Loading...
20020704.pdf­X DATE RECEIVED PERMIT EXPIRES us' CITY OF EDMONDS ZONE CONSTRUCTION PERMIT APPLICATION JOB Sti ADDRESS ER =USt _J. PLAT NAMEISUBDIVISION NO. LID NM ING ADDRESS FLAT Lt. FEE PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP EXISTING — PROPOSED- A.' -'L. F -DICATION Ff 147 PEOU:RED BE I M E RV REQUIRED ETER SIZE 'IN' NO. OF FIXTURES P Is I 0_ j YESCI NO'4 REMARKS OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROL1.1-- ZIP I TELEPHONE I CITY ZIP TELEPHONE STATE LICENSE NUMBER EXPIRATIOR BrTi I CHECKED BY TJ "7 4W 1 1) ) 1 00 1 1 1117 (Y) gl NEW W_aE-UI-Nm- 0��ME.hl ADDITION 0 COMMERCIAL 0 COMPLIANCE OR CHANGE OF USE REMODEL APARTMENT SIGN [3 REPAIR '6 - I cyo M FENCE X IT) — DEMOLISH 0 TANK OTHER WANAGE CA PORT RETAIN WALL 11 R 0 C K E'RNYG HENEWAL (ME OF USE, BUSINES;,�Illl. NUMBER OF N li OF 0 FLUNO STORIES UNITS DESCRIBE WORK TO BE DONE FIRE REVIEWED By DATE VARIANCE OR CU SHORELINE OR ADO# INSPECTION PSOND 13 YREO'D DOTED ES 0 NO $EPA RENIEW SIGN AREA HEIGHT COMPLETE EXEMPT ALLOW D ALL, �Xp I x I ;`I I Palo LOT COVERAGE REQUIRED SETRATKS IFT) PROPOSED SETBACKS (Fr.) ALL FRONT I SIE REAR I FRONT I 7Y -7 7' 15 -b 7' PAR /A&TI REC' PROVIDED " I CHICKEOBY I TYPE OF CONSTRUCT ON 111UPANT SPECIAL INSPECTOR NT R SQUIRED jA"EA OCCU 0 YES 5go III. LOAD REMARKS PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION REaD VALUATION $ Description FE Description FEE Plan Check I j HFAT�ORCE GLA�Z % I Ll 7PE % t' BU liding ------- 4-\ ------ PLAN CHEM 111T11 DATE Plu bing lio - Mechanical _'_�2 _ _72 ' THIS PERMIT AUTHORIZES ONLY THE OnK NOTED. THIS PERMIT COVERS WORK TO 5 DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUB LUC -- Grading Recording Fee DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) W ILIL REQUIRE SEPARATE PERMISSION. Engr. Review city surcharge PEI' D'APPUCATUM: INDAYS PERMIT UMIT I YEAR - PROVID D WORK 15 STARTED WITHIN ISODAYS SEE BACK OF PINK PERMIT FOR MORE INFORMATION Engr. Inspection I State Surcharge 'APPLICANT' ON BEHALF 01 HIS 01 HER 1POISE, HEIII, 1111111,11 AND SUCIE11111 Trallin Wfigation Plan Chk Deposit Fire Review Receipt # IN INTEREST, AGREES TO INDEMi Di AND HOLD HARMLESS THE CITY OF ITS OFFICIALS, AND AGENTS FROM ANY AND EO10NDS. WASHINGTON, LMPLOYECS. ALL CLAIMS FOR DAMAGES OFWHATENER NATURE ARISING DIRECTLY OR INDIRECTLY OF THIS PERMIT, SSUANCi OF THIS PERMIT SHALL NOT BE FROM THE ISSUANCE 0 TO MODIFV, WA E OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINA OF Fire Inspection Total Amount Due 15 N=IT IN ANY WAY THE CI�S ABILITY TO ENFORCE ANY ORDINANCE PROVISION.- Landscapeinsp. Receipt At APPLICATION APPROVAL READ THIS APPLICATION; THAT THE INFORMATION I HEREBY ACKNOWLEDGE THAT � Hi GIVEN IS CORRECT, AND THAT AM OWNER, OR THE DULY AUTHORIZED AGENT OF E OWNER I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- This spiritso on Nool a poomil until signed by the TH 1—ii B.Ild.olt Olftl.t o, i Duphy:.nd r—in. psild. no TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTO14 RELATING To FOR INSPECTION —.1iol—ko-loda. —P.-Po. r WOFIKMENNS COMPENSATION INSURANCE AND RCW 18,27, DATE INE OR DATE SIGNE (425) -0-t -I 771-0220 Early DATE EXT 1333 ATTENTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL 771 -022 1 A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- ORIGINAL - FILE YELLOW - INSPECTOR/ CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 FAX PINK -OWNER GOLD - ASSESSOR 10/01 z 0 4 0 C: IT'll rn 00 80 C -4 N = ITT IT 0 C: 0 ITT RI 0 Vi 0 0 Fn i Oe IT 0 Z F­ .4� X :0 > z -4 z 0 q 5 IT Height Calculation V Address: Date: 1-1 z- ?a� Inspector(s): VYIJ 1. Datum Point:-T-&-�-��,-,, pck 2. Datum Point Elevatiow. —100 3. Average Grad-: CI 01 4. Maximum Elevation Allowed: (averag. 5. Reference Point Elevation Shot to House: (datum elevation)+ Lp,01 (gradetotran: 6. Measurements from line shot onto house to roof r -7, Total 7 7. Actual Elevation: (reference point ele, from #6) = 1 IS Conclusion: (actual) is greater /( Ce.r.�7" _Zj±:f is not over the height requirement per ECDC 16.2 L:\TEW\BUILDlNG%GSC\Height Calculation Worksheet.doi ,rksheet N-� z 0 0 de) +X, 55 0, M, M 0', 0., level line shot to house) 0 0, M rn M 0 0 X z Z: 0: m ton) + -7 (measurements allowed); therefore the house is/ 50 requirements 0 ER]CONTRACTOR IS RESPONSIBLE E IDA '�Tv ADD GUTTERSIDOWNSPOUTS Ft EROSION CON T�L AND -copy AND SPLA94BLOCKS 11 1r L 21-0 L TFLePtAoW9 Fo L ECEIV U-2 0 WAT WATETR 19 JUN - 7 20OZ P IONS tL FINSPE(, L 426-7�71-02-20619kl3'i6— BUILDING DEPT. ',A)D CONTACT OLYMPIC VIE 'y GUTTI RS/DOWNSPOUITS ATER/SIWER DISTRI(T W W T -1 AND 8 ILASHBLOCKS 11 v'-p Lxq -co sow ep-- r, L 2� IN RI B4 ENGINEE Date: -ro 0 4iZANet. I -T L A V-e-fmecl ZONE iRESS QOMTft PROJE WE ELKINS SCOPE OF PROJECT: 'FrA 9805 234T" SW FRONT NEW DETACBED GARAGE. 589.5 SQ Fr. f- q EDMONDS 99020 SOL S06, LOT SIZE: 70'x 120' 9400 SQ FT :12- -425 542 0384 R EA H OTHEH — LOT COVERAGE: TAX Nw. 5548 002 001 0300 HEIGH1 EXISITNG RESIDENCE: 1255.6 SQ Fr LEGALkC PROPOSED: IjMoND FRIAT GARDENS TRACTS, BLK 002 D-03 N 70 Fr OF RESIDENCE: 1255.6 SQFT E 150 Fr OF s% LOT I LESS 30 FT THOF & TGWUND 1/3 RfF IN NEWGARAGE 589.5 SO pRIVATE ROAD OVER SD E 30 Fr OF S 1/2 SD LOT AKA LOT I SP 89 (4-81). TOTAL: 1841.1 SQ Fr 21.91/o FINAL PROJECT APPROVAL FORM TO: DATE: PERMIT COORDINATOR, BUILDING DIVISION. FROM: FIRE DEPARTMENT DATE CV U615�1 --ENGINEERING DIVISION DATE— z PL DIVISION DATE PROJECT SITE ADDRESS M C rn 0 pERWr # ;00 2, - 0*7o #__________DATE INSPECTED— 80 C M DESCRIPTION OF WORK TO BE INSPEC M z A field inspection was conducted to determine flual compliance with approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: 0 -n 'n V M rn GRANT FINAL PROJECT APPROVAL C/) 0, 0 M C9 Q 0 Z r- X GRANT PROJECT APPROVAL WYrH CONDITIONS NOTED -4 u Copy of CONDITIONS given to owner/contractor by inspector z co z 0 1 FAILED FINAL INSPECTION - OUTSTANDING ISSUES F) u Copy of CORRECTION NOTICE given to owner/contractor by inspector. M 2. 3. RE-INSpEcTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date-- Sign_ ocaprvl.doc.l:tenip;bldg:fomisIO/OI RECORD OF INSPECTIONS INSPECTOR DATE APPROVED SETBACKS ............ FOUNDATION: Footing ............ Wall.......................... Pier/Porch .......... Retaining Wall ........... Slab Insulation .......... PLUMBING: 0 Underground ............. C In Rough -in ................... 0 0 Commercial Final -j z rn HEATING: M Z Gas Test .................... Gas Piping ................. Equipment .............. 0 n "n 3) Commercial Final -1 x M IT! EXTERIOR SHEATHING NAILING C.7 0 0 .......................... K C FRAMING ............ ........... Q 0 FIRST FLOOR FRAMING... INSULATION ................... Floor Insulation z Wall Insulation ........... Ceiling Insulation z SHEETROCK NAILING SPECIAL INSPECTION M MISCELLANEOUS .......... FINAL APPROVAL FOR 9-) OCCUPANCY .................. KID Ij v?04e -e 74