Loading...
20020323.pdfDATE RECEIMVED *it& I 1 141 lt')�_ i PERMIT EXPIRES I CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OWNER NA`UFINAME OF BUSINESS I" Alex Molnar 3 ADDRESS — FMAILING P.O. Box 55576 C CITY ITY ZIP TELEPHONE Seattle,WA 98155 206-363-5001 NAME by owner: Alex Molnar ADDRESS 540 Edmonds Way CITY ZIP ITELEPHONE Edmonds. WA 9 8020 1 425-774-9510 NAME - af xi�'r aez'4�y ADDRESS CITV ZIP TELEPHONE STATE LICENSE NUMBER EXPIRATION DATE I CHECKED BY ;I PROPERTY TAX AD OUNT GEL NO. 27032500308300 0 NEW RESIDE IAL q _(a.�EGH NO ADDITION E] COMMERCIAL 11 CHANGE OF USER REMODEL 0 APARTMENT El SIGN E] REPAIR E] GRADING 0 'INGE Cy.. I — X Fn DEMOLISH TANK OTHER GARAGE RETAINING WALL CARPORT ROOKERY RENEWAL (ME OF USE, BUSINESS OR A3? ?rN: NUMBER OF NUMBER OF DWELLING CRITICAL 'GAL AREAS Ad STOR JES a, _Pel UNITS I NUMBER ER DESCRIBE WORK TO BE DONE r.hannina f rain P lioctrir h. '-W at er water boiler & domestic hotwater —2- &71V117-, I'J 7�1 Ile J13012- AAA aj A? S/ �A/Pl— "D7 , V" HEAT SOURCE 11—NII Is LOT SLOPE I PLAN CHECK NO: VIST111 DATE THIS PERMIT AUTHORIZES ONLY THE WO K NOTED. THIS PERMIT COVERS WORK TO t: BE DONE ON PRIVATE PROPERrY ONLY, ANN' CONSTRUCTION ON THE PU13UC M ]DOMAIN (CURBS, SIDEWALXS. DRIVEWAYS, MARQUESS, ETC.) WILL REQUIRE SEPARATEPERMISSION. PER ITAPPUCATION: ISDIDAYS PERMIT LIMIT I YEAR - PROVID D WORK IS STARTED WITHIN INDAYS SEC SACK OF PINK PERMIT FOR MORE INFORMATION 'APPLICANT, ON BEHAL OF His OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND ALLCLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE Of THIS PERMIT SHALL NOT BE 9 DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE 0 NOR LIMIT IN ANY WAY THE CRYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION. - HERE ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION GIVEN IS CORRECT, AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRU TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EM PWYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON REUTING TO WORKMEN'S.05WkNSATION INSURANCE AND RCW 1027. DATE SIGNED 4-29-02 USE PERM T ZONE NUMBER JOB SUITEIAPT# ADDRESS '5110 Fd1nod-, A� PLAT NAMEISUBDIVISION NO. I LOT No. L�D Il L D FEE S PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP d Plonst P�Wd EXISTING — PROPOSED risous. ton-1, .'unsd REQUIRED DEDICATION— FT ­,o_ P" "Ou"'D REMA GWNEtNW DR K/DRAINAGE I milikil ott fud-burning appli linces in :IRE REVIEWED BY DATE VARIAN VfflWQh33$ QjOWhEJ.j(M9kd#% watep Stillin BOND a E POSTED is open or dowd, P.,,pansioq b =12re L4%dJfi'jNpgE "Fi k JLpgE HEIGHT LPT SEPA FM 39L PCs 'OMP I FUSED , LETE . 9JAd KP ECDC119.30.020'C) LOT CI �VERAGE REQUIRED SETBACKS (Fr.) PROPOSED SETBACKS (FT) ,LLOWED PROPOSED FRONT SIDE BEAR FRONT UR SIDE REAR PARKING I LOT AREA I PLANNING REVIEWED BY DATE IEMARKS :HECKED BY JTYP;,�N I Cll�:_';t 11 UP, OR BIT UP �PECIAL INSPECTOR JAREA EQUIRED [] YES LOAD OCOU EMARKS INSPECTION VALUATION $ Plan Check Mechanical Grading Recording Fee Engr. Review City Surcharge Engr. Inspection State Surcharge Traffic Mitigation Plan Chk Deposit Fire Review Receipt # Fire Inspection Total Amount Due I Landscapeinsp. Receipt # CALL FOR INSPECTION (425) 771"0220 APPLICATION APPROVAL This application is not a ponnit-11 started bythe Building Offlclitt,, Init-orOoputy; and F—are pind,and ro'inpl I...kn.w1sdg.d 1. spue p—IdedF /;/A;); DATE OFFICIALS I; — "J(� RELEASED BY ATTENTION EXT 1333 ----------------------- IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL 771-0221 1 A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- ORIGINAL . FILE YELLOW - INSPECTOR CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 FAX PINK - OWNER GOLD � ASSESSOR z 0 j 7 0 Pri M 171 0 80 C M IT 0 o"n n M M 0 0 0 M a Cn 90) M 0 71 z -4 z 171 RECORD OF INSPECTIONS t INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing...................... Wall........... f ............. z Pier/Porch ................. Retaining Wall ........... Slab Insulation .......... PLUMBING: C Underground ............. IT! 0 0 0 Rough -in ............... 0 C d K Commercial Final :i: M I., Z HEATING: Gas Test C > .............. Gas Piping 0 -n Equipment ................. ITI ITI Commercial Final EXTERIOR SHEATHING 6 Fn NAILING ....................... 0) mo� FRAMING........................ FIRST FLOOR FRAMING INSULATION ................ z Floor insulation Wall Insulation ........... Ceiling Insulation SHEETROCK NAILING 0 171 SPECIAL INSPECTION MISCELLANEOUS FINAL APPROVAL FOR W3 OCCUPANCY ..............