Loading...
20020278.pdfPERMIT EX ES USF, IE ZON RNI-T CITY OF EDMONDS ,2 CONSTRUCTION PERMIT APPLICATION 10. SUITEIAFT� ADDRESS 01 2UIIIE91 A, Vo PLAT NAMF,SUUOIVi5ION NO, LOT NO. L NO. L�D MAILING ADDRESS 0 FEE $ RICH r OF WAY PEP OFFICIAL STREET MAP TESCP Apl-d I -I ?A'lk A- R1 N_ B CITY EXISTING — PROPOSED 0 REQUIRED DEDICATION— PT NAME METER SIZE LINT��7 NO. OF FIXTURES RV REQUIRED Uw\ks I YE 0 NO ADDRESS R MARKS OWNERICONTRACTOR RESPONSIBLE FOR EROSION CONTROUDRAINAGE \1\ ox amN CITY ZIP TEL PHONE RMr�:M6 _iOM -Ric (5)FIMAL- NAME ENGINEERING REVIEWED/DATE ADDRESS D. At CITY ZIP TELEPHONE FIRE REVIEWED BY DATE oez­k Aa .5- STATE LICENSE NUMBER EXPIRATION DATE CHECKED BY VARIANCE OR DO SHORELINE OR ADBJ0 INSPECTION No all JPBO OSTED c c) o czs ii OYRE ES - M40 — SERA SIGN AREA PROPERTY TA ACCOUNT PARCEL NO. REYIEW HEIGHT COMPLETE EXEMPT ALLOWED PROPOSED A I '_ I 'o I�ID NEW VRESIDENTAL 5ePLUMBINGIMECH LOT ';OVERAGE REQUIRED SETBACK$ (FT,) PROPOSED SET8ACKS(PT) B'ADDITION 0 COMMERCIAL o COMPLIANCE OR CHANGE OF USE ALLOWED PROPOSED FRONT SIDE REAR FRONT UPSIDE REAR '�3 7 9 _5'7 Z31 I L9 575� f7 REMODEL F1 APARTMENT C3 SIGN PARKING LOT AREA DATE ED By REQD PROVIDED y3b 2 2- 11, V� �+/$ I/./ I REPAIR C] !Zg�' CYUS C3 PENCE X FT� - REMARKS DEMOLISH TANK OTHER GARA.G�ET CARP 0 FIEOTAKINING WALL -NEWAL R 0 ERY 0 RE (TYPE OF USE, BUSINESS OR A�1111 All: '5 =TYP. .1WH.. Cqj OUPAN OR Up To, NUMBER NUM ER.F OF DWELL NG U NTS -b -ft OCCUPANT 0 STORIES DESCRIBE WORK TO BE DONE QV REMARKS PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION RED'[ :ttr&.AAftf_ 195'lix "pry- &ae I 6A-ry A4 ? 2nt nAl f-� 0 Ae a VALUATION FEE PLAN CHEC K FEE OPE ' JT_ UILDIN.I/, PLAN CHECK NO: 11EIT11 11 PLUMBING MECHANICAL THIS PERMIT AUTHORIZES NLY THE WORK NOTED. THIS PERMIT COVERS WORK P t: BE DONE ON PRIVATE ROPERTY ONLY, ANY CONSTRUCTION ON THE PUBLIC . GRADINOFFILL DOMAIN :3 (CUBES. SIDEWALKS, DRIVEWAYS, MARQUEES. ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT APPLICATI N: 180 DAYS PERMIT LIMIT. 1 YEAR - PROVID D WORK IS STARTED WqH;N 180 DAYS SNG� REVIEW FEES SEE SAC OF PINK PERMIT FOR MORE INFORMATION PLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS ENG, INSPECTION FEE _z ;A N NTEREST. AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY F LANDSCAPING M EDMONDS. WASHINGTON, ITS OFFICIA,L�, EMPLOYEES. AND AGENTS FROM ANYAND INSPECTION FEE ALLCLAIMSFORDAMA E OFWHATEVER NATURE, ARISING DIRECTLYOR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT 8: PLAN CHECK DEPOSIT IRECEIPT 0 5MEDT0 MODIFY. WAIVE OR REDUCE ANY REQUIREMENT OFANY CITY ORDINANC ANYWAYTHE 0 NOR LIMIT IN CITY�SABILITYTO ENFORCE ANYOFICIINANCE PROVISION.- TOTAL AMOUNT DUE R C E I P T Z' I HEREBY ACKNOVVLEI�GIZ THAT: HAVE READ THIS APPLICATION, FILAT THE INFORMATION GIVEN IS CORRECT. AND THAT AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF APPLICATION APPROVA THEOWNE . I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC. CALL 111111,1111n j. P., . '.-1 ­0 Aq- b, TION, AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMI DYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO ­0 .""T1110"'.. FOR INSPECTION ,­pt i, ,kF,,JodgQ_ Np... ==?APEN±S tANCE AND RCWIS.27. OFF1 LS SIGNATURE DATE T) SIGNED (425) c I 771-0220 a, 44 �AT A17ENTION EXT 333 7 IT IS UNLAWFUL To USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL 771-0221 - A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- ORIGINA L PILE YELLOW WSPECTZR CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 FAX F$NK - OWNER GOLD - ASSESSOR 5,98 z 0 F1 , , om C: ma 0 0 IT, m z 0-4 c E: :� 0 MITI a 0 0 M C v) m 0) M 0 z z z 0 m f Height Calculation Worksheet Address: Date: D Inspector(s): 1. Datum Point: SS 2. Datum Point Elevation: L) C-" - 0� f 3. Average Grade: 0 5, 0 K 4. Maximum Elevation Allowed: Ll��"—�-Verag, grade) + 25' -1 S ro in 5. Reference Point Elevation Shot to House: in 0 0 C: (datum elevation)+ tO.dq (grade to transit,level line shot to house) (0 in 6. Measurements from line shot onto house to roof ridge: Z; K Cn 0 -n in a as, or, m C-): 35 z Total 5L, 9 0 in 7. Actual Elevation: (reference voint elevation) + easurements from #6) Conclusion: 0 65 (actual) is greater hfe—s—s —thb-, lowed); therefore the house is/ is not over the height requireme.1—p—er ECDC 16.20.30 requirements L:\TEMP\BUILDlNG\MlSC\Height Calculation Worksheet.doc IMPERVIOUS SURFACE C.4,11CS Existing Re-sidence: 9 10 SQ. FT. Existing Back Covered Deck 260 SQ, FT, /10 7 T-Nisting Back Patio. 270 SQ. FT. /9-sD Existing Garage: 1000 SQ. FT, 190f NORTI E'.xisting Shed: 240 SQ, ff. 1-7,SV SCALF� 1**�-�20%0* Fxisting Driveway 106().SQ, FF. 1-?SV- 1�v% "Fig 4 0% -7 P-s -8 z HEIGHTCALCS 0 :d A=+1W 0� + c=+4-w 1*19.7c 24 10 SQ. 17, (203T!,;) 7, f�. -YjARFA LQ om C �1'il AVE GRADE -- 4"", 11 �830 SQ, FT. m 0 TUAL:� 122.59' 0 MAXIMLIM 430.197 173,0' m m C Gn"v tow =vT OWNER/CONTRACT0H i��, RESPONSILE FOR AO EROSION CONTROL AN[) ORAINAGE T. 0 n P, ADD GUTTEf is/DowNspoups + to(> r m m 0 AND Spbk 0 Fn C wo EAG M, p ri �r '&P jO Q(C- A PC C ED SURFACES TO UCOVE �tq z B I D WITHIN 2 DAYS ;4 z TEMPORARY CONSTRUCTION a -05.750_. ;L 0 m EUTRANCE REQUIRED OVED AS IN I 'PROPOSEDADWN I STSTORY - 498 SQ, Fl. Date: + 2ND ISTORY��z 03 SO. F'r DATVM PT. - 100' TOP OF SS e� SITE Msk)l STLVE& LINDA (ABLEA MANHOLE COVER '4314 QNI) AVE, W APPROVED BY PLANNING EDMONDS, WA 4 E)NINWId Ag (13A0HddV -171 FINAL PROJECT APPROVAL FORM TO - DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: --FIRE DEPARTMENT DATE�—� ENGINEERING DIVISION DATE—LAI� PI, G DIVISION DATE— PROJECT - SITE ADDRESS- A/ iM PERMITO ADBO DATE INSPECTED DESCRIPTION OF WORK TO BE INSPECTE A fleld inspection was conducted to determine final compliance with approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE _BONDS and the granting of: 4GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITTI CONDITIONS NOTED u Copy of CONDITIONS given to owner/contractor by inspector 1. FAILED FINAL INSPECTION - OUTSTANDING ISSUES u Copy of CORRECTION NOTICE given to owner/contractor by inspector 1. 2. 3. RE-INSpECTED OUTSTANDING ISSUES GRANT FINAL PROJECT APPROVAL Date_ Sign_ ocaprvi.doc.l:tenip:bldg:fonnsIO/O1 z 9 F5 R1 M M 0 80 M M z ID C') 0 -n -n M M a 0 0 Q 0 Z z --I z 0 4 0 M FINAL ROJECT-APPROVAL FORM TO:_ DATE:_ WMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: —FIRE DEPARINIENT DATE— a--ENGINEERINGDMSION DATE z —PLANNING DIVISION DATE -- PROJECT— 0 M C: M SITE ADDRESS -10 00 ATE INSPEC PERmrr #-YAQL--aLL0—)ADB# DATE INSPEC M M Z DESCRIPTION OF WORK TO BE 1 NSPECTED -4 A neld inspection was conducted to determine rinal comPli ance with approved plans. Final approval Cn o n denotes that there are no objections from the above signed Department to the release of. "n PE A_NCEBONDS- and the granting of: M M 0 V5 FINAL PROJECT APPROVAL 0", co co -�LGRANT 0 GRANT PROJECT APPROVAL wrm CONDITIONS NOTED z a Copy of CONDITIONS given to owner/contractor bY inspector z 3 M FAMED FINAL INSPECTION - OUTSTANDING ISSUES c Copy of CORRECTION NOTICE given to owner/contractorby fiWector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date— Sigil— omprvi.doc.l:tm*-.bldg:formsIO101 INSPECTOR DATE APPROVED \YNS SETBACKS .................... FOUNDATION: < Footing................ wall ................ Pier/Porch ................. Retaining Wall ........... z Slab Insulation 0 PLUMBING: Underground M Rough -in ................... C M 0 Commercial Final 0 C HEATIN& ITI Gas Test .............. z jo Gas Piping Equipment ................. 0 -n Commercial Final EXTERIOR SHEATHING III M a NAILING .......................... V; 0 0 Fn FRAMING ................ C: Co FIRST FLOOR FRAMING ITI 0 INSULATION ............ Floor Insulation Wall Insulation ........... z Ceiling Insulation z SHEETROCK NAILING SPECIAL JVSPECTION (VIS 0 M MISCELLANEOUS