Loading...
20020615.pdfFINAL PROJECT APPROVAL FORM TO:_ DATE: - MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: —FIRE DEPARTMENT DATE- 1) -ENGINEERING DIVISION DATE — PLANNING DIVISION DATE— PROJECT--* SITE ADDRES PERMIT # )10 ADB# TED_4�0'-7_ INSPEC DESCRIPTION OF WORK TO BE. INSPECT A field inspection was conducted to determine final compliance with approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PE RMANCE BONDS and the granting of: __�ZGRANT FENAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED u Copy of CONDITIONS given to owner/contractor by inspector FAILED FINAL INSPECTION - OUTSTANDING ISSUES u Copy of CORRECTION NOTICE given to owner/contractor by inspector 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date_, Sigo� ocaprvi.doc.l:temp:bldg:fonnsIO/OI z 0 0 n M M 0 0 80 In M z -4 5 0 -n in A 055 0 r- 0 M C U) 9 ch Q 0 z --i z M RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ..................... FOUNDATION: Footing .............. "Wall. z 0 Retaining Wall Slab Insulation PLUMBING: M Underground ............. M 0 0 Rough -in C commercial Final M M Z JD HEATING: GasTest ... ................. Ga s Piping ................. Equipment ........... M ITI Commercial F461 0 0 EXTERIOR SHEATHING 0 C NAILING ................. M V) M C) FRAMING ...................... F FIRST FLOOR FRAMING ;D INSULATION .. ................. Floor Insulation Wall Insulation ........... Z, Ceiling Insulation SHEETROCK NAILING M SPECIAL INSPECTION MISCELLANEOUS .......... FINAL APPROVAL FOR... t OCCUPANCY ............... C/