Loading...
20020459.pdf,`�Dni _REcEmc_D__T_7 'r I �s- LPE_Rm1T Expli CITY OF EDMONDS USE ZONE P 'ERIl IT 'ZI 'M ER _C CONSTRUCTION PERMIT APPLICATION on ADDRESS E PT# 4 rE;7 01 BUSINESS lass PLAT NAME]SUBDIVISION NO. 1,15 NO. ING ADDRESS LID FEE S PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP Tes" A, oun, �_u Real 11 TE THE EXISTING PROpo BED— ainun ".. rmse Ku,' ­­'­d a E requ.1red 01 ruel-b!tm PSYREQUI.R% a N �Lz_ 11 ­_ :; — I� --- --- FIRE flj�IE%&�`aallil IRS 'ac-rical rermit.frefi�, 'i 1. 91?/'�"p I I JI TELEPHONE 2M _17SV_ 49 (080 j Iz Stat aaL State Labor & Indust iinO i STATE LICENSE NUMBER EXPIRATION DATE VARIAMe"-01+—­ VAR' INSPECTION No P'OT.D coSEPA 0 E3 YES NO I �Y REVIEW SIGN AREA HEIGHT rIER— COMPLETE EXEMPT ALLOWED PROPOSED ALLOWED PROPOSED (ahm. MIA DD , , EXT NEW RESIDENTIAL PLUMBING t MECH V EA LOT COVERAGE ALLOWED PROPOSED REOUIRED SETBACKS (FT.) FRONT SIDE REAR PROPOSED SET KS (Fr.) FRONT UP SIBEC REAR ADDITION COMMERCIAL COMPLIA CE OR CHANGE OF USE PARKING LOT AREA PLANNING REVIEWED BY DATE 0 REMODEL 0 APARTMENT SIGN RED D PROVIDED REPAIR GRADING F NCE I 14 El cyos o I X FT) REMARKS DEMOLISH TANK OTHER GARAGE 0 RETAINING WALL 0 RENEWAL CA IORT ROOKERY E OF USE, BUSINESS OR ACTAI �53 PW! CHECKED BY TYPE OCOUPA I NUMBER OF UMBER OF N WELLI G CRITICAL AREAS Becu P SP CIALEOINSPECTOR OCII 'PANT STORIES N S NUMBER SE OU R JAREA R 0 YES LOAD DESCRIBE WORK TO BE DONE REMARKS 9 1PROGRESS INSPECTIONS PER USC 108/FINAL INSPECTION REOD as L VALUATION$ ellacription FEE Plan Check PLAN CHECK VESTED DATE Plumbing Mechanical THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO IC t: BE DOME ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC 2 Grading g Recording Fee To a U 3 OMAJN (CURBS. SIDEWALKS, DRIVEWAYS E IWILLREO IRE 0 (IUI RE 'S'E - SEPARATEPERMi"'A"OU SSION. PE MITAPPLICATIGN: INDAYS — Engr. Review City Surcharge PERMIT LHUM I YEAR - PROVIDE WORK IS STARTED WITHIN IN DAYS gr I spe Engr. Inspection State Surcharge SEE BACK OF PINK PERMIT FOR MORE INFORMATION 'APPLICANT ON BEHALF OF NIS OR HER SPOUSE, HEIRS AND SUCCESORS Traffic Mitigation Plan Chk Deposit po�ASSIGNS IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND D HARML BE THE CITY OF X EDMONDS, WASHINGTON. ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND Fire Review Receipt It 1. ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE 9 DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE Fire Inspection Total Amount Due 0. NOR LIMIT IN ANY WAY THE COTS ASII 70 ENFORCE ANY ORDINANCE PROVISION.- Landscapainsp. Receipt # I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION APPLICATION APPROVAL GIVEN IS CORRECT, AND THAT AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGREE To COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC. CALL This application Is net a permit until signed by Sm TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION Building Official., blamer Deputy: and Fees are paid. a pseelpt 1, Imfun-hadgrxi I..p.c. punAded. WORKMEN'S CW URANCE AND DOW 18.27. OffICIALS, SIGNTURE DATE S NATURE V G DVIJED r / , &xx n 77,1-0,220 , -;FE, EASED By DATE ATTENTION EXT 1333 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL 771-0221 A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- ORIGINAL - FILE - YELLOW - INSPECTOR CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 FAX PINK - OWNER - GOLD - ASSESSOR 10101 z M 20 M . I 80 X M M Z o -n ,n 1111 fill U Go 0 0 Fn C 0) 3: co Q 0 z z z 9 0 RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS FOUNDATION: Footing .............. wall................... Pier/Porch ................. Retaining Wall ........... Stab Insulation .......... PLUMISING: Undergrol4% M C Cl M 0 Rough -In ............ ...... C 0 Commercial Final IT HEATING: ITI GasTest .................... Gas Piping ................. 0 Equipment .......... It ;_0 commercial Final m M C' EXTERIOR SHEATHING 0 NAILING .......................... C &* E V) FRAMING ......... M 0 FIRST FLOOR FRAMING Z 74 ;13 INSULATION — ............ Floor Insulation z Wall Insulation Ceiling Insulation SHEETROCK NAILING 0 SPECIAL INSPECTION IT! MISCELLANEOUS FINAL APPROVAL FOR Lip -,)7-0Z OCCUPANCY