Loading...
20020418.pdf40DATE REC�jl --Z" lb ES I CITY OF us ZONE PERM T EDMONDS NUM11EW , DO — CONSTRUCTION PERMIT APPLICATION JOB SUITE/APT# ADDRESS g�q e) p L'j Ic GIN FIAT NAMEISUBDIVISION NO, LOT NO* I. D NO. 'r '77OF17111EI, , / U. FEE I MAILING ADDRESS 41- 0 PUBLIC HIG14T OF WAY PER OFFICIAL EXISTING — PROPOSED� STREET IJAI .1 Awne,se TA A-sed su..� Us. Iese. need %'Id—_ �'==. CITY fZIP TELEPHONE REQUIRED DEDICATION— FT — NAME METER SIZE LINE SIZE 110. 01 FIXIU111 1111 IIEIIUIIED I 1 ES C3 NO CI ADDRESS REMARKS OWNERICONTRACTOR RESPONSIBLE FOR EROSION CONTROLIDRAINAGE 5 "z <'), e � _' I ENGINEEMN6 74 IIEVIIWEDIOATE 2112 fe 2- 5:2 FIRE REVIEWED BY DATE TELEPHONE 7,75'-0?—Y2 STATE LI EASE NUMBER VARIANCE OR CU SHORELINE OR ADS# INSPECPON a Son I .. POSTS. 7 AM ) Cly ES E3NO SEPA REVIEW COMPLETE EXEMPT SIGN AREA ALIOWE. PROPOSED HEIGHT ALLOWED PROPOIED P" EM 7 1 EXP , , , INC A SIDENTIAL 0 PLUMBING I MECH LOT COVERAGE ALLOWED PROPOSED REQUIRED SETBACKS (Fr.) FRONT SIDE BEAR PROPOSED SETBA KS (FT.) FRONT Us SIDEC REAR C C :MMERCKL o COMPLIANCE OR REMODEL APARTMENT CHANGE OF USE SIGN 1 I AEC PLANNING REVIEW ED By DATE 0 REPAIR E3 GRADING CYDS FENCE I� REMARKS 0 DEMOLISH [3 TANK I- I o GARAGE o RETAINING WALL RENEWAL CARPORT OCKERY A OF U (TYPE BE, BUSINESS 0 r7�r: AARE CHECKED By 'jF CO ISTRUCTI, ITrY /WOV I CCUPAN�e ROUP ;DESCRISEW(OITRKTO NUMBER OF DWELLIN UNITS G C.- SPECIAL INSPECTOR JAREA REQUIRED [3 YES I OCCU NT LOADPA BE DONE REMARKS PROGRESS INSPECTIONS PER UBC IOSIFINAL INSPECTION REaD VALUATION $ Deacripticin FI 77 Plan Check 14 T THIS PERMIT AUTHORIZES ONLY THEVAD KNOTED, THIS PERMIT COVERS WORK TO Mechanical C t: BE DOME ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC Ing Grading Recording Fee 130 RE MAIN (CURBS. SIDAWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATEPERMISSION. Engr. Review City Surcharge PERMIT APPUCATiON: IN DAYS PIERMITUMAR1YEAR-PROVID D WORK IS STARTED WITHIN INDAYS Engir. Inspection State Surcharge SEE BACK OF PINK PERMIT FOR MORE INFORMATION ON RENAL OF HIS On HER Annual, HEIRS, AIIIIINI AN. AUCcEEo1S Traffic Mitigation Plan Chk Deposit IN INTEREST. AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OFV ENT EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AD S FROM ANY AND Fire Review 'HE . raw Receipt P ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECnY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT DEEMED TO MODIFY. WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANC: Fire inspection Total Amount Due NOR LIMIT IN ANY WAY THE CITY$ ABILITY TO ENFORCE MY ORDINANCE PROVISION.- '0. . Landscapeinsp. Receipt # I, IHEREO' ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION LICATION APPROVAL GIVEN IS CORRECT. AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF T E OWNS . I A, RE T LY WITH CITY AND STATE LAWS REGULATING CONSTRUG. CALL $­P II dfi.d I, n. P.""'I IdItnwl e, .. WOM TION, A IN D No THE WO U ORIZED THEREBY, NO FARGO WILL BE EMPLOYED IN VIO ON OF THE LARD OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION BdII no 0 cial w his De"' Y: and Fees we pets, r 'Ipti—ke ed9=n1p.s.pnC,4d.d. WORK CICOMPENS , IN RCW 18,27. SIG71rw7t (425) ?t 771-0220 "ATTTION f1EASEQ BY EXT 1333 ---------------- IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING on STRUCTURE UNTIL 771-0221 A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- ORIGINAL - FILE YELLOW - INSPECT A CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 FAX PINK - OWNER GOLD - ASSESSOR 10/01 z 0 ITI C M 0 80 C M ITT 0-4 C o -n M ITI 0 0 0 M CO ITI 0 Z z -4 z 0 4 0 M RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing ...................... Wall .......................... z Pier/Porch ................. Retaining Wall ........... R1 Slab Insulation PLUMBING: Underground ............. M IT! 0 —40 Rough -In .................. 0 C: Commercial Final ITI ITI z j0-1 HEATING: C z Gas Test Gas Piping ................. Equipment ................. n Commercial Final EXTERIOR SHEATHING NAILING .......................... C C V) FRAMING .............. Q 0 z 74 FIRST FLOOR FRAMING INSULATION ................... Floor Insulation z Wall Insulation ........... ca Ceiling Insulation z SHEETROCK NAILING IT! SPECIAL INSPECTION MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY ..................