Loading...
20020559.pdfDATE RECEIVED -7) PERMIT EXPIRES PERMIT UTY OF EDMONDS UM, IN ER CONSTRUCTION PERMIT APPLICATION 'Op SUITEIAPT# A ... a. _9"ER NAMEINAME OF BUSI NBS PILAT NAMEISUBDIVISION No. J! NO, LID NO. MAILING ADDRESS LID FEE S PUBLIC RIGHT OF WAY PER 0 EET MAP —cf, An—.. su.. U.: zip ITELEPHONE EXISTING — PROPOSED I—- R.100 13 REQUIRED DEDICATION— Fr _ U—b"d NAME MUEA SIZE I LINE 1111 1 110, 01 FIXTURES IRV REQUIRED ADDRESS REMARKS YE�s 13 NO 13 OWNER(CONTRACTOR RESPONSIBLE FOR EROSION CONTROLAIRAINAGE S I A,­�t' Ito ENGINEERING, REII.ED BY DATE ADDRESS FIRE REVIEWED BY DATE TELEPHONE W C A�-" -A 7/,Q STATE LICENSE NUMBER EXPIRATION 1"E111f) By VARIANCE OR CU SHORELINE OR AD51 INIPEOTION BOND 'TE P.M. W.... I A&kl . ONO S I/ AA/J/'S,1 411717 &;1, ­SEPA REVIEW SIGN AREA H IGHT ;f PROP COMPLETE E XEMPT ALLOWE 71 zz�r W7k 5 I EXP I 2sol 0 NEW ARE.IDENTIAL 0 PLUMBING.IMECH Or Cc BE REQUIRED SMACKS (Fr.) PROPOSED SETBACKS R`r.) ALLOWE. OPOSED FRONT SIDE, REAR, FRONT 117E 11AA 0 ADDITION 0 COMMERCIAL COMPLIANCE 15 0 CHANGE OFUO�E 7W, -_ PAF,AING 0 8 EMODEL 0 MULTIFAMILY 0 SIGN REQN) PROVIDED I LOT AREA PL� 1ENCE 2 REPAIR 0 ..A.lN. cyce 0 ( . FT) REMARKS — — C-A- 02,- 3S -Al 0 DEMOLISH 0 TANK 0 017HER o GARAGE [3 AETAININGWALL r­-, FIRE SPRINKLER - CARPORT ROOKERY L_j 2-REALA M (TYPE OF USE, BUSIN CHECKED BY ITYPE OF CONSTRUCTION OC /�� , I , GFIC 1"2771 -uPP'm;C 3 NUMBER NUM ER OF \I rut OF WE LING SP TION 'IT OCCU JAREA ET.G'E6;.P UNITS LOAD DESCRIBE WORK TO BE DONE N, REMARKS PROGRESS INSPECTIONS PER UBC 108/FINAL INSP ION REO'D 0 0 k Ot _Q n�, I F Description FEE Description FEE Plan Check . . State Surcharge 41 5U HEAT GLAZIING SILO I)ID _.1*36 ...... rg Building Permit City Surcharge PLAN CHECK 1,14� v VESTED DATE Plumbing /3 THIS PERMIT AUTHORIZES 0.11 THE WORK NOTED. THIS PERMIT COVERS WORK TO Mechanical L BE DOME ON PRIVATE PROPERTY ONLY. AM CONSTRUCTION ON T E U LIC HRP BRE 2 Grading )W :I DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS MARQUEES,ETC ILL EOUI t: SEPARATEPERM;SSIOW PERMITAPPLICATION: INDAYS Engr. Review PERMIT LIMM I YEAR - PROVIDED WORK IS STARTED WITHIN M DAYS Engr. Inspection SEE BACK OF PINK PERMIT FOR MORE INFORMATION 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HERIS, ASSIGNS AND SUCCESORS Fire Review P1anChk,DepoSft IN INTEREST, AGREES TO INDEMNIFY DEFEND AND HOLD HAR LESS THE CITY OF EDMONDS, WASHINGTON, IT60FIlCIA18*IMPLOYIEI,MIIA131NT,4F8OlI ANYAND ALL CLAIMS FOR DAMAGES OF Fire Inspection Receipt # W M., WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY 9 SSUA BE FROM THE I CE OF THIS PERMIT ISSUANCE OF THIS PERMIT SHALL NOT TO MODIFY, WAIVE Landscape Insp. DEEMED OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANC 0. NOR LIMIT IN ANY WAY THE CRYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION' Total Anh. D.. 99& Recording Fee Receipt # L22 I HERE Y ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION, THAT THE INFORMATION GIVE IS CORRECT AND THAT I AM THE OWNER, OR THE APPLICATION APPROVAL DULY AUTHORIZED AGENT OF T E OWNER, I AGREE TO COMPLY WITH CITY AND STAT LAWS REGULATING CONSTRUC- CALL It cation 19— a per'It until sIgnoul by ine ­PP0 TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED iii�T 1) dirigOlfid.l.,hiiftner puIy;.rdF...­p.IoL.nd IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCVV M27. FOR INSPECTION nuunpu JS­kn0Wl0dg,d 11 SPacit PfOlided. _(OWNE!n OFF ALS�SJGNATURE DATE DATE SIGNED (425) VTUI L 7 Z-17�,�' 1 771-0220 � Y DAft ATTENTION' M 1333 Mid IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- CATE OF OCCUPANCY HAS BEEN GRANTED, UBC SECTION 109 ORIGINAL -FILE YELLM-INSPE&OR 04/02 PRESS HARD -YOU ARE PINK�OWNER GOLD -ASSESSOR MAKING 5 COPIES GREEN ACCOUNTING z 0 0 X C m MO 0 80 C ITT m z o"n MITI 0 0 C 9 00 In 0 z 7-1 z -4 z 0 m FIELD, REPORT 19730-64th Avenue West U 01 Lynnwood, WA 98036 425-774-0106 HWAGEoScIENCES INC. TFa'x'. 425-774-2714 Job No. Page No. 0 0' 2-000-6 of I R Pon NO. Date L11 9, 2 Project N me ===Location Thornas Residence or Address ni; I I SW 9804 215"' St. SW, Edmonds WA _�! cay., 7 �'!O a Friday Omer James and Mary Thomas ""o, I Edmonds 2002-0559 Weather Temp. (F) 70's uft.nt --- La,Ees and Mary Thomas TU-11 —R.p I Jai nes and Mary Thomas UR.Ol ln�m... Erik Andersen - Davis Construction - I 'D'omc3i`rHa1n1 HWA Field Rep. Susan Robarge WE NOTED THE FOLLOWING: (Contractor Activities, HWA Activities, Outstanding Issues, Resolutions) I arrived at the Thomas residence at 10:30 AM to observe the installation of Chance Anchors. When I arrived, Davis construction had already excavated seven holes below the foundation and had chipped away the overhanging foundation in four ofthe holes. The excavated soil generally consisted ofan olive brown, silty fine sand to fine sandy silt with organics, gravel and cobbles up to six inches in diameter, and is considered fill. The holes were spaced closer than the seven feet shown on the plans. The spacing ranged from six to three and a half feet. Additionally, the anchors along the north side of the house extended only 9.5 feet from the northwest comer to avoid a chinmey that was I I feet from comer and not on the plans. In addition, it was noted that the length of the house's westem wall was only about 25 feet instead ofthe 35 feet indicated on the plans. The attached sheet shows the house configuration and actual anchor layo I was able to observe that anchors and extensions were ofthe sizes specified, and Chance was stamped on the anchorust* Their motor for installing the anchors was a 2,500 foot-pound motor. Shortly after my arrival, the southernmost anchor (A-]) was attempted. However, after penetrating about 4 feet below grade, the anchor spun. There was no additional penetration even with a man standing on the motor. The adjacent anchor (A-2) and the comer (A-4) were both attempted with similar results. Davis then proposed to cut the 8'�-10"-12" lead anchor assembly between the 8" and 10" helices, and weld the 8" helix and square bar to a straight extension bar producing a single 8" helix anchor. Davis also proposed to increase the pitch oftbe 8" helix by hammering it open further to obtain better penetration into the subsoils. According to the chance anchor literature, a single 8" helix ins alled to 2500 foot-pounds oftorque will have an ultimate capacity of at least 12.000 lbs. At their field -located spacings and assumed wall load of 1,000 pounds per Iffical foot, the proposed modification to the anchors will have adequate bearing capacity to support the house loads. We accepted the proposed modifications. I left the site at noon with the request that 1 be called when they were ready to proceed. I returned around 2:30 PM, and southemmost two anchors (A- I and A-2) had already been installed. According to Davis, they penetrated about six inches into the dense hard layer. I observed the installation oftwo more anchors to refusal, (A-4 and A-5). Soils at the bottom oftbe foundations in the exposed holes consisted ofreddish brown, silty fine sand with silt and gravel to about 4 feet below grade in the soutberninost excavations. The anchors went slightly deeper as the north side ofthe house was approached. From A- I to A-7, the depths were approximately 5', 5', 5', T, T, 6', 7' below L, I left the site at about 3:45 PM, Signed: Reviewed: Z 0 M Ma 0 0 C M m to �_Z C M O"n i M M a 0 M 0 Z 7`1 Z 00 Z 0 M F—Job N . Page No. 2002-000-6 1 of I Report No, Data 2 Aug 12,2002 Project N me 11 All —a Day of the Week Thomas Residence 9804 215"' St. SW, Edmonds WA Monday James and Mary Thomas Pe -it No, Edmonds 2002-0559 Weather Temp. IF Sunny 701's Clie"I HWA Project Engineer Jam es and Mary Thomas James and Mary Thomas Erik Andersen Contract. 11VVA Fill Davis Construction Dc'o"'n' pli ra"n, Susan"RR�opltarge E:: zt 0 p'� 0 M WE NOTED THE FOLLOWING: (Contractor Activities, HWA Activities, Outstanding Issues, Resolutions) I arrived at the Thomas Residence at 9:40 AM. Davis Construction bad already placed brackets on anchors A-1,through A-6, and were preparing to place the bracket on A-7. Anchors A- 1, A-2, and A-3 were already bolted to the foundation. MO1 Using the jacks, the load was transferred to the anchors via the brackets. Once the bracket bolts had been tightened, the -4 0 jacks were removed, and the rest of the brackets were attached to the foundation with bolts. I left thejob site at 11:15 AM, after all ofthe brackets had been tightened down and bolted to the foundation. At the time M M of my departure, Davis Construction was preparing to backfill the excavations. > Z' r- In summary, the job was completed in general accordance with the intent of our recommendations, and within the permit 5i requirements. 0 'n 2D M 0 0 n 0- AND M z 71 0 z 36468 4*4 GIs S. ONA L V-11;�l A-0ci I-LI DL Z' EXPIRES 08/18/07- 0 M Signed: &.1 Reviewed: Proiccl 't-M —um—o-v "i'li"ONGWEST pfot'ieNo. "2'= ASSOCIATES, INC. Date 'Calculations for Made by'- C, rZ .......... . 9 ..... . ...... . b' A L'o co O� -a(2� 1 e, OLZ� 6 %l0eAb-W J� L -j ..... ...... z m RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS .................... FOUNDATION: Footing ...................... wall Piet/Porch ............... Retaining Wall Stab Insulation .......... PLUMBING: Undergro und ............. Rough -in ............... Commercial Final HEATING: Gas Test Gas Piping Equipment Commercial Final EXTERIOR SHEATHING NAILING ............ FRAMING ................ FIRST FLOOR FRAMING INSULATION ................... Floor Insulation Wall Insulation ........... Ceiling Insulation SHEETROCK NAILING SPECIAL INSPECTION MISCELLANEOUS .......... FINAL APPROVAL FOR OCCUPANCY ............ z M