Loading...
20020326.pdf(�Cj/'Jjl I (A 1-11 "i", I r17 =x) I's, -0 6-1 PERMIT EXPIRES CITY OF EDMONDS ZONE PERMIT NUMBEF1,')1a1___) CONSTRUCTION PERMIT APPUCATION JOB SUITEIAPT# ADDRESS A150 4jj hVienueS Z.00 OWNERNAMENAME OF BUSINESS PUT NAMEtSUBDIVISION NO. LOT NO, Up 'I-. LID FEE $ Id cal (4) 1) Buildl nq E B 1U..0 MORT OF WaY PER .111C Al STREET MAP EXISTING — PROPOSED— int—.7 that 't.d sch-a ..... . CITY ZIP TELEPHONE Edmonds VIDD.0 1401oil-771-Sll-1713 A REQUIRED IQICATT ON— FT NAME METER SIZE I LINE SIZE I NO. OF FO(TURES YEPRV REQUIRED a ADDRESS NAME ENGINEERING PAT� 2 IEVI; .0 ;� 4�L 72 Qoet-hSt'sw 0- 'q Z_ ki FIRE REVIEWED By DATE M CITY "P ELEPHO E TELEPHO ��O' - LW,/7 75 J STA Ne`�.0 ExPiRAnoN DATE RUSSESC0010CIF KED BY "'4Y VARIANCE OR CU SHORELINE OR ADO# ADB IN T_ )(YES C3 NO BEPA REVIEW COMPLETE , 17T EXP BIGN AREA AZ� I PRjZ1; HEIGHT AL I I P1, ED 17111 Z! PROPERTY TAX ACCOUNT PARCEL NO. a NEW 13 RESIDENTIAL 0 PLUMBING MECH LOT COVERAGE ALLOWED PROPOSED REQUIRED SETBACKS (FT.) FRONT SIDE REAR PROPOSED SETBACKS (Fr.) FRONT URSIDE REAR ADDITION COMMERCIAL C MPLIANCE OR CHANGE OF USE I n REMODEL APARTMENT ERIN PARKING RE LOT AREA 0 REPAIR GRADING CY.S FENCE ( _ X FT) REMARKS 0 DEMOLISH TANK 0 OTHER se Ei GARAGE RETAINING WALL RENEWAL CARPORT ROCKERY RAVE-; LAkApjz-i�;l AI2FA 01'- -�,W A-r 1,VA--W -b� A-r BAz-.�04�- Pill, (TYPE OF USE, BUSINESS Or" EXPLA&,j j I Ill Ce I C-7. BY rTREON I--,2qF CWf7�CCUPANT soup 1 6 01 STO IES "' '7, UMBER DWIEUJ .1 I'UNITS No CRITICA AREAS NUMBER OECD R YES IA..A [EPECIAJEI.�InCTOR OCCUPANT LOAD DESCRIBE WORK TO BE DONE !=.RE.S INSPECTIONS PER URIC 1108/1"INAL INSPECTION REO'D A Description FEE Description FEE Rian-eflon S HEAT SOURCE OWING % LOT SLOPE % jE Building VESTED PLAN CHECK NO: ESTBD DATE Plumbing Mechanical This PERMIT AUT ORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO 0 DONE ON PRIVATE PROPERTY ONLY, ANY CONSTRUCTION ON THE PUBLIC Grading Recording Foe DOMAIN JCURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.), WILL REQUIRE 12 SEPARATE PERMISSION, Engr. Review -5-0 City Surcharge PE MITAPPLICATION: INDAYS PERMIT LIMIT. I YEAR - PROVIDED WORK IS S.ARTEO WITHIN 181IDAYS Engr. Inspection State Surcharge SEE BACK OF PINK PERMIT FOR MORE INFORMATION 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIR% ASSIGNS AND SUCCESORS Traffic Mitigation Plan Chk Deposit IN INTEREST AGREES TO IND1.1111, DEFEND AND HOLD HARMLESS THE CITY 01 EDMONDS, WASHINGTON, ITS OFFICIALS. EMPLOYEES, AND AGENTS FROM ANY AND Fire Review Receipt # ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE. ARISING DIRECTLY OR INDIRECTLY FOOM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT S"ALL NOT HE Fire Inspection Total Amount Due DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINA CE o No R LIMIT IN ANY WAY THE CITYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION, Landscapemsp. F.-C-107- 1/z,55_r I HEREBY ACKNOWLE GE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION GIVE IS CORRECT. AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF APPLICATION APPROVAL THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC. CALL This application Is not a p-11 until signed by too TION: AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED I IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION Bull ding On nnni�cial,, his her repay: and Fees pt I, acknoudgind In space are paid, and rudytilad. ,NSATION INSURANCE"AND HOW 18.27� WORKMEN'S_SOYPF DATE SIG U (OWNER R AD DATE (425) 1 771-0220 Y 'DATE ATTENTION Off 1333 IT IS UNI AWFIII TJISE OR OCCUPY A BUILDING OR STRUCTURE UNTIL 771-0221 Lr� A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- ORIGINAL - FILE J YELLOW - INSPECTOR CATE OF OCCUPANCY HAS BEEN GRANTED. USC SECTION 109 FAX PINK - OWNER - GOLD - ASSESSOR 10101 z ?5 IT M M 0 80 C --I C X M M z '0-4 z CA 0 -n n in M W ce 0 r- 0 IT C co C co In 0 Z r- z -4 x z 0 j 0 I FINAL PROVALFORM DANE:- wmo To: PERmrr COORDINATOR, BUILDING DIVISION FROM: FIRE DEPARTNIENT DATR— ENGINEERING DIVISION DATE- 7T z PLANNING DIVISION DATE 9 0 R1 PROJECT :q 7— SrrE ADDRESS CM Ma 0 PERAff #,:2����ADB#__--------DATE INSPECTED— MM DESCRIPTION OF WORK TO BE INSPECTED--.-�4)&&�V?� 2�—� Mz 0-1 �; z A field inspection was conducted to determine final compliance with approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of - 0 -n n MM 0 X GRANT FINAL PROJECT APPROVAL M a Cl) 9 cl) MO Z GRANT PROJECT APPROVAL WITH CONDITIONS NOTED u Copy of CONDITIONS given to owner/contractor by inspector z I CD z FAILED FINAL INSPECTION - OUTSTANDING ISSUES o Copy of CORRECTION NOTICE given to owner/contractorby inspector M 2. 3. RE -INSPECTED OUTSTANDING ISSUES GRANT FINAL PROJECT APPROVAL Date_ Sign_ ocaprvl.doc.l:tenip:bldg:fonnsIO/OI FINAL gKOJECTAPPROVAL FORM T%& TO: oo DATE: — MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: --FIRE DEPARTMENT DATE — I ENGINEERING DIVISION DATE 'Q-1e PLANNING DIVISION DATE — PROJECT Vt SITE ADDRESS.-,4,,5-0 PERMIT C& # ---,ADB# —DATE INSPECTED — DESCRIPTION OF WORK TO BE INSPECTED-h A field inspection was conducted to determine flual compliance with approved plans. Final approval denotes that there are no objections from the above signed Department to the release of pERFQRNLANCE BOND and the granting of: -GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED u Copy of CONDITIONS given to owner/contractor by inspector FAILED FINAL INSPECTION - OUTSTANDING ISSUES 0 Copy of CORRECTION NOTICE given to owner/contractor by inspector 1 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Sign— ocaprvl.doc.1:terM:b1dg:fbrms 10/0 1 z 2 0 —n CM MO 0 80 C -4 C X M M Z '0-1 z -n n M M C4 r- M U) A U) z 0 74 X > z -4 3: 0) z 0 M RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing wall....................... Pier/Porch ................. Retaining Wall ........... Slab Insulation ........... PLUMBING: Underground ............ Rough -in ................... Commercial Final HEATING: Gas Test __ ................ Gas Piping ................ Equipment . ................ 'Commercial Final EXTERIOR SHEATHING - NAILING .......................... FRAMING ..................... FIRST FLOOR FRAMING... INSULATION ................ Floor Insulation Wall Insulation ........... Ceiling Insulation SHEETROCK NAILING SPECIAL INSPECTION MISCELLANEOUS .......... FINAL APPROVAL FOR -Z_ OCCUPANCY .................. AMR See M C M M z 0 -n 171 pill Q 0 z z 9 0 ITI