department ofEcology, which C M D are unplemented during petrokum contaminated sod and ground water remediation, no is for Project Site. -40 0 0 C further cleanup action required the M M ate Amssmat— Based upon the observed conditions� the cleanup procedures and standards utili2ed and the soil and water sample test results for the Site at issue heWma, it is Budget's professional 55 unaccept opinion that all TPH contaminated sod and ground water at able levels of 0 -n 11 P� contarnination under the Washington State Department ofEcology (WA -DOE) and the JW, MCTA guidelines have been removed from the exc avation at the Prqject Site and that no M M further cleanup action is required. V) 0 �O Limitations ofSM& And Assessment C o) M 0 The observations ofthe excavation and the soil mid water sample test analysis was limited to 7-4 theexcavatedarea. Conditions outside the excavation may vark from those observed. A potential always remains for the presence ofunknown, unidentified, unexpected, or unforeseen surface or subsurface contamination, or adverse sulonfice conditions. Further z evidence against such potential site contamination or adverse conditions would require x z 0 M Rug 13 02 10:23a Budget Tanks 2063069061 p.4 Ms. Carney June 24,2002 Page 4 appropriate subsur6ce exploration and testing. The conclusions, expectations and 'R recommendatiorug presented in this report are our proftsiond opinion based on our I interpretation ofifforniation available to us, No warranty, express or implied, relating to our z 01. opinion herein is made. m Very truly youts, BUDGET ENVIRONMOMAL SERVICES (a in M C: Matthew P. Vecdar /Washington State Certified Site Assessor m Enclosures -Dick WA C z cc Storey, -DOE om� M m 0 0 a m r C& M X i�� Z 0 ? m 4 FINAL PROJECT APPROVAL FORM TO: DATE: NEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: —FIRE DEPARTMENT DATE_q:_��O ENGINEERING DIVISION DATE PLANNING DIVISION DATE PROJECT SITE ADDRESS --q-34-0 a ?!q PERMIT 9- OLI,-). 2-a_�_ADBit_DATF INSPECTED� Z(--7 d_::!� DESCRIPTION OF WORK TO BE INSPECTED_U&!_������ A field inspection was conducted to determine final compliance with approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORAWCE BQNDS and the granting of: GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED 'if, Copy of CONDITIONS given to owner/contractor by inspector FAMED FINAL INSPECTION - OUTSTANDING ISSUES a Copy of CORRECTION NOTICE given to owner/contractor by inspector 1. 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date_ Sign, ocaprvl.doc.l:tenip:bldg:fonnsIO/OI z 9 0 C M MO -1 0 0 0 C --i ?. = M M� z 0 -n M M 0 0 a 'Mo M 0 Z X z CD z 0 i 0 M RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: 'Footing ............ Wall ........... Pier/Porch ................. Retaining Wall Slab Insulation .......... PLUMBING: �n Underground ............. -4 M Rough -In ................... M 0 Commercial Final 0, C -4 HEATING: M ITI Gas Test .................... Z, C — Gas Piping ............... Equipment ............. 'n Commercial Final EXTERIOR SHEATHING M NAILING .. ........................ 0 r- FRAMING ............... 0 171 FIRST FLOOR FRAMING Q 0 INSULATION ................... Floor Insulation Wall Insulation ........... z Ceiling Insulation SHEETROCK NAILING z SPECIAL INSPECTION M MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY Ek ............ .... w