Loading...
20020293.pdf*&*FDAIE RECEIVED RES USE PERMIT ZONE CITY OF EDMONDS NUMBER CONSTRUCTION PERMIT APPLICATION jo B EU111A1T' ADDRESS ;;ME71 ,;E LID N MAILING ADDRESS FLAT NAMEISUBDIVISION NO. LOT No* 11. FEE $ PUBLIC RIGHT OF WAY PER OIFICI L STREET MAP es.., ... Psoon end CITY ZIP EXISTING — PROPOSES— .­n. R.-Ined ITELEPHONE s—s—s- REQUIRED DEDICATION— FT — ­­d oft'sou— iL-L I PRV REQUIR D NAME METER SIZE I LINE Ii� _YES 0 NO 0 . ADDRESS ..MARKS OWNERICONTRACTOR RESPONSIBLE FOR EROSION CONTROUDRAINAGE Mw P.7 C/ �Z"':"e ENGINEERING REVIEWED7DATE ADDRESS FIRE REVIEWED BY DATE T --P..NE "J -e. 3 c a STATE LICENSE NUMBER EXPIRATION DATE CHECKED BY VARIANCE DR CU SHOREUNE OR ADS# INSPECTION OSNG REQ'D 11 TIED 13YES aNO PROPERTY TAX ACCOUNT PARCEL SEPA REVIEW COMPLETE EXEMPT SIGN AREA HEIGHT ALLOWED PROPOSED ALLOWED PROPOSES at EXP , NEW PLUMBING t MM� LOT COVERAGE REQUIRED SETBACKS (Fr.) PROPOSED SETBACKS (FT. ALLOWED PROPOSED FRONT SIDE REAR FRONT US SIDE HEAR AGINT NJ 0 I. COMPLIANCE OR CHANGE OF USE PARKING Or ARIA PLANNING 1EVIEW10 By DATE 0 R BE SIGN REaD I PROVIDED 0 REPAIR GRADING CYSS FENCE ( X Fn REMARKS 0 DEMOLISH TANK OTHER GARAGE RETAINING WALL CAR PORT ROOKERY RENEWAL "PE OF USE. BUSINESS OR ACTIVITY), EXPLAIN: OF Cc SZCTION CO� OCCUPA5 GROUP NUMBER GL OF N MIE".OF DWELL N 01ITIOAL A SEAS AREA OCCUPANT se 0 STORIES UNITS N UMBER PIP\- REQUIRED "S LOAD DESCRIBE SEADNE / REMARKS i'� ROGRESS INSPECTIONS PER UBC 1081FINAL INSPECTION REaD Ldry ct, I.&I t-ce f./i RIC I I D.—IndilIon I FEE I Description I FEE i Plan Check I HEAT SOURCE GLAZING I LOT SLOPE I Lnkhng PLAN CHECK VESTED DATE I VGrading Mechanical THISPERMITAUT BRIMS ONLY THE WORK NOTE"THISPERMSTCOVER WORKTO 1: BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC Ing Recording Foe W IRS DOMAIN ICURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL... SEPARATE PERMISSION. Engr. Review City Surcharge PERMIT UMM I YEAPR"PRTOAVIPD'UDCWATG'ROKM:IS'SWTADFArYM'D WITHIN 180 DAYS SEE BACK OF PINK PERMIT FOR MORE INFORMATION Engr. Inspection State Surcharge 'APPLICANT ON BEHALF (11 HIS ON HER 1POU11* HEIRS, ASSIGNS AND SUC E1011 Tm' M ligation Plan Chk Deposit IN INTEREST. AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF Receipt # EDMONDS , WASHINGTONF IT$ OFFICALS. EMPLOYEES, AN AGENTS MOM ANY AND ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY Fire Review FROM THE ISSUANCE OF IS PERMIt ISSUANCE OF THIS PERMIT SHALL NOT BE DEEMED To MODIFY WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE Fire Inspection Total Amount Due 01 NOR LIMIT IN ANY WAY THE CITTS ABILITY TO ENFORCE ANY ORDINANCE PROVISION. - Lan scape nsp. Receipt# 1 HERESY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION PRF APPLICATION AP OVAL GIVEN IS CORRECT; AND THAT I AM THE OWNER. OR THE DULY AUTHORIZED AGENT OF T his,ppli,sts, is not a poord-111 signed by Ins, THE OWNER. I AGREE TO CORP WITH CITY AND STATE LAWS REGULATING CONSTRUC� THE WORK AUTHORIZED THEREBY. NO PERSON WILL BE EMPLOYED CALL an "'I O-ow . III y: and Fees we pafd� end TION; AND IN DOING LA OF THE STATE OF S IN VIOLATION OF THE LABO HINGTON RELATING TO FOR INSPECTION o.IrqI,.oko rtsposp­ld.d. �..'ENE 0 WOAKME SURA 06 AN RCW 16.27. AL DATE / _SIGMATU 0 A E SIGNED (425) MAIIAE Yl�_ . ........ ... 771-0220 -5-ELEAsbV-E DATE jii �WiONI EXT 1333 7 V IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL 771-0221 A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A GERTIFI- CATE OF OCCUPANCY HAS BEEN GRANTED. USC SECTION 109 FAX ORIGINAL - FILd j YELLOW - IyfSPEcT6R PINK-OWNEAA GOLD -ASSESSOR 10101 z 0 am ITT ?I cc MM In Z '0­4 C c 0 n ,n m M a— O"n C rj) C CA M 0 z I z z 2 0 m RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing...................... Wall .......................... Pier/Porch ............. Retaining Wall Slab Insulation PLUMBING: Underground ............. Rough -In ................... Commercial Final HEATING: GasTest .................... Gas Piping ­. ........... Equipment ................. Commercial Final /EXTERIOR SHEATHING NAILING .......................... FRAMING ........................ FIRST FLOOR FRAMING INSULATION ............. Floor Insulation Wall Insulation ........... Ceiling Insulation SHEETROCK NAILING z 0 3: M IT 0 --10 0 3: M M Z g) —4 C > Cd 0 V5 0 C IT ;D z z SPECIAL INSPECTION MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY .................. 6V4 ;Z AS 'ft T .1