Loading...
20020267.pdf.1 AM DATE RECEIVED L CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION ZIP PERMIT EXPIRES USN E M T ZO'E PN UR NISERPI�TZd JOB SUITEIAPT# ADDRESS IV _,�01 12,1 PLAT NAMEISUBDIVISION NO.____17� UDNO� LID FEE S PUBLIC NIGHT OF WAY PER OFFICIAL STREET MAP EXISTING — PROPOSED— '�raan .I. REQUIRED DEDICATION— FT — METER SIZE LINE 1111 110. 01 11—REI I- REQUIR D I 1 YES E3 NO 0 REMARKS OWNERMONTRACTOR RESPONSIBLE FOR EROSION CONTROUDRAMIAGE AODW`._N ENGINEENIN.1 EVIIIIal�PlDfl required on fuel-burniftag nInces in t. _T AE,,EW b" 8"DATE C zip iLEPHoN TT E VARIANCE OR CU SHORELINE OR ADS# INSPECTION RE -0 OYES C3NO 1 10 1 POSTED STATE LICENSE NUMBER EXPIRATION 1ATEa D 4 PROPERTY TAX ACCOUNT PARCEL NO. (1f5t_11 ( Q=C)(!:) & oc) SEPA REVIEW COMPLETE EXEMPT EXP I SIGN AREA ALLOWED , PROPOSED HEIGHT ALLOWED PROPOSED I PUNS- "P6E .... NTIAL .fir"FLU.111N. I E-- n ADDITION COMMERCIAL Ei C MPLIANCE OR CHANGE OF USE REMODEL APARTMENT REPAIR GRADING El SIGN 0 FENCE i _ X FT) DEMOLISH 0 TANK 0 OTHER [I GARAGE (3 RETAINING WALL CARPORT ROOKERY RENEWAL I- COVERAGE ALLOWED PROPOSED REQUIRED SETBACKS IFT) FRONT SIDE RUN PROPOSED SETBACKS (FT.) FRONT URSIDE REAR A PARKING I EO'D I PROVIDED LOT AREA PLANNING REVIEWED By DATE REMARKS 11 IF 111, 11111101 A 11PP11: NUMBER NUMBER OF jr CRITICAL AREAS OF DWELL IW— a' STORIES NITS ING NUMBER CHECKE..Y JTY��� I.tj SPECIAL INSPECT( REQUIRED 0 yE DESCRIBE WORK TO BE DONE REMARKS PROGRESS INSPECTIONS PER UBC IGO/FINAL INSPECTION REOD M Y WYN I Description FEE Description FEE Plan Check HEAT SOURCE GLAZING LOT SLOPE PLAN CHECK VEIIEII DATE Plumbing Mechanical THIS PERMIT AUTHORIZES ONLY THE ORK NOTED. THIS PERMIT COVERS WORK TO t: BEDDNEONPRIVATEP OPERITY ONLV. ANY CONSTRUCTION ON THE PUBLIC X Grading Recording Fee DOMAIN ICUPSS, SIDEWALK$, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATEPERMISSION. PERMIT APPLICATION: INDAYS Engr. Review City,9urcharge PERMITUMMI YEAR -PROVIDED WORK IS STARTED WITHIN ISODAYS Engr. Inspection State Surcharge SEE BACK OF PINK PERMIT FOR MORE INFORMATION 'APPUCAYT ON BEHALF OF HIS OR HER SPOUSE, HE AS. ASSIGNS AND SUCCESORS Traffic Mitigation Plan Chk Deposit IN INTEREST' AGREES TO INDEMNIFX DEFEND AND HOLD HARMLESS THE CITY OF EDMONDS. WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND Fire Review Receipt # ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY FR M THE ISSUANCE OF TH S PERMIT ISSUANCE OF THIS PERMIT SHALL NOT BE Fire Inspection TotalAmountDus DEEMED TO MODIFY I OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE NOR LIMIT IN ANY WAY THE CITYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION.- 7 15 - Landscapainsp.1 I Receipt # 7N I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION� THAT THE INFORMATION GIVEN IS CORRECT AND THAT I AM THE OWNER. OR THE DULY THOAIZED AGENT OF — APPLICATION APPROVAL T E OWNER, I AGREE To COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC. CALL This application 1, net a Pamir until signed by Me TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED F THE LABD CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION Building Ol%lal or his/he, Deputy: and Fee, are puld, j r .. pro.clun-ledgdi—p ... p—ldixf, RKMEN'S OMPENSATIO==A3 Now 1827. OFFlqfAL, 1='A 0 1 DATE SIGNED Zj:]Z�� (425) 71 /!//N- - - - 7 771-0220 -IFLEA1. .1 /DATE' AT-TENTION EXT 1333 IT IS UNLAWFUL To USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL 771-0221 A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- ORIGINAL FILE YELLOW - INSPECTOR CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 FAX PINK - OWNER GOLD - ASSESSOR to/01 z 0 0 Fh -4 In 0 0 0 C ITI m z C Z 0 _11 m m In 0,0 0 M C Ch C 0 M 0 z x 0) z 0 In . ......... z wall Pler/Porc�h . .............. M Retaining Wall ........... Slab Insulation .......... PLUMBING: a ITI M 0 Underground ............. -40 0 C: Rough -in ................... X M M 0 Commercial Final HEATING: fns 4- 0 Gas Test .............. 0 Gas Piping— ............... VIS 3: Equipment ............. M I'll Commercial Final 0 0 a fit EXTERIOR SHEATHING MCA Q 0 NAILING ................ z FRAMING ........................ j FIRST FLOOR FRAMING INSULATION ................... z Floor Insulation Wall Insulation ........... z 0 Ceiling insulation 0 M SHEETROCK NAILING SPECIAL INSPECTION MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY ..................