20020615.pdfFINAL PROJECT APPROVAL FORM
TO:_
DATE: -
MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION
FROM: —FIRE DEPARTMENT DATE-
1) -ENGINEERING DIVISION DATE —
PLANNING DIVISION DATE—
PROJECT--*
SITE ADDRES
PERMIT # )10 ADB# TED_4�0'-7_
INSPEC
DESCRIPTION OF WORK TO BE. INSPECT
A field inspection was conducted to determine final compliance with approved plans. Final approval
denotes that there are no objections from the above signed Department to the release of
PE RMANCE BONDS and the granting of:
__�ZGRANT FENAL PROJECT APPROVAL
GRANT PROJECT APPROVAL WITH CONDITIONS NOTED
u Copy of CONDITIONS given to owner/contractor by inspector
FAILED FINAL INSPECTION - OUTSTANDING ISSUES
u Copy of CORRECTION NOTICE given to owner/contractor by inspector
2.
3.
RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL
Date_, Sigo�
ocaprvi.doc.l:temp:bldg:fonnsIO/OI
z
0
0
n
M
M 0
0
80
In M
z
-4
5
0 -n
in A
055
0 r-
0 M
C U)
9 ch
Q 0
z
--i
z
M
RECORD OF INSPECTIONS
INSPECTOR DATE APPROVED
SETBACKS .....................
FOUNDATION:
Footing ..............
"Wall.
z
0
Retaining Wall
Slab Insulation
PLUMBING:
M
Underground .............
M
0
0
Rough -in
C
commercial Final
M
M Z
JD
HEATING:
GasTest ... .................
Ga s Piping .................
Equipment ...........
M ITI
Commercial F461
0
0
EXTERIOR SHEATHING
0
C
NAILING .................
M V)
M C)
FRAMING ......................
F
FIRST FLOOR FRAMING
;D
INSULATION .. .................
Floor Insulation
Wall Insulation ...........
Z,
Ceiling Insulation
SHEETROCK NAILING
M
SPECIAL INSPECTION
MISCELLANEOUS ..........
FINAL APPROVAL FOR...
t OCCUPANCY ...............
C/