Loading...
20020545.pdfDATE RECEIV74 2� 2 1 F _ _ 6� PERMITEXPIRES USE CITY OF EDMONDS ZONE PERMIT N ER UNI, CONSTRUCTION PERMIT APPLICATION Jo UITE/AFT# ADDRESS Z4 a W 14UI NE.S s LENAMEL-A-MI�01 PLAT NAMEISUBDIVISION NO. 711. 1 NO. .AILING ADDRESS D FEE '�D S PUBLIC RIGHT OF WAY PEROFFICIAL STREET MAP P—a R TELEPHONE EXISTING — PROPOSED— ta�r- eflOq— 0 V REQUIRED DEDICATION FT 714 1/7/1 7�i 13 NAME METER SIZE LINE IZE 110. OF 11-URII PRV REQUIRED I 1 YES 13 NO 13 REMARKS OWNERICONTRACTOR RESPONSIBLE FOR EROSION CONTROUDRAINAGE CITY ZIP IT111PHONE Itjja5 OW01EIZ �NILL YV- 9Wj99.D 40 Q15ftO ft NAME /I Ste z!---I �'olo" na '-'CJ FIRE REVIEWED BY DATE CI[ ZIP TELEPHONE 4��5-7 7,9h9 IZ STATE VCIENSE N M a EXPIRAT�WFA CH1c11D BY VARIANCE 01 CU SHORELINE OR ADI1* INSPE NO OSTED �qNO Pao u RED DYES $EPA SMEW SIGN AREA I PROPERTY ACCO Co LET E E-PT EL NO. C P a X �ALLOWED PROPOSED ALLOWED PROPOSED no Q 72CM Q C), I Q -XP Iq r LOT COVERAGE PT LOT COVERAGE REQUIRED SMACKS (Fr.) PROPOSED SETBACKS i TIAL 0 PLUMBING MECH ALLOWED PROPOSED FRONT SIDE REAR FRONT LIASIDE REAR) .W PROPOSED 0 ADDITION L C MPLLANCE OR CHANGE OF USE PARKING LO� AREA REVIEWED 13Y OAT GPUNNING 0 REMO DEL RE"O PROVIDED >— I I 11FHOE REPAIR 0 "HAD.N. Me 1:1 FTI SE.AIIXS DEMOLISH TANK rl OTHER o GARAGE o RETAINING WALL CARPORT BY [3 RENEWAL ROCKS ITYPE OF USE, BUSINESS OR A CHECKEDBY ITYPEOV I CL7 C 67VN G 0 up 17—; NUMBER OF CRITICAL SPE OCCUPANT WELLING AREASS PEC[AL IN OTOR JAREA N S NUMBE IiII)I "EQUIRED LOAD 0 STORIES YES DESCRIBE WORK TO BE DONE REMARKS PROGRESS INSPECT16NS PER UBC 108/FINAL INSPECTION REGIO VALUATION $ Description �FEE Description FEE Plan Check HEAT SOURCE LOT SLOPE % Building <; PLAN CHECK NO: Plumbing I Mechanical THIS PERMIT AUTHORIMS ONLY THE ORK NOTED. THIS PERMIT COVERS WORK TO BE CONE ON PRIVATE PROPERTY ONLY. AM CONSTRUCTION ON THE PUBUC 2 Grading Recording Fee DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMiSSION. Engr. Review City Surcharge RE MITAPPLICATION: INDAYS PERMIT LIMM. I YEAR PROVID 0 WORK IS STARTED - WITHIN 1 00 DAYS SEE BACK OF PINK PERMIT FOR MORE INFORMATION Engr. Inspection State Surcharge F His OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESURS Traffic Mitigation Plan Chk Deposit IN—IN'T"E^AE"'SIT�-,A,G,R,EE—S"T INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF a EDMONDS, WASHINGTON, I OFFICIALS, EMPLOYEES. AND AGENTS FROM ANY AND ALL CILAIMS FOR DAMAGES P.M. NATURE, ARISING .311ECTLY OR INDIRECTLY Fire Review Receipt # FROM THE I SUANCE OF THIS PERMM ISSUANCE F THIS PERMIT SHALL NOT BE DEEMED TO MODIFY. WAIVE OR REDUCE A YREOUIREMENTOFANYCHNORDINANCE Fire Inspection I Total Amount Due N OR LIMIT IN ANY WAY THE CITYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION. - Landscape IRS P. Receipt IV I HERB ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION GIVE IS CORRECT, AND THAT I AM THE OWNER. OR THE OULY AUTHORIZED AGENT OF �4— APPLICATION APPROVAL THE OWNER. I ABBE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC. CALL applie.0- 1-4 a peneaft-11 elga.d by Be. TION; AND IN DING THE WORK AUTHORIZED THEREBY. NO PERSON WILL BE EMPILOYEO IN VIOLATIO A OF HE STATE OF WASHINGTON RELATING TO suaTh', dlln� Offid.1.11,1IV1,11 Depley: and Fee. arapald. and FOR INSPECTION ... Ire I—kn7w].doed In ap.e. ra.Id.d. WORKMEN'S WNE�TAI."Nol.�CUOI;.EA�.�CWI..�l. 00F1 SIGNATUR D SIG A E W OR AGE I DATE SIGNED -712 (425) z- 771 -0220 ItEXSED BY —1. ATT,"TId N EXT 1333 P" A R III DING OR STRUCTURE UNTIL CERTIFI- 771-0221 A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CATE OF OCCUPANCY HAS BEEN GRANTED. USC SECTION 109 FAX ORIGINAL - FILE YELLOW INS PINK - OWNER GOLD - ASSESPSEOCRTO z m 4 m m 0 0 80 C ITI 10 co 0 -T1 "n mm m y D) 0 C, 21, K (1) M 0 z z 0 i 0 m FINAL PROJECT APPROVAL FORM TO:3 (A� DATE:_qJ ji MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FRO V FIRE DEPARTMENT DAT ENGINEERING DIVISION DATE— C) PLANNING DIVISION DATE—! 0 :j 0 A ou'e =i"a PROJECT 0M SITE ADDRESS� PERMIT ADB#-211 — —(DATE INSPECTED— C M 0 DESCRIPTION OF WORK TO BE B Sin Q M M z A field inspection was conducted to determine final compliance with approved plans. Final approval denotes that there are no objections from the above signed Department to the release of co 0 -n PERFORMANCE BONDS and the granting of: 3:9 M M GRANT FINAL PROJECT APPROVAL U CO 0 � 0 M C co Q 0 Z r- GRANT PROJECT APPROVAL WITH CONDITIONS NOTED z a Copy of CONDITIONS given to owner/contractorby inspector z FAILED FINAL INSPECTION - OUTSTANDING ISSUES M u Copy of CORRECTION NOTICE given to owner/contractor by inspector I 2. 3. RE_INSpECTED OUTSTANDING ISSUES GRANT FINAL PROJECT APPROVAL Date_ Sip_ ocaprvl.doc.l:temp.bldg:formsIO/OI RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing . ..................... Wall .......................... 6 Pier/Porch ............. z Retaining Wall ........... Slab Insulation 0 rp PLUMBING: Underground 0 M C Rough -in ................... IT 0 0 C Commercial Final M HEATING: ITI Gas Test ........... C z Gas Piping ... .............. Equipment ................. 0 "n "n Commercial Final M IT EXTER OR SHEATHING NAILING .......................... 0 0 17n a D) FRAMING ........................ ca Q 0 FIRST FLOOR FRAMING INSULATION ................... :0 Floor Insulation z Wall Insulation .......... Ceiling Insulation z SHEETROCK NAILING 0 SPECIAL INSPECTION M MISCELLANEOUS FINAL APPROVAL FOR OCCUPANCY