20020385.pdfDATE RECEIVED
PWA
PERMIT EXPIRES
CITY OF EDMONDS
us,
ZONE
CONSTRUCTION PERMIT APPLICATION
JOB
'T'17T
'ER BUSINESS
ADDRESS
fiMeg!� ZT 1-1 A 71) 7—
PLAT NAMEISUBDIVISION NO. 1�1) NO,
0 FEE S
PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP
ZIP TELEPHONE
11214 A 4 fa
EXISTING — PROPOSED
In
REQUIRED DEDICATION_ FT — Un F.-
E
METER SIZE LINE SIZE
PRV REOUIIED'
I
l';j,
YE� N o 13
'APR
REMARKS
OWNERICONTRACHOR RESPONSIBLE FOR EROSION CONTROWORAINAGE
ZIP TELEPHONE
T
241JII�� n
ENGINEERING
-IIJ14
CITY Z�
T'E'LEPHON'
FIRE REVIEWED BY
S :aI77-��X� �y ,
L
z1V - .3,:Xl - &/34/
STATE LICENSE NUMBER
FXPIRkTK
RJANCF OR CU
NEW
RESIDENTIAL
"Bi PLUMBING / MECH
1
LOT COVEACH
ALLOWED PROP,
/"�_ADDITION
COMMERCIAL
0 MPLIANCE OR
0 OHANGE OF USE
'P')
REMODEL
APARTMENT
0 SIGN
PARKING
IDE
FENCE
REPAIR
C1-S
X FIT
DEMOLISH
0 TANK
0 OTHER
.-ININ. WAL,
4GARAGE
CARPORT
_
U ROCKERY
RENEWAL
OF USE. USINESS OR niffy) EXPLAIN:
CHECKED By Tyr
NUMBER
a -OF
CRITICAL
OF
STORIES
DWELL NG
UNITS,
AREAS
NUMBER
SP DIAL INSPECTO
REQUIRED 0 YES
DESCRIBE WORK TO BE DONE
DATE
SHORF,LINE OR ADS#
INSPECTION
D
Re o
I PIO
OSTEC
DYES ONO
SION AHEA
HEIGHT
ALLOWED PROPOSED
ALLOWED
P7,07
,
Q , i
HIRED SETBACKS (FT.) PROPOSED SETBACKS JFT�
FROM SIDE REAR
FRONT LT�10� BEAR
AREA I PI,ANNING REVIEWED BY DATE
.... INT<IC
LOAD
14) 'Z
ER UBC 11081FINAL INSPECTION REQ'D
��'rv) 21
VALUATION $
/C/6 1 IKK)
lu it z2i
Descriptlon
FEE Description, FEE
C
Plan Check
13 ZIC
0 0 LOT "'P E ---
Building
/671,1
&,s--e
k
_
SITED DATE
Plumbing
11150
THIS PERMIT AUTHORIZES ONLY THE WORK NOT G), THIS PERMITCOVERS WORK To
Mechanical
BE DONE ON PRIVATE PROPERTY ONLY, ANY CONSTRUCTION ON THE PUBLIC
DOMAIN SIDEWALKS,
Grading
')`0
M (CURBS. DRIVEWAY$. MARQUEES, ETC,) WILL REQUIRE
SEPARATE PERMISSION.
Engr. Review
I j
Recording Fee
City Surcharge
FIC'MITAPPLICATION: INDAYS
PERMIT UMM I YEAR - PROVI E
2RD WORK IS STARTED WITHIN 180DAYS
SCSSACKOFPINKP MIT FOR MORE INFORMATION
Engr.insp ion
6Ct
State Surcharge
—PL-NT. ON BEHALF 01 HIS On HER SPOUSE. HEIRS. -SIGNS A No .... I....
Traffic Mitigation
Plan Chk Deposit
IN INTEREST AGREES TO INDEMNIFY. DEFEND AND HOLD HARMLESS THE CITY OF
2 EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND
I ALL CLAJMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY
Fire Review
Receipt #
9 FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS P RMIT SHALL NOT HE
DEEMED TO MODIFY, WAIVE OR REDUCE ANY REOUIREMENT OF A CITY ORDINANCE
Fire Inspection
Total Amount Due
0 NOR LIMIT IN ANY WAY THE CIT�S ABILITY TO ENFORCE ANY ORDINNYANCE PRONISION.-
Landscapainsp.1
Receipt #
I HERESY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION
GIVEN IS CORRECT, AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT .1
APPLICATION APPROVAL
THE OWNER IAGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC.
TION; AND IN GOING THE WORK AUTHORIZED THEREBY. NO PERSON WILL BE EMPLOYED
CALL
This nPinficatiOl is rnt a Pshnift Unfli 119"d by ush
IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO
8.4ding Offidsi ., Issih., D.puny� nd Fss. .. p.ld
FOR INSPECTION —1pt Is in
WORKMENSS�N�ATIQN INSURRANICE No RCW UIL271
ack—led9od spshe Pholldad�
'r --
R (0& on
I
V
(425)
OFF1 IIIIATURE DATE
�ATIZNED/
Sig
\�',111
771-0220
ATTENTION
RELaIS By
EXT 1333
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL
A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI-
771-0221
CATE OF OCCUPANCY HAS BEEN GRANTEO UBC SECTION 109
10101
FAX
PINK,OWNER - GOLD�ASSSSSOR
z
0
C 171
M 0
0
80
a
M M
0 In
rn ITI
0
0
0
9 (D
M 0
Z
71
C"
z
DATUMT P 0 1 N11
0
rx. (111,01, 191-108,
�ci
C. 191-1.38,
OZ
om
a
M
8 OL
Idl 1.
m
'ate
0
fall
A. 19
L
,AV.
B tl 99.50,
m M
0
OC
co
APPROVED BY PLANNING,
z
10
Iii, 'F- !SP"IT44,
I
pigy
jee oA o -vJ
wuaup 7 it J
Gil
ENGINEERS SURVEYORS PLANNERS DEVELOPMENT CONSULIANIS
Mr. Lyle Chrisman, Engineering Program Manager May 17, 2002
City of Edmonds Community Services Department LSA No. 4328
121 Fifth Avenue North
Edmonds, WA 98020
RE: Smith Residence— 9505 216" Street SW
Z�
Waiver request- Maximum driveway slope.
0,
Plan Check #02-184
0
Dear Mr. Chrisman:
This letter is a request for a waiver to the City's maximum driveway slope restrictions. Mr.
and Mrs. Kent Smith are proposing to relocate their current driveway from the east side of
-40
their house to the west side as part of a remodel/addition to their residence. Their
0 C:
residence is located within the City of Edmonds at 9505 2161h Street SW
-4 K
X M
. 1, ,
M
The natural topography of the site slopes to the back of their lot, about 8 feet from the front
c: —
Z
to the back. The existing driveway (to be removed) is approximately 20% for a distance
of about of 20 feet. The Smiths propose to reconstruct the driveway along the west side
of their house at a slope of 15%. The design of 15% provides an economical and
0,"
environmentally reasonable alternative to fit the current topography of the site, with respect
to the existing house location. (It reduces the amount of required excavation and height
MM
5j,
and length of retaining wall/rockeries).
0
5 Fn
The proposed driveway of 15% will have no adverse impactto public health, safety and/or
general welfare. Therefore, on behalf of our client, we are requesting a waiver to authorize
C 0
0,
a maximum driveway slope up to 15%, by City Code 18.80.060 (D).
X,
Thank you for taking the time to review this matter. Please call me if you need additional
information or have any questions.
Z
9
Sincerely,
0
M
ajo
i!� V KD
MAY 17 2,092
Robert L. Long, PE
06
rs
Lovell-SULIefland & Associates, Inc.
19400 33rd Me. W., Suite 200. Lyntumd, WA 98036 800-77S-7663 125-775-1591 425,672-7998 lux
Height Calculation Worksheet
Address:
Date: e")U- �'z
Inspector(s):
1. Datum Point: Q_
2. Datum Point Elevation:
0 -
3. Averag
Re Grade:
M,:
4. Maximum Elevation Allowed: �I'haverage grade) + 25'
M
C
MCI
0
5. Reference Point Elevation Shot to House:
K
C,
—(datum elevation) +4, S (grade to transit,level line shot to house)= 0
M
M�
6. Measurements from line shot onto house to roof ridge:
z
4n
C�, ku
mm,
0
0
C
M 0'
z
Total:
OY
z
0
M
7. Actual Elevation: (reference point elevation) +Pd-!?T (measurements
from #6)
(actual) is greater 6e—,s th,�i 1�Z2d'3- 5 allowed); therefore the house is/
is not over the height requiremenT "Per ECDC 16.20.30 requirements
LATEWXBUILDINGWISOHeight Calculation Worksheet.doc
FINAL PROJECT APPROVAL FORM
TO:—
DATE: —
MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION
FROM: FIRE DEPARTNENT DATE —
ENGINEERING DIVISION DATE_4U�I_i_
PLANNING DIVISION DATE—
z
6
PROM
0
C M
srrE ADDRESS-
M C,
ADB# INSPECT
--10
00
C
-4 C
= M
DESCRIPTION OF WORK TO BE INSPECTED f�Mi_
M z
A field inspection was conducted to determine final compliance with approved plans. Final approval
denotes that there are no objections from the above signed Depa rtment to the release of
0 n
P RMANCE BONDS and the granting of:
M M
GRANT FINAL PROJECT APPROVAL
0 -M
C
W
Q 0
Z r-
GRANT PROJECT APPROVAL WnH CONDITIONS NOTED
>
z
0 Copy of CONDITIONS given to owner/contractorby inspector
ch
z
0
FAILED FINAL INSPECTION - OUTSTANDING ISSUES,
q
0
M
a Copy of CORRECTION NOTICE given to owner/contractor by inspector JAN 1 2003
PERMIT COUIVTEI,
2.
3.
RE -INSPECTED OUTSTANDING ISSUES GRANT FINAL PROJECT APPROVAL
Date— Sign_
ocaprvi.doc.l:temp:bldg:fonnsIO/OI
RECORD OF INSPECTIONS
INSPECTOR
DATE APPROVED
Ms
�v
SETBACKS .....................
FOUNDATION:
o Z- V�"
Footing .....................
wall ..........
Pier/Porch .................
Retaining Wall
Slab Insulation ..........
PLUMBING:
Underground .............
Rough -in ...................
yvf.
flf`i�i
6Z
Commercial Final
..........
HEATING:
Gas Test ....................
-Til-atz
Gas Piping
—'7
Equipment .................
Commercial Final
EXTERIOR SHEATHING
NAILING ..................
r
I FRAMING ..................
FIRST FLOOR FRAMING
INSULATION .............
Floor Insulation
Wall Insulation
Ceiling Insulation
6Z
SHEETROCK NAILING
SPECIAL INSPECTION
MISCELLANEOUS
FINAL APPROVAL FOR
OCCUPANCY ..............
Ql? 1 '7�
SIdeSewet#_
AmoutPWd$ 3.-2_Rce1pt#_!&d—
fres
Waterp4et&Sizze AA:!:
Receipt #_
AmountWId-
.0 DntePum%=Cd
gold-- I/ I
.01v
Amount P--.d —neempt V
z
0
am
MO
0
80
r_
_11
x IT,
m z
10-1
2
03
Im m
0
0
09
C rj)
C (j) .
M C)
zr-
:)D
z
z
0
:j
0
m